Block 1269, lot 151
150 Downey St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 5
- Rooms
- 6 bedrooms, 5 bathrooms
- Building
- 2,946 sq ft
- Lot
- 1,999 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2023 | Never finaled issued Aug 2023, no final | 150 Downey St | revision to (e) pa#201912048689, mandatory soft story retrofit per 2016 sfebc chapter a3. revise foundation detail. replace shear wall with simpson panel. replace (e) footing due to deterioration, add foundation cap.Details
revision to (e) pa#201912048689, mandatory soft story retrofit per 2016 sfebc chapter a3. revise foundation detail. replace shear wall with simpson panel. replace (e) footing due to deterioration, add foundation cap. | $5,000 | |
| Dec 4, 2019 | Never finaled issued Feb 2020, no final | 150 Downey St | mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. to comply with nov 201990835Details
mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. to comply with nov 201990835 | $80,000 | |
| Jun 19, 2019 | Never finaled issued Jun 2019, no final | 150 Downey St | street spaceDetails
street space | ||
| Dec 4, 2018 | Never finaled issued Dec 2018, no final | 150 Downey St | street spaceDetails
street space | ||
| Jul 6, 2018 | Never finaled issued Jul 2018, no final | 150 Downey St | apt #5: bathroom remodel, kitchen remodel in kind. no structural work. to comply with cec150.0(k)3 & cec150.0(k)5.Details
apt #5: bathroom remodel, kitchen remodel in kind. no structural work. to comply with cec150.0(k)3 & cec150.0(k)5. | $12,000 | |
| Sep 8, 2017 | Expired or cancelled withdrawn Dec 2019 | 150 Downey St | seismic upgrade to comply with ord 66-13 soft story retrofit per sfebc ch 34 b, 2016 app a4Details
seismic upgrade to comply with ord 66-13 soft story retrofit per sfebc ch 34 b, 2016 app a4 | $18,000 | |
| Aug 21, 2009 | Never finaled issued Aug 2009, no final | 150 Downey St | street spaceDetails
street space | ||
| Jul 30, 2009 | Completed final sign-off Jul 2010 | 150 Downey St | L H Construction | install stairs from 2nd to 1st floor. (all work in unit 2). replace 1st floor slab to provide 8'-0" headroom. install new bathroom at 1st floor. convert (e) 1st fl. storage to bedrooms. field verify if life safety is required under separate permit.Details
install stairs from 2nd to 1st floor. (all work in unit 2). replace 1st floor slab to provide 8'-0" headroom. install new bathroom at 1st floor. convert (e) 1st fl. storage to bedrooms. field verify if life safety is required under separate permit. | $60,000 |
| Jan 10, 2008 | Completed final sign-off Apr 2008 | 150 Downey St | work @ unit# 3 only. remodel 1 kitchen & 1 bath in unit# 3.Details
work @ unit# 3 only. remodel 1 kitchen & 1 bath in unit# 3. | $15,000 | |
| Jun 13, 2007 | Completed final sign-off Dec 2007 | 150 Downey St | unit 1 & 2. remodel kitchens (2) + baths (2). kitchen : at least 50% lightin gwattage must be fluorescent. bathroom: fluorescent, or controlled by occupancy sensor. exhaust termination 3' min. from p.l and bldg openings.Details
unit 1 & 2. remodel kitchens (2) + baths (2). kitchen : at least 50% lightin gwattage must be fluorescent. bathroom: fluorescent, or controlled by occupancy sensor. exhaust termination 3' min. from p.l and bldg openings. | $25,000 | |
| Mar 18, 2005 | Completed final sign-off Aug 2005 | 150 Downey St | to repair extg rotten rear deck and stairs per complaint #200337817 also correct misc. violationDetails
to repair extg rotten rear deck and stairs per complaint #200337817 also correct misc. violation | $12,000 | |
| Feb 14, 2005 | Never finaled issued Feb 2005, no final | 150 Downey St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- L H Construction
- Architects
- Delta Design
- Engineers
- Engin Yagmur, Kung Kay Chiu, Thomas Meece
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.