Back to kitchen remodel contractors
Plant Construction Co, Lp
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 57 permits filed
672 permits since 2000: 455 completed, 72 in progress, 96 never finaled, 49 expired or cancelled.
Of the 96 never-finaled permits, 25 are 3 to 5 years old, 42 are 5 to 10 years old, 29 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 14 completed, 2 in progress. Typically 97 days from filing to permit and 366 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 100 Columbus Av | revision to pa# 2024-0205-5285, 2024-1001-2038; provide commercial kitchen at level 1 and utility(scullery) room at basement.Details
revision to pa# 2024-0205-5285, 2024-1001-2038; provide commercial kitchen at level 1 and utility(scullery) room at basement. | |
| Oct 2, 2024 | Completed final sign-off Apr 2025 | 222 02nd St | 3rd fl - replacement of existing kitchen equipment in pot wash room. 20% ada restroom upgrades. no change in fixture quantities; occupant load calculations or path of travelDetails
3rd fl - replacement of existing kitchen equipment in pot wash room. 20% ada restroom upgrades. no change in fixture quantities; occupant load calculations or path of travel | $30,000 |
| Feb 5, 2024 | In progress issued Sep 2024 | 100 Columbus Av | erect a one-story building plus basement, to include employee assembly room, kitchen, single-accomodation restrooms & support spaces. provide exterior enclosure around utility equipment. hardscape and landscape improvements and solar voltaic system on roof of 100 columbus st. under separate permits.Details
erect a one-story building plus basement, to include employee assembly room, kitchen, single-accomodation restrooms & support spaces. provide exterior enclosure around utility equipment. hardscape and landscape improvements and solar voltaic system on roof of 100 columbus st. under separate permits. | $2,100,000 |
| Nov 9, 2022 | Completed final sign-off Jul 2025 | 5630 Mission St | 100% affordable housing. bldg c - interior sow: (n) offices, meeting rooms, storage, ada bathroom, lobby, community room w/ warming kitchen. exterior sow: repurposed areas for (n) offices, community room, and open space. deferred submittals: sprinkler and alarm systems.Details
100% affordable housing. bldg c - interior sow: (n) offices, meeting rooms, storage, ada bathroom, lobby, community room w/ warming kitchen. exterior sow: repurposed areas for (n) offices, community room, and open space. deferred submittals: sprinkler and alarm systems. | $1,509,900 |
| Nov 7, 2022 | Completed final sign-off Mar 2025 | 3055 16th St | mayor ed 13-01. 100% affordable. grd lvl and bsmt only interior improvement. sow: repurpose g/fl of former retail location to a reception, offices, exercise rm, residents non-cooking/warming only kitchen, enterepreneurial space, offices, bsmt remains storage & mechanical equip. space. new windows...Details
mayor ed 13-01. 100% affordable. grd lvl and bsmt only interior improvement. sow: repurpose g/fl of former retail location to a reception, offices, exercise rm, residents non-cooking/warming only kitchen, enterepreneurial space, offices, bsmt remains storage & mechanical equip. space. new windows... | $700,000 |
| Oct 21, 2022 | Completed final sign-off Aug 2024 | 1950 Mission St | (n) metal stud walls (interior) w/ gyp b, (n) interior doors, (n) office and kitchenette, utility sinks. interior ti to art studios. max 5 gl. total of darkroom chemical to be stored on site.Details
(n) metal stud walls (interior) w/ gyp b, (n) interior doors, (n) office and kitchenette, utility sinks. interior ti to art studios. max 5 gl. total of darkroom chemical to be stored on site. | $50,000 |
| Oct 13, 2021 | Completed final sign-off Nov 2022 | 50 03rd St | renovation to extg 1st floor kitchen to include addition of new walk in cooler and renovation to extg service stations.Details
renovation to extg 1st floor kitchen to include addition of new walk in cooler and renovation to extg service stations. | $75,000 |
| Dec 20, 2018 | Completed final sign-off Dec 2020 | 2230 Jerrold Av | erect 2-story, type 5b, no basement, no dwelling unit, production kitchen & support building. maher n/a.Details
erect 2-story, type 5b, no basement, no dwelling unit, production kitchen & support building. maher n/a. | $10,471,820 |
| Nov 8, 2017 | Completed final sign-off Nov 2018 | 355 Mcallister St | propose project consists of a vertical addition (type v-b) accessory structure of a commercial food service kiosk cafe with a gross area of approxmately 640 sf. this will built on top of (e) below grade structure brooks hall. addition consists of commercial kitchen, staff & patron restroom.Details
propose project consists of a vertical addition (type v-b) accessory structure of a commercial food service kiosk cafe with a gross area of approxmately 640 sf. this will built on top of (e) below grade structure brooks hall. addition consists of commercial kitchen, staff & patron restroom. | $850,000 |
| Oct 23, 2017 | Completed final sign-off Jan 2019 | 830 Ortega St | reconfiguration of lower garage level interior to enlarge living space & add laundry room. at main level, renovate kitchen, dining & bath. remodel front facade to remove columns & pediment. rew rearyard stair and door from main level.Details
reconfiguration of lower garage level interior to enlarge living space & add laundry room. at main level, renovate kitchen, dining & bath. remodel front facade to remove columns & pediment. rew rearyard stair and door from main level. | $120,000 |
| Mar 15, 2016 | Completed final sign-off Aug 2016 | 1555 Mariposa St | convert shell space into commercial kitchen: new partitions & ceilings, new lighting, plumbing, hood and exhaust fan; n/a maher ord. 155-13Details
convert shell space into commercial kitchen: new partitions & ceilings, new lighting, plumbing, hood and exhaust fan; n/a maher ord. 155-13 | $60,000 |
| Mar 3, 2016 | Completed final sign-off May 2016 | 151 03rd St | reroute catering kitchen hood exhaust to compliant discharge location on 3rd level roof. there are no kitchen equipment changes to the catering kitchen, maher n/aDetails
reroute catering kitchen hood exhaust to compliant discharge location on 3rd level roof. there are no kitchen equipment changes to the catering kitchen, maher n/a | $50,000 |
| Feb 24, 2016 | Completed final sign-off Apr 2017 | 1639 Oak St | revision to arch/mep addendum 201501266630-s4, health dept review of proposed kitchen located on 1st flDetails
revision to arch/mep addendum 201501266630-s4, health dept review of proposed kitchen located on 1st fl | |
| Oct 21, 2015 | Completed final sign-off Apr 2016 | 151 03rd St | interior renovation of sfmoma & sfmoma expansion - ref pa 2012 1109 3897. new cofee bar in (e) level 3 gallery space with work area to make a serve coffee and pastries prepared offsite. renovation of (e) cafe kitchen at level 5 - sculpture garden. maher ord n/a.Details
interior renovation of sfmoma & sfmoma expansion - ref pa 2012 1109 3897. new cofee bar in (e) level 3 gallery space with work area to make a serve coffee and pastries prepared offsite. renovation of (e) cafe kitchen at level 5 - sculpture garden. maher ord n/a. | $350,000 |
| Dec 23, 2013 | Completed final sign-off Apr 2016 | 927 Post St | voluntary structural reinforcing & renovation of an(e)1-story bldg, w/ basement. replace of steel structure, floor framing & basement floor slab. replace interior finishes, install(n)commerical kitchen, handicapped restrm & material lift. install(n)storefront. no add'l floors, no change in occupancyDetails
voluntary structural reinforcing & renovation of an(e)1-story bldg, w/ basement. replace of steel structure, floor framing & basement floor slab. replace interior finishes, install(n)commerical kitchen, handicapped restrm & material lift. install(n)storefront. no add'l floors, no change in occupancy | $550,000 |
| Mar 5, 2003 | Completed final sign-off Nov 2003 | 2389 Washington St | interior alterations including new kitchen, bathrooms, interior partitions, electr/plumbingDetails
interior alterations including new kitchen, bathrooms, interior partitions, electr/plumbing | $135,000 |