Block 1047, lot 033
2951 Pine St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 1
- Units
- 2
- Rooms
- 4 bathrooms
- Building
- 4,509 sq ft
- Lot
- 3,438 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 13, 2016 | Completed final sign-off Dec 2016 | 2951 Pine St | K K Electric & Alarm Company | install fire sprinkler flow & supervisory system. ref 201503039811 & 201606089417Details
install fire sprinkler flow & supervisory system. ref 201503039811 & 201606089417 | $3,800 |
| Aug 29, 2016 | Completed final sign-off Dec 2016 | 2951 Pine St | K K Electric & Alarm Company | install fire sprikler flow and supervisory system. ref app#201503039811.Details
install fire sprikler flow and supervisory system. ref app#201503039811. | $1,000 |
| Jun 8, 2016 | Completed final sign-off Dec 2016 | 2951 Pine St | R Lowy Fire Protection Inc | new fire sprinkler system for single family residence per nfpa 13r. ref pa 2015-0303-9811 (s1)Details
new fire sprinkler system for single family residence per nfpa 13r. ref pa 2015-0303-9811 (s1) | $9,000 |
| May 11, 2016 | Completed final sign-off Dec 2016 | 2951 Pine St | Ampex Engineering & Co | upgrade foundation within envelope of existing building per plan.Details
upgrade foundation within envelope of existing building per plan. | $50,000 |
| Mar 31, 2016 | Never finaled filed Mar 2016, never issued | 2951 Pine St | street space | ||
| Mar 18, 2016 | Completed final sign-off Dec 2016 | 2951 Pine St | The Toboni Group | exploratory removal of finishes on all floors. all interior work, no structural.Details
exploratory removal of finishes on all floors. all interior work, no structural. | $12,000 |
| Mar 3, 2015 | Completed final sign-off Dec 2016 | 2951 Pine St | The Toboni Group | new 3rd floor addition. new rear addition & deck at 2nd floor. interior remodel to include kitchen, additional bath & misc. replace (e) garage door.Details
new 3rd floor addition. new rear addition & deck at 2nd floor. interior remodel to include kitchen, additional bath & misc. replace (e) garage door. | $480,000 |
| Apr 22, 2005 | Never finaled issued Apr 2005, no final | 2951 Pine St | Home Works Inc/Kitchen Work Inc | replace 3 windows, size for size, alum to wood composite. not visible from st.Details
replace 3 windows, size for size, alum to wood composite. not visible from st. | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- K K Electric & Alarm Company (2), The Toboni Group (2), Ampex Engineering & Co, Home Works Inc/Kitchen Work Inc, R Lowy Fire Protection Inc
- Architects
- Dan Phipps (2)
- Engineers
- Don David
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.