Peacock Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Nov 2015
- Last 24 months
- 0 permits filed
890 permits since 2000: 763 completed, 60 never finaled, 67 expired or cancelled.
Of the 60 never-finaled permits, 60 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 7 completed, 1 never finaled, 2 expired or cancelled. Typically 5 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2011 | Completed final sign-off May 2012 | 4 Embarcadero Center | new finishes and fixtures in extg restrooms. new ada compliant drinking fountain. demo unused interconnection, stair btwn 29th and 30th floors in the tenant space and infill the stair slab opening w/a new structural slab per structural dwgs,suspended ceiling in the bathrooms. mep & life safety sep.Details
new finishes and fixtures in extg restrooms. new ada compliant drinking fountain. demo unused interconnection, stair btwn 29th and 30th floors in the tenant space and infill the stair slab opening w/a new structural slab per structural dwgs,suspended ceiling in the bathrooms. mep & life safety sep. | $110,000 |
| Jun 17, 2011 | Completed final sign-off Nov 2011 | 475 The Embarcadero | 1st floor bldg 2 - remodel existing bathrooms to comply with ada new finishes. (barrier removal)Details
1st floor bldg 2 - remodel existing bathrooms to comply with ada new finishes. (barrier removal) | $60,000 |
| Jun 17, 2011 | Completed final sign-off Nov 2011 | 560 Davis St | remodel (e) bathrooms to comply with ada-new finishes.Details
remodel (e) bathrooms to comply with ada-new finishes. | $60,000 |
| Jun 17, 2011 | Completed final sign-off Nov 2011 | 10 Jackson St | remodel (e) bathrooms to comply with ada-new finishes.Details
remodel (e) bathrooms to comply with ada-new finishes. | $60,000 |
| Jun 17, 2011 | Never finaled issued Jun 2011, no final | 660 Davis St | 1st floor remodel existing bathrooms to comply with ada new finishes. (barrier removal)Details
1st floor remodel existing bathrooms to comply with ada new finishes. (barrier removal) | $60,000 |
| Jan 27, 2011 | Completed final sign-off May 2011 | 75 Broadway | revision to 201101067968 adding one sink per bathroom still maintaining ada compliance.Details
revision to 201101067968 adding one sink per bathroom still maintaining ada compliance. | $5,000 |
| Oct 8, 2010 | Completed final sign-off Mar 2011 | 560 Davis St | remodel existing bathrooms to comply with ada new finishesDetails
remodel existing bathrooms to comply with ada new finishes | $60,000 |
| Jun 12, 2009 | Expired or cancelled expired Jul 2012 | 455 Anderson St | rebuild existing enclosed porch with largerfootprint to meet codeat 1/2 bath. rebuild deck & exterior stair.Details
rebuild existing enclosed porch with largerfootprint to meet codeat 1/2 bath. rebuild deck & exterior stair. | $22,500 |
| Jun 5, 2009 | Expired or cancelled expired Jul 2012 | 455 Anderson St | interior work. non-structural demo. non-structural walls. remodel kitchen & bath. new bathroom on upper level. (n) code compliant stair. (n) skylites. no increase in area. no change in occupancy or use. mechanical under separate permit.Details
interior work. non-structural demo. non-structural walls. remodel kitchen & bath. new bathroom on upper level. (n) code compliant stair. (n) skylites. no increase in area. no change in occupancy or use. mechanical under separate permit. | $50,000 |
| Apr 16, 2001 | Completed final sign-off May 2001 | 150 Spear St | demo break room & add new offices in its place, demo private bathroom into new break room-mech/lightDetails
demo break room & add new offices in its place, demo private bathroom into new break room-mech/light | $75,000 |