Rossi Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Apr 2026
- Last 24 months
- 12 permits filed
498 permits since 2000: 408 completed, 8 in progress, 47 never finaled, 35 expired or cancelled.
Of the 47 never-finaled permits, 5 are 3 to 5 years old, 15 are 5 to 10 years old, 27 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
17 stairs permits: 15 completed, 1 in progress, 1 never finaled. Typically 18 days from filing to permit and 191 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2024 | Completed final sign-off Jan 2025 | 390 09th St | voluntary seismic upgrade. add power door operator to restroom 1, replace (e) restroom signage, replace (e) stair handrails and guardrailsDetails
voluntary seismic upgrade. add power door operator to restroom 1, replace (e) restroom signage, replace (e) stair handrails and guardrails | $250,000 |
| Oct 11, 2022 | In progress issued Feb 2024 | 502 Jefferson St | exterior alteration & additions & interior remodel to an (e) 2-story wood frame bldg. 1st fl: demo & replace (e) 1-story kitchen & weight rm approx 887 sq. 2nd fl: (n) roof deck atop weight rm approx 605 sf, extend (e) egress stair. roof: remove/replace access stair & walkway to (e) cupolaDetails
exterior alteration & additions & interior remodel to an (e) 2-story wood frame bldg. 1st fl: demo & replace (e) 1-story kitchen & weight rm approx 887 sq. 2nd fl: (n) roof deck atop weight rm approx 605 sf, extend (e) egress stair. roof: remove/replace access stair & walkway to (e) cupola | $1,252,000 |
| Nov 29, 2021 | Completed final sign-off Apr 2022 | 4 Embarcadero Center | 32/f: ref #202109178613. modify wall separating office from convenience stair per sffd plan check. revise womens bathroom layout. minor modification to some offices.Details
32/f: ref #202109178613. modify wall separating office from convenience stair per sffd plan check. revise womens bathroom layout. minor modification to some offices. | $100 |
| Sep 17, 2021 | Completed final sign-off Apr 2022 | 4 Embarcadero Center | partial office ti on 32nd fl. 21,500 sf. incl new private offices partial restroom remodel. encl stair to 31st fl w/2hr rating no changes to site, ext appear or (e) bldg struc are required. modifications to mech, elec, plumb, automatic fire sprinkler and fire alarm to be submitted under sep permits.Details
partial office ti on 32nd fl. 21,500 sf. incl new private offices partial restroom remodel. encl stair to 31st fl w/2hr rating no changes to site, ext appear or (e) bldg struc are required. modifications to mech, elec, plumb, automatic fire sprinkler and fire alarm to be submitted under sep permits. | $1,200,000 |
| Oct 22, 2020 | Completed final sign-off Nov 2021 | 360 Spear St | 4/f: work includes modifications to base building electrical and mechanical systems, new finishes and lighting in stairs, and implementation of base building utility sub metering, no work is proposed in spaces occupied by internet service exchange uses on the 2nd and 5th floors. no exterior workDetails
4/f: work includes modifications to base building electrical and mechanical systems, new finishes and lighting in stairs, and implementation of base building utility sub metering, no work is proposed in spaces occupied by internet service exchange uses on the 2nd and 5th floors. no exterior work | $75,000 |
| Jan 8, 2016 | Completed final sign-off Oct 2017 | 1126 Howard St | revision to app#201505297576 for new stair location interior only. n/a for maherDetails
revision to app#201505297576 for new stair location interior only. n/a for maher | |
| Nov 18, 2015 | Completed final sign-off Feb 2016 | 450 Shotwell St | non structural demo in (e) 2 story light industrial bldg. scope includes demo of non-structural. partitions, mezzanine, stairs non-structural demising walls per ab-017Details
non structural demo in (e) 2 story light industrial bldg. scope includes demo of non-structural. partitions, mezzanine, stairs non-structural demising walls per ab-017 | $10,000 |
| Sep 28, 2015 | Completed final sign-off Apr 2016 | 450 Shotwell St | revision to 201501286911. demo of e mezzanines, stairs, shift of new bathrooms, revised config of new rated exit corridor and construction of communicating wall opening. n/a ordinance #155-13Details
revision to 201501286911. demo of e mezzanines, stairs, shift of new bathrooms, revised config of new rated exit corridor and construction of communicating wall opening. n/a ordinance #155-13 | |
| Aug 6, 2015 | Completed final sign-off Jun 2016 | 625 02nd St | 1/f & 2/f- t.i. includes demo of non structural partition & build (n) non structural partitions. (n) interconnecting stair down to ground floor, all new or revised mep. & life safety, sprinklers under seperate permit. n/a ordinance #155-13Details
1/f & 2/f- t.i. includes demo of non structural partition & build (n) non structural partitions. (n) interconnecting stair down to ground floor, all new or revised mep. & life safety, sprinklers under seperate permit. n/a ordinance #155-13 | $744,527 |
| May 29, 2015 | Completed final sign-off Oct 2017 | 1126 Howard St | voluntary upgrade of restroom facilities at 1st fl and mezzanine, new egress stairs from mezzanine to 1st fl, misc interior partitions 1st fl and mezzanineDetails
voluntary upgrade of restroom facilities at 1st fl and mezzanine, new egress stairs from mezzanine to 1st fl, misc interior partitions 1st fl and mezzanine | $100,000 |
| Apr 16, 2015 | Never finaled issued Apr 2015, no final | 340 Pine St | basement & grnd flr: removal of (e) finishes & rail at (e) stair to remain to be abandoned in place. (n) flr slab at grnd flr. & (n) partition at basement to encapsulate stair, providing new partitions, door, power and data, and finishes maher - not req'dDetails
basement & grnd flr: removal of (e) finishes & rail at (e) stair to remain to be abandoned in place. (n) flr slab at grnd flr. & (n) partition at basement to encapsulate stair, providing new partitions, door, power and data, and finishes maher - not req'd | $40,000 |
| Mar 17, 2015 | Completed final sign-off Oct 2015 | 333 Bush St | demolition of e non structural partitions, doors/frames, millwork, plumbing, ceiling and floor finishes on 32nd fl. demo of e interconnecting stairs btw 32nd and 33rd fl and refill slabs as req to separate floors. flr 32 to 34 are currently unoccupied. ab-017. life safety deferred.Details
demolition of e non structural partitions, doors/frames, millwork, plumbing, ceiling and floor finishes on 32nd fl. demo of e interconnecting stairs btw 32nd and 33rd fl and refill slabs as req to separate floors. flr 32 to 34 are currently unoccupied. ab-017. life safety deferred. | $150,000 |
| Nov 19, 2014 | Completed final sign-off Oct 2017 | 1126 Howard St | voluntary accessibility upgrade to connect the existing mezzanine level to existing elevator at the rear of the building with new walkway thru dbl height space and new ceiling lid below and enclose existing stair access to 2nd fl. at mezz level. n/a for maher.Details
voluntary accessibility upgrade to connect the existing mezzanine level to existing elevator at the rear of the building with new walkway thru dbl height space and new ceiling lid below and enclose existing stair access to 2nd fl. at mezz level. n/a for maher. | $80,000 |
| Jun 28, 2013 | Completed final sign-off Feb 2015 | 2430 Mission St | basemnt/1st/2nd floors-ti for credit union-work includes new partitions, fixtures, finishes, bathrooms, m.e.p, stairs. exterior work under seperate permit. fire protection under seperate permitDetails
basemnt/1st/2nd floors-ti for credit union-work includes new partitions, fixtures, finishes, bathrooms, m.e.p, stairs. exterior work under seperate permit. fire protection under seperate permit | $350,000 |
| Apr 13, 2011 | Completed final sign-off Aug 2011 | 1565 Bush St | interior remdeling on 1st floor, remodel existing sale office spaces, break room, voluntary upgrade (e) restroom to ada restroom, add new stair to basement, and new 2nd exit.Details
interior remdeling on 1st floor, remodel existing sale office spaces, break room, voluntary upgrade (e) restroom to ada restroom, add new stair to basement, and new 2nd exit. | $85,000 |
| Mar 23, 2011 | Completed final sign-off Aug 2011 | 1565 Bush St | interior demolition-remove non bearing partition, plumbing fixtures & light fixtures & stairsDetails
interior demolition-remove non bearing partition, plumbing fixtures & light fixtures & stairs | $3,000 |
| Mar 7, 2011 | Completed final sign-off May 2011 | 200 Sansome St | install new stairs at elevator penthouse on roof as required per pa #2010.12.28.7514.Details
install new stairs at elevator penthouse on roof as required per pa #2010.12.28.7514. | $2,000 |