Plant Construction Co, Lp
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 57 permits filed
672 permits since 2000: 455 completed, 72 in progress, 96 never finaled, 49 expired or cancelled.
Of the 96 never-finaled permits, 25 are 3 to 5 years old, 42 are 5 to 10 years old, 29 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
6 deck permits: 3 completed, 1 in progress, 2 never finaled. Typically 6 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2023 | In progress issued Dec 2023 | 270 Masonic Av | the structural scope is an addition to the parking deck rehabilitation permit under 202309196898Details
the structural scope is an addition to the parking deck rehabilitation permit under 202309196898 | |
| Sep 19, 2023 | Never finaled issued Sep 2023, no final | 270 Masonic Av | remove & reinstall (n)concrete surface wear of parking lot deck. (n) insulation & waterproof. repl 2/f open terrace waterproof/paving w/(n) insulation, waterproof & pedestal paving system. remove glass panel steel canopy & steel support dumnage at main entry due to life safety concerns.Details
remove & reinstall (n)concrete surface wear of parking lot deck. (n) insulation & waterproof. repl 2/f open terrace waterproof/paving w/(n) insulation, waterproof & pedestal paving system. remove glass panel steel canopy & steel support dumnage at main entry due to life safety concerns. | $975,000 |
| Aug 25, 2017 | Completed final sign-off May 2018 | 1155 Vallejo St | dryrot repairs to rear elevation and third floor rear deck of house per plan.Details
dryrot repairs to rear elevation and third floor rear deck of house per plan. | $150,000 |
| May 4, 2017 | Completed final sign-off Sep 2020 | 198 Potrero Av | change of use from restaurant(partial 2nd fl) to legitimize (e) office. exterior upgrades, demo include remove exterior door, fire escape, sidewalk, roof, deck & stair, skylights. accessible entrance, service door, deck, stair & rr upgrade strengthen roof frame. (2nd fl occupied, 1st & mezDetails
change of use from restaurant(partial 2nd fl) to legitimize (e) office. exterior upgrades, demo include remove exterior door, fire escape, sidewalk, roof, deck & stair, skylights. accessible entrance, service door, deck, stair & rr upgrade strengthen roof frame. (2nd fl occupied, 1st & mez | $300,000 |
| Nov 24, 2014 | Completed final sign-off Sep 2015 | 2 New Montgomery St | new tiles on pool deck and inside pool and spa; demo tile file and approved under pa#201410279985. compliance with maher ordinance no. 155-13 not required.Details
new tiles on pool deck and inside pool and spa; demo tile file and approved under pa#201410279985. compliance with maher ordinance no. 155-13 not required. | $20,000 |
| Oct 27, 2014 | Never finaled issued Oct 2014, no final | 2 New Montgomery St | 4th flr: interior non-structural demo of floor tile, around pool area on 4th flr for deck, pool interior & whirlpool, tiles will be replaced in a deferred t.i. submittal; maher n/aDetails
4th flr: interior non-structural demo of floor tile, around pool area on 4th flr for deck, pool interior & whirlpool, tiles will be replaced in a deferred t.i. submittal; maher n/a | $15,000 |