Back to bathroom remodel contractors
Marchetti Group
- Based in
- Burlingame
- On San Francisco permits
- Dec 2013 to Oct 2026
- Last 24 months
- 38 permits filed
214 permits since 2000: 164 completed, 14 in progress, 23 never finaled, 13 expired or cancelled.
Of the 23 never-finaled permits, 1 is 3 to 5 years old, 13 are 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 64 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2023 | Completed final sign-off Sep 2023 | 335 Powell St | 31st fl - revision to pa 2022-1221-8859 conversion of (e) ada tub bathroom to ada roll-in shower bathroom. 8 guestrooms converted to 4 master guestrooms by merging 4 rooms to their adjoining room. batroom in guestroom 3194 reconfigured.Details
31st fl - revision to pa 2022-1221-8859 conversion of (e) ada tub bathroom to ada roll-in shower bathroom. 8 guestrooms converted to 4 master guestrooms by merging 4 rooms to their adjoining room. batroom in guestroom 3194 reconfigured. | $190,000 |
| May 10, 2018 | Completed final sign-off Feb 2019 | 345 Stockton St | interior ti of (3) hospitality suites & (1) presidential suite on floors 32-34, creating (6) new hotel rooms. work includes (n) partitions, (n) bathrooms, (n) lighting, (n) finishes & furnishing. mech & plumbing under sep. pa #.Details
interior ti of (3) hospitality suites & (1) presidential suite on floors 32-34, creating (6) new hotel rooms. work includes (n) partitions, (n) bathrooms, (n) lighting, (n) finishes & furnishing. mech & plumbing under sep. pa #. | $500,000 |
| Mar 9, 2018 | Completed final sign-off Apr 2019 | 625 02nd St | 1st fl: remodel existing bathroom for ada compliance. maher naDetails
1st fl: remodel existing bathroom for ada compliance. maher na | $50,000 |
| Mar 9, 2018 | Completed final sign-off Apr 2019 | 625 02nd St | 2nd fl: remodel existing bathroom for ada compliance. maher naDetails
2nd fl: remodel existing bathroom for ada compliance. maher na | $50,000 |
| Feb 15, 2018 | Completed final sign-off Aug 2018 | 71 Stevenson St | 14th floor: revision to app#201802060520. to revise clearance from bathroom sink to urinal in proposed men's restroom.Details
14th floor: revision to app#201802060520. to revise clearance from bathroom sink to urinal in proposed men's restroom. | |
| May 5, 2016 | Completed final sign-off Dec 2016 | 5 The Embarcadero | basement: remodel and upgrade of 2 locker rooms. new toilet, showers, urinals. bathroom finishes, sinks, nmew lighting and electrical outlets. new metal lockers. maher na fire/life safety under sep permitDetails
basement: remodel and upgrade of 2 locker rooms. new toilet, showers, urinals. bathroom finishes, sinks, nmew lighting and electrical outlets. new metal lockers. maher na fire/life safety under sep permit | $100,000 |
| Dec 23, 2015 | Completed final sign-off Dec 2016 | 690 Market St | interior remodel of (e) private condo unit include: full remodel of (e) bath, add partition to create new office, replace (e) stair railing, remodel closet, new flooring at lower floor throughout, mech. electrical, plumbing to be design build under seperate permit. n/a ordinance #155-13Details
interior remodel of (e) private condo unit include: full remodel of (e) bath, add partition to create new office, replace (e) stair railing, remodel closet, new flooring at lower floor throughout, mech. electrical, plumbing to be design build under seperate permit. n/a ordinance #155-13 | $35,000 |
| Aug 31, 2015 | Completed final sign-off Dec 2015 | 690 Market St | unit #2005: revision to ref pa 2014 0725 2176 -reduction of work -delete 1 bathroom renovation, 2 closets. removing work at master closet. maher naDetails
unit #2005: revision to ref pa 2014 0725 2176 -reduction of work -delete 1 bathroom renovation, 2 closets. removing work at master closet. maher na |