Peacock Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Nov 2015
- Last 24 months
- 0 permits filed
890 permits since 2000: 763 completed, 60 never finaled, 67 expired or cancelled.
Of the 60 never-finaled permits, 60 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 2 completed, 1 never finaled, 2 expired or cancelled. Typically 10 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 5, 2011 | Never finaled issued Apr 2011, no final | 580 Pacific Av | demo of e non structural partitions, lighting, finishes, non structural partitions, lighting, finishes. access upgrades at entry and toilet room. no change in footprint, use, occupancy, structural upgrade to parapet, bracing, wood deck over stone deck.Details
demo of e non structural partitions, lighting, finishes, non structural partitions, lighting, finishes. access upgrades at entry and toilet room. no change in footprint, use, occupancy, structural upgrade to parapet, bracing, wood deck over stone deck. | $220,000 |
| May 4, 2010 | Completed final sign-off Aug 2010 | 55 Francisco St | 4th. flr. t.i. incl demo of non-struct part & build back of (n) non-struct part. all (n) or mep and l/s work will be design-build & subm for sep permit. bldg. fully sprink. field verify that outdoor deck area is for bldg use only and has signage that 'keep door locked-no tenant access'.Details
4th. flr. t.i. incl demo of non-struct part & build back of (n) non-struct part. all (n) or mep and l/s work will be design-build & subm for sep permit. bldg. fully sprink. field verify that outdoor deck area is for bldg use only and has signage that 'keep door locked-no tenant access'. | $30,000 |
| Jun 12, 2009 | Expired or cancelled expired Jul 2012 | 455 Anderson St | rebuild existing enclosed porch with largerfootprint to meet codeat 1/2 bath. rebuild deck & exterior stair.Details
rebuild existing enclosed porch with largerfootprint to meet codeat 1/2 bath. rebuild deck & exterior stair. | $22,500 |
| May 13, 2009 | Completed final sign-off Aug 2009 | 455 Anderson St | demo only of existing enclosed porch and deck at rear. no other work.Details
demo only of existing enclosed porch and deck at rear. no other work. | $1,000 |
| Oct 12, 2005 | Expired or cancelled expired Feb 2009 | 345 California St | revision to permit app#200509122593. (infill additional hole in deck between 30th & 29th floors) where we're removing an internal stair.Details
revision to permit app#200509122593. (infill additional hole in deck between 30th & 29th floors) where we're removing an internal stair. | $5,000 |