Marchetti Group
- Based in
- Burlingame
- On San Francisco permits
- Dec 2013 to Oct 2026
- Last 24 months
- 38 permits filed
214 permits since 2000: 164 completed, 14 in progress, 23 never finaled, 13 expired or cancelled.
Of the 23 never-finaled permits, 1 is 3 to 5 years old, 13 are 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 9 completed. Typically 35 days from filing to permit and 315 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2025 | Completed final sign-off Mar 2026 | 799 Market St | 6/7-floor- internal non egress stair walls patching, interior wall at internal stair patching, 35sf, smoke draft patching at internal stairs 35sfDetails
6/7-floor- internal non egress stair walls patching, interior wall at internal stair patching, 35sf, smoke draft patching at internal stairs 35sf | $35,000 |
| Jul 25, 2025 | Completed final sign-off Mar 2026 | 799 Market St | 6th & 7th/f: lighting replacement 2 elevator lobby, open office at ste 600 & 700, break room at ste# 700. mech duct replacemenr at open office suites 600 & 700 (suite 600 & 700 are single suite w/ e) internal stair)Details
6th & 7th/f: lighting replacement 2 elevator lobby, open office at ste 600 & 700, break room at ste# 700. mech duct replacemenr at open office suites 600 & 700 (suite 600 & 700 are single suite w/ e) internal stair) | $65,000 |
| Jul 14, 2025 | Completed final sign-off Mar 2026 | 799 Market St | 6/f -interior soft demolition: existing non load bearig wall to be removed. remove (e) door (e) stair and guard to remanin, remove (e) t-bar ceiling and lighting at hatched area 6065 sfDetails
6/f -interior soft demolition: existing non load bearig wall to be removed. remove (e) door (e) stair and guard to remanin, remove (e) t-bar ceiling and lighting at hatched area 6065 sf | $28,000 |
| Dec 15, 2023 | Completed final sign-off Jul 2025 | 251 Rhode Island St | lobby improvement: demolition of non-structural partitions, new non structural partitions, millwork, door assemblies, light fixtures, ceiling assemblies and finishes. new interior stairsDetails
lobby improvement: demolition of non-structural partitions, new non structural partitions, millwork, door assemblies, light fixtures, ceiling assemblies and finishes. new interior stairs | $1,038,424 |
| Aug 26, 2022 | Completed final sign-off Jan 2023 | 625 02nd St | new exit door at (e) storefront and enlarge an (e) exit door at an exit stairway at 1/f. maher n/a.Details
new exit door at (e) storefront and enlarge an (e) exit door at an exit stairway at 1/f. maher n/a. | $35,000 |
| Oct 28, 2019 | Completed final sign-off Mar 2021 | 101 Spear St | reference app#201908280119. structural work only. install new stair at egress corridor.Details
reference app#201908280119. structural work only. install new stair at egress corridor. | $18,000 |
| Aug 28, 2019 | Completed final sign-off Sep 2021 | 101 Spear St | revision to app#201809129816. remove portion of extg interior fl slab at extg service entry. remove portion of extg rated transfer corridor & extg egress stair. remove extg walls,doors, ceilings, & lighting at new proposed public entry lobby. install new slabs, rated partitions & openings, stairs,Details
revision to app#201809129816. remove portion of extg interior fl slab at extg service entry. remove portion of extg rated transfer corridor & extg egress stair. remove extg walls,doors, ceilings, & lighting at new proposed public entry lobby. install new slabs, rated partitions & openings, stairs, | $645,620 |
| Sep 12, 2018 | Completed final sign-off Sep 2021 | 101 Spear St | remove portions of (e) interior & exterior slab at (e) service entry, portions of (e) rated transfer corridor & egress stair & associated walls, door, ceiling & lighting. install new floor slab & exterior landing & door, rated partitions, openings & stairs. accessible lift, ceiling & lightingDetails
remove portions of (e) interior & exterior slab at (e) service entry, portions of (e) rated transfer corridor & egress stair & associated walls, door, ceiling & lighting. install new floor slab & exterior landing & door, rated partitions, openings & stairs. accessible lift, ceiling & lighting | $645,620 |
| Dec 23, 2015 | Completed final sign-off Dec 2016 | 690 Market St | interior remodel of (e) private condo unit include: full remodel of (e) bath, add partition to create new office, replace (e) stair railing, remodel closet, new flooring at lower floor throughout, mech. electrical, plumbing to be design build under seperate permit. n/a ordinance #155-13Details
interior remodel of (e) private condo unit include: full remodel of (e) bath, add partition to create new office, replace (e) stair railing, remodel closet, new flooring at lower floor throughout, mech. electrical, plumbing to be design build under seperate permit. n/a ordinance #155-13 | $35,000 |