Back to bathroom remodel contractors
L H Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Aug 2026
- Last 24 months
- 19 permits filed
194 permits since 2000: 155 completed, 12 in progress, 12 never finaled, 15 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
63 bathroom remodel permits: 53 completed, 2 in progress, 5 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 187 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2026 | In progress issued Jun 2026 | 2174 California St | unit l- interior remodel to include kitchen , bathroom and relocate (e) bedroom to living room area.Details
unit l- interior remodel to include kitchen , bathroom and relocate (e) bedroom to living room area. | $100,288 |
| Jul 8, 2025 | Completed final sign-off Nov 2025 | 3103 Clay St | interior ground flr only, non-structural residential improvment. add bedroom on ground level, (n) window for bedroom and library. (n) bedroom and bathroom doors. total area for (n) conditional space: 129 sqft. no new plumbing fixtures. no work in pulbic right of way.Details
interior ground flr only, non-structural residential improvment. add bedroom on ground level, (n) window for bedroom and library. (n) bedroom and bathroom doors. total area for (n) conditional space: 129 sqft. no new plumbing fixtures. no work in pulbic right of way. | $75,000 |
| Jun 23, 2025 | Completed final sign-off Apr 2026 | 479 19th Av | main floor: renovate kitchen and powder room. top floor: renovate existing bathroom and add a new primary bath. removal of several walls. none structural.Details
main floor: renovate kitchen and powder room. top floor: renovate existing bathroom and add a new primary bath. removal of several walls. none structural. | $150,000 |
| Sep 6, 2024 | In progress issued Sep 2024 | 3130 Clay St | remove all finishes in the bathroom and kitchen, install all new finishesin the kitchen and bathroom ( no wall will be moved) replace windows with wood/ clad double hung windows in kind facing front. remove and replace knob and tube wiring. all drywall 5/8 type xDetails
remove all finishes in the bathroom and kitchen, install all new finishesin the kitchen and bathroom ( no wall will be moved) replace windows with wood/ clad double hung windows in kind facing front. remove and replace knob and tube wiring. all drywall 5/8 type x | $75,000 |
| Apr 18, 2024 | Completed final sign-off Mar 2025 | 2921 California St | bathroom remodel, new window at east facade, nw patio door at south facade, kitchen remodel, no work visible from the street.Details
bathroom remodel, new window at east facade, nw patio door at south facade, kitchen remodel, no work visible from the street. | $95,000 |
| Feb 15, 2024 | Completed final sign-off May 2024 | 2826 Sacramento St | remodel primary bathroom all new finishes. no alteration of wall, window or door.Details
remodel primary bathroom all new finishes. no alteration of wall, window or door. | $35,000 |
| Aug 21, 2023 | Completed final sign-off Jul 2025 | 2544 Baker St | revision to pa# 2022-0617-6567: additon of half bath at fourth fl.den. repair sunroom roof and windows, not visible from streetDetails
revision to pa# 2022-0617-6567: additon of half bath at fourth fl.den. repair sunroom roof and windows, not visible from street | $1,800 |
| Aug 3, 2023 | Completed final sign-off Jan 2024 | 2506 Polk St | unit #5: remodel kitchen and bathroom in unit# 5. new fixtures and finishes.Details
unit #5: remodel kitchen and bathroom in unit# 5. new fixtures and finishes. | $45,000 |
| Jun 17, 2022 | Completed final sign-off Jul 2025 | 2544 Baker St | create shared lobby and reconfigure entries for both units. demolish partition at ground floor garage. renovate upper unit (2544) add bedroom and 2 bathrooms.Details
create shared lobby and reconfigure entries for both units. demolish partition at ground floor garage. renovate upper unit (2544) add bedroom and 2 bathrooms. | $378,500 |
| Jan 13, 2022 | Never finaled issued Jan 2022, no final | 2544 Baker St | remodel 2 kitchens, 4 bath. 2.5 baths in kind. new finishes throughout both units.Details
remodel 2 kitchens, 4 bath. 2.5 baths in kind. new finishes throughout both units. | $80,000 |
| Oct 14, 2021 | Completed final sign-off Oct 2023 | 2108 Broadway | (front bldg) select new exterior windows and doors. new guardrail, fence. and gates. add power rm @ 1st fl & sauna rm @ 4th fl. reconfigure unit #2 entry and doors to bed/bath #2Details
(front bldg) select new exterior windows and doors. new guardrail, fence. and gates. add power rm @ 1st fl & sauna rm @ 4th fl. reconfigure unit #2 entry and doors to bed/bath #2 | $90,000 |
| Aug 19, 2021 | Completed final sign-off Oct 2023 | 2108 Broadway | interior renovation: at unit #1 to renovate master bedroom-closet, kitchen and 3 bathrooms. at unit #2: renovate 2 bathrooms and kitchen. general bldg upgrades to include fixtures, finishes and lighting.Details
interior renovation: at unit #1 to renovate master bedroom-closet, kitchen and 3 bathrooms. at unit #2: renovate 2 bathrooms and kitchen. general bldg upgrades to include fixtures, finishes and lighting. | $242,695,000 |
| Jun 4, 2021 | Expired or cancelled expired May 2026 | 3080 Jackson St | demolition and conversion of existing ground floor garage into a proposed adu studio, including proposed kitchen & and proposed bathroom. also includes a proposed entry door from existing lobby. adu per government code section 65852.2.Details
demolition and conversion of existing ground floor garage into a proposed adu studio, including proposed kitchen & and proposed bathroom. also includes a proposed entry door from existing lobby. adu per government code section 65852.2. | $75,000 |
| May 21, 2021 | Completed final sign-off Nov 2021 | 42 States St | remodel 3 bathroom finishes, new tile & fixtures. no change to the location.Details
remodel 3 bathroom finishes, new tile & fixtures. no change to the location. | $45,000 |
| Nov 24, 2020 | Never finaled filed Nov 2020, never issued | 2108 Broadway | at unit 1: remove secondary tsair 7 add new stairway to connect 3rd/4th floor. add secondary elevator for access to unit from parking level. at unit 2: reconfigure main entry to side yard, replace main stair, add bed & bathroom at 1st fl. maher n/aDetails
at unit 1: remove secondary tsair 7 add new stairway to connect 3rd/4th floor. add secondary elevator for access to unit from parking level. at unit 2: reconfigure main entry to side yard, replace main stair, add bed & bathroom at 1st fl. maher n/a | $300,000 |
| Nov 9, 2020 | Completed final sign-off Jun 2022 | 2009 Buchanan St | interior renovation of mastersuite, 2 shared bathros, relocate stairs.minor modfication of exterior including infill of window at new closet. relocate window at 3/f bathroom. new skylights.Details
interior renovation of mastersuite, 2 shared bathros, relocate stairs.minor modfication of exterior including infill of window at new closet. relocate window at 3/f bathroom. new skylights. | $150,000 |
| Oct 5, 2020 | Completed final sign-off Dec 2020 | 1157 Broadway | install new windows (4 in total in kind). 2-60.6x76 living & bedroom 1-bath 18x35.5 1-kitchen 18x35.5. no street facing.Details
install new windows (4 in total in kind). 2-60.6x76 living & bedroom 1-bath 18x35.5 1-kitchen 18x35.5. no street facing. | $5,000 |
| Jul 8, 2020 | Completed final sign-off Dec 2020 | 1157 Broadway | unit #8: kitchen and bathroom remodel. kitchen size 8'x8'. complete demo of the kitchen, rewire, all new cabinets, all new plumbing fixtures and appliances. bathroom size 7'x8'. replace bathtub, vanity and toilet. all work in kind. no floor plan change.Details
unit #8: kitchen and bathroom remodel. kitchen size 8'x8'. complete demo of the kitchen, rewire, all new cabinets, all new plumbing fixtures and appliances. bathroom size 7'x8'. replace bathtub, vanity and toilet. all work in kind. no floor plan change. | $30,000 |
| Feb 11, 2020 | Never finaled issued Feb 2020, no final | 2350 California St | unit 2 - remodel kitchen and bath in kind. no structural work. replace rutted framing where needed in the bath.Details
unit 2 - remodel kitchen and bath in kind. no structural work. replace rutted framing where needed in the bath. | $30,000 |
| Dec 3, 2019 | Completed final sign-off Sep 2020 | 1157 Broadway | unit #1: remodel kitchen & bathroom. new cabinets & fixtures.Details
unit #1: remodel kitchen & bathroom. new cabinets & fixtures. | $21,000 |
| Nov 14, 2019 | Completed final sign-off May 2020 | 1272 Union St | remodel kitchen, bath new fixtures and cabinets.Details
remodel kitchen, bath new fixtures and cabinets. | $30,000 |
| Sep 17, 2019 | Completed final sign-off Aug 2020 | 2350 California St | unit #'s 3 and 5. redmodel units. new kitchen and bath finishes, cabinets and appliances. dry-rot repair in bathrooms,Details
unit #'s 3 and 5. redmodel units. new kitchen and bath finishes, cabinets and appliances. dry-rot repair in bathrooms, | $35,000 |
| Aug 8, 2019 | Completed final sign-off Jan 2020 | 1157 Broadway | unit 7: new fixtures and finishes for a kitchen and bathroom: bathroom 35 sq ft kitchen 56 sq ftDetails
unit 7: new fixtures and finishes for a kitchen and bathroom: bathroom 35 sq ft kitchen 56 sq ft | $35,000 |
| May 15, 2019 | Never finaled issued Jul 2019, no final | 225 11th Av | revision to pa 2016-1130-3816 to include (n) unit entry door location to be at vestibule, revised layout of unit 1 bathroom & closet arrangementDetails
revision to pa 2016-1130-3816 to include (n) unit entry door location to be at vestibule, revised layout of unit 1 bathroom & closet arrangement | $7,000 |
| Jan 18, 2019 | Expired or cancelled expired Aug 2026 | 2703 Jackson St | remodel (e) basement floor,laundry rm,reconfigure 2nd fl, new bath, build out attice for occupancy to expand unit 4, raise roof, dormer, remodel front facade, new elevator from garage to top fl, rear decks, roof deck and dormer.Details
remodel (e) basement floor,laundry rm,reconfigure 2nd fl, new bath, build out attice for occupancy to expand unit 4, raise roof, dormer, remodel front facade, new elevator from garage to top fl, rear decks, roof deck and dormer. | $200,000 |
| Jan 7, 2019 | Completed final sign-off Apr 2019 | 1268 Union St | remodel kitchen and bathroom, new cabinets and tiles.Details
remodel kitchen and bathroom, new cabinets and tiles. | $35,000 |
| Oct 18, 2018 | Completed final sign-off Feb 2019 | 501 Douglass St | unit #4: new kitchen cabinets and new bathroom finishes, tiles, cabinet and paint. no structural workDetails
unit #4: new kitchen cabinets and new bathroom finishes, tiles, cabinet and paint. no structural work | $22,000 |
| May 29, 2018 | Completed final sign-off Aug 2018 | 1407 Montgomery St | #3: bathroom remodel in kind. new fixtures, new tile.Details
#3: bathroom remodel in kind. new fixtures, new tile. | $17,000 |
| May 3, 2018 | Completed final sign-off Aug 2018 | 2506 Polk St | remodel (e) unit 101, bathroom and kitchen. new finishes. new finishes, no wall removed or changes.Details
remodel (e) unit 101, bathroom and kitchen. new finishes. new finishes, no wall removed or changes. | $35,000 |
| Aug 3, 2017 | Completed final sign-off Feb 2018 | 1777 Chestnut St | unit 4 - remodel kitchen & bath, close up door opening between back two rooms. remove front closet.Details
unit 4 - remodel kitchen & bath, close up door opening between back two rooms. remove front closet. | $35,000 |
| Jun 13, 2017 | Completed final sign-off Jan 2018 | 1777 Chestnut St | 3rd floor renovation of unit 3 including addition of new powder room, and expanded living/dining room areas, kitchen and bath. new skylights installed at kitchen and bathDetails
3rd floor renovation of unit 3 including addition of new powder room, and expanded living/dining room areas, kitchen and bath. new skylights installed at kitchen and bath | $120,000 |
| Sep 30, 2016 | Completed final sign-off Apr 2017 | 3080 Jackson St | unit #4 - interior renovation - additoin of (n) master closet & (n) master bath. renovate (e) kitchen & (e) bath, layout to remain.Details
unit #4 - interior renovation - additoin of (n) master closet & (n) master bath. renovate (e) kitchen & (e) bath, layout to remain. | $42,417 |
| Aug 4, 2016 | Completed final sign-off Jan 2017 | 2506 Polk St | unit 6 - remodel kitchen & bathDetails
unit 6 - remodel kitchen & bath | $35,000 |
| Jul 8, 2016 | Completed final sign-off Mar 2017 | 3080 Jackson St | unit #6: interior renovation. addition of new master closet and new master bathroom, renovation of (e) kitfchen and (e) bathroom. layout to remain maher naDetails
unit #6: interior renovation. addition of new master closet and new master bathroom, renovation of (e) kitfchen and (e) bathroom. layout to remain maher na | $39,889 |
| Nov 6, 2015 | Completed final sign-off Mar 2016 | 3080 Jackson St | interior renovation of unit #3. addition of new master closet, master bath. renovate (e) bath, layout to remain. addition of raised counter in kitchen. open kitchen to living room. widen openings and raise heads at dining roomDetails
interior renovation of unit #3. addition of new master closet, master bath. renovate (e) bath, layout to remain. addition of raised counter in kitchen. open kitchen to living room. widen openings and raise heads at dining room | $67,917 |
| Jul 27, 2015 | Completed final sign-off Oct 2015 | 1264 Union St | unit#1264. re-wire unit trench walls. new kitchen & bathrooms. same location.Details
unit#1264. re-wire unit trench walls. new kitchen & bathrooms. same location. | $35,000 |
| Mar 18, 2015 | Completed final sign-off Aug 2015 | 1262 Union St | unit 1262: remodel 1 full bath, 1 half bath, & 1 kitchenDetails
unit 1262: remodel 1 full bath, 1 half bath, & 1 kitchen | $20,000 |
| Jan 15, 2015 | Completed final sign-off Aug 2015 | 2506 Polk St | unit 2: remodel kitchen & bath: new cabinets & finishes, 5 new windows on the side and back of houseDetails
unit 2: remodel kitchen & bath: new cabinets & finishes, 5 new windows on the side and back of house | $22,000 |
| Dec 22, 2014 | Completed final sign-off Aug 2015 | 3080 Jackson St | unit #7 interior renovation- addition of (n) master closet & (n) master bath, renovate (e) bath, layout to remain , addiiton of raised counter in kitchen, open kitchen to living room, widen openings & raise heads at dining room. n/a maher ordinanceDetails
unit #7 interior renovation- addition of (n) master closet & (n) master bath, renovate (e) bath, layout to remain , addiiton of raised counter in kitchen, open kitchen to living room, widen openings & raise heads at dining room. n/a maher ordinance | $20,000 |
| Feb 27, 2014 | Completed final sign-off Jun 2016 | 555 11th Av | 1st flr & deck addition to (e) 3 story single family res'd. new work includesl new playroom, new guest bedroom, new bathroom, new mud room, new interior stair to 1st flr. new exterioor spiral stair to rear yard, new flat roof with skylights & new parapet walls.Details
1st flr & deck addition to (e) 3 story single family res'd. new work includesl new playroom, new guest bedroom, new bathroom, new mud room, new interior stair to 1st flr. new exterioor spiral stair to rear yard, new flat roof with skylights & new parapet walls. | $50,000 |
| Mar 5, 2013 | Completed final sign-off Jul 2013 | 2174 California St | remodel unit a kitchen & bathroom. enlarge bathroom. remove non-load bearing wall between living room & kitchen.Details
remodel unit a kitchen & bathroom. enlarge bathroom. remove non-load bearing wall between living room & kitchen. | $35,000 |
| Nov 27, 2012 | Completed final sign-off May 2013 | 2174 California St | unit# l/k/f-remodel 3 units-kitchens & bathrooms. replace windows in kind. u factor = 0.40Details
unit# l/k/f-remodel 3 units-kitchens & bathrooms. replace windows in kind. u factor = 0.40 | $75,000 |
| Nov 20, 2012 | Completed final sign-off Jan 2013 | 2407 Octavia St | unit #4-remodel bathroom in unit #1. no structural work. electrical & plumbing work on a seperate permitDetails
unit #4-remodel bathroom in unit #1. no structural work. electrical & plumbing work on a seperate permit | $9,000 |
| Aug 15, 2012 | Completed final sign-off Nov 2013 | 1751 Broadway | remodel 2 bedrooms into a master suite and relocate second bathroom with reconfiguration of remaining bedrooms, add a 4 stop elevator serving one unit only.Details
remodel 2 bedrooms into a master suite and relocate second bathroom with reconfiguration of remaining bedrooms, add a 4 stop elevator serving one unit only. | $175,000 |
| Sep 20, 2011 | Completed final sign-off Aug 2012 | 872 Sanchez St | rvsion to app#201012287504 for following changes at the grnd floor. elimination of south portion of proposed hall/ expansn of bath 3, change in bath 3 window size, relocate door from garage to hall, and replace extg garage door in kind. replace extg redwood siding at south exterior wall.Details
rvsion to app#201012287504 for following changes at the grnd floor. elimination of south portion of proposed hall/ expansn of bath 3, change in bath 3 window size, relocate door from garage to hall, and replace extg garage door in kind. replace extg redwood siding at south exterior wall. | $5,000 |
| Aug 8, 2011 | Completed final sign-off Aug 2013 | 416 Austin St | revision to pa# 2010.04.23.1004. revise lay out of bedroom door to stair. replace siding on kitchen/bathrm w/ like materials, repair dry rot in kitch/baths framing and add framing where needed. remove dr at kitchen. lighting must comply with cec 150(k).Details
revision to pa# 2010.04.23.1004. revise lay out of bedroom door to stair. replace siding on kitchen/bathrm w/ like materials, repair dry rot in kitch/baths framing and add framing where needed. remove dr at kitchen. lighting must comply with cec 150(k). | $10,000 |
| Jun 14, 2011 | Expired or cancelled expired Apr 2013 | 414 Austin St | remodel bathroom & kitchen in 414 and in 416. remove drywall and re-frame where dryrot is.Details
remodel bathroom & kitchen in 414 and in 416. remove drywall and re-frame where dryrot is. | $65,000 |
| Mar 31, 2011 | Completed final sign-off Aug 2011 | 1040 Clay St | unit #1042-kitchen & bathroom remodelDetails
unit #1042-kitchen & bathroom remodel | $35,000 |
| May 3, 2010 | Completed final sign-off Jun 2011 | 552 Waller St | partial foundation replacement and structural work @ garage level. kitchen remodel, new bath & window replacements @ bathrm. unit only (552 waller).Details
partial foundation replacement and structural work @ garage level. kitchen remodel, new bath & window replacements @ bathrm. unit only (552 waller). | $90,000 |
| Oct 27, 2009 | Completed final sign-off May 2010 | 220 Downey St | legalize (e) media room and full bathroom, and laundr at basement floor. new fire rated door between garage and basement rooms.Details
legalize (e) media room and full bathroom, and laundr at basement floor. new fire rated door between garage and basement rooms. | $22,000 |
| Oct 14, 2009 | Completed final sign-off Feb 2011 | 1843 Pine St | existing basment area to be dug out further to create a media room with a laundry, wet bar & bathroom. exterior alley way to have new steps down to (e) door that will be replaced. electrical, plumbing work involved. existing hvac furnace to be revised with relocated ducts.Details
existing basment area to be dug out further to create a media room with a laundry, wet bar & bathroom. exterior alley way to have new steps down to (e) door that will be replaced. electrical, plumbing work involved. existing hvac furnace to be revised with relocated ducts. | $200,000 |
| Aug 10, 2009 | Completed final sign-off Apr 2010 | 812 Arguello Bl | unit #812-b: remodel kitchen- new cabinets & finishes, update electrical. unit 816 - remodel bathroom: new fixtures & finishes. no structural changes.Details
unit #812-b: remodel kitchen- new cabinets & finishes, update electrical. unit 816 - remodel bathroom: new fixtures & finishes. no structural changes. | $30,000 |
| Jul 30, 2009 | Completed final sign-off Jul 2010 | 150 Downey St | install stairs from 2nd to 1st floor. (all work in unit 2). replace 1st floor slab to provide 8'-0" headroom. install new bathroom at 1st floor. convert (e) 1st fl. storage to bedrooms. field verify if life safety is required under separate permit.Details
install stairs from 2nd to 1st floor. (all work in unit 2). replace 1st floor slab to provide 8'-0" headroom. install new bathroom at 1st floor. convert (e) 1st fl. storage to bedrooms. field verify if life safety is required under separate permit. | $60,000 |
| Jun 30, 2009 | Completed final sign-off Feb 2012 | 339 Collingwood St | roof raised 4' at back half of living level & the rear extended 6" & a new deck added. lower 30" at back half of lower undeveloped level & expand w/ a new bedroom, bathroom & office. add new windows & skylights & property line windows.Details
roof raised 4' at back half of living level & the rear extended 6" & a new deck added. lower 30" at back half of lower undeveloped level & expand w/ a new bedroom, bathroom & office. add new windows & skylights & property line windows. | $300,000 |
| Apr 13, 2009 | Completed final sign-off Sep 2009 | 133 Beaver St | remove wall to convert bedroom to dining area, convert closet to bathroom, convert dining to home office, convert living room to bedroom, install structural improvements, all work on 2nd floor.Details
remove wall to convert bedroom to dining area, convert closet to bathroom, convert dining to home office, convert living room to bedroom, install structural improvements, all work on 2nd floor. | $40,000 |
| Jan 23, 2008 | Completed final sign-off Apr 2008 | 2139 Green St | 4th floor, unit #g - repair water damaged sheetrock in bathroom and bedroom, lower walls in bedroom, total ceiling in bedroom, partial ceiling in bathroom. 5/8" type "x", double 5/8" ceiling, replace in kind. approx. 300 sq. ft.Details
4th floor, unit #g - repair water damaged sheetrock in bathroom and bedroom, lower walls in bedroom, total ceiling in bedroom, partial ceiling in bathroom. 5/8" type "x", double 5/8" ceiling, replace in kind. approx. 300 sq. ft. | $6,500 |
| Sep 21, 2007 | Completed final sign-off Aug 2008 | 131 Beaver St | remodel existing first floor kitchen,bath,laundry. replace rear laundry window, replace window w/ new slider,add 1/2 bath@exist laundry room,structural remodel to conform to cbc sec.3403.6 at 1st floor level. no mech. or electrical work.Details
remodel existing first floor kitchen,bath,laundry. replace rear laundry window, replace window w/ new slider,add 1/2 bath@exist laundry room,structural remodel to conform to cbc sec.3403.6 at 1st floor level. no mech. or electrical work. | $50,000 |
| May 17, 2007 | Never finaled issued May 2007, no final | 151 Beaver St | kitchen update, add closets, bath update, new window sash. related electrical & plumbing.Details
kitchen update, add closets, bath update, new window sash. related electrical & plumbing. | $80,000 |
| Jan 5, 2007 | Completed final sign-off Apr 2007 | 1434 Jefferson St | 2 bathrooms remodel. new cabinets, tile, shower / tub, toilet, sink, fixtures. (2 baths in one unit) non structural work.Details
2 bathrooms remodel. new cabinets, tile, shower / tub, toilet, sink, fixtures. (2 baths in one unit) non structural work. | $20,000 |
| Dec 21, 2004 | Completed final sign-off Feb 2006 | 1074 Sanchez St | kitchen and 2 bath remodel. no structuralDetails
kitchen and 2 bath remodel. no structural | $30,000 |
| Dec 3, 2004 | Completed final sign-off Dec 2005 | 3917 26th St | 200 ft addition to back of house to include a bathroom and replacement of (e) deck after thatDetails
200 ft addition to back of house to include a bathroom and replacement of (e) deck after that | $40,000 |
| Oct 18, 2004 | Completed final sign-off Mar 2005 | 3750 Webster St | add bedroom & bathroom in area that was garage in basement level. all revision are indicated by 1.Details
add bedroom & bathroom in area that was garage in basement level. all revision are indicated by 1. | $15,000 |
| Oct 30, 2000 | Completed final sign-off Oct 2001 | 377 Noe St | bathroom remodeling, sheetrock, new fixtures and floor 2nd floor unitDetails
bathroom remodeling, sheetrock, new fixtures and floor 2nd floor unit | $11,000 |