L H Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Aug 2026
- Last 24 months
- 19 permits filed
194 permits since 2000: 155 completed, 12 in progress, 12 never finaled, 15 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 3 completed, 1 expired or cancelled. Typically 58 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2024 | Completed final sign-off Jul 2024 | 4443 19th St | repair water damage exterior south wall and stair remove stucco at the rear stair, roof deck and landing. repair dryrot and replace in kind stucco and tile.Details
repair water damage exterior south wall and stair remove stucco at the rear stair, roof deck and landing. repair dryrot and replace in kind stucco and tile. | $15,000 |
| Jan 18, 2019 | Expired or cancelled expired Aug 2026 | 2703 Jackson St | remodel (e) basement floor,laundry rm,reconfigure 2nd fl, new bath, build out attice for occupancy to expand unit 4, raise roof, dormer, remodel front facade, new elevator from garage to top fl, rear decks, roof deck and dormer.Details
remodel (e) basement floor,laundry rm,reconfigure 2nd fl, new bath, build out attice for occupancy to expand unit 4, raise roof, dormer, remodel front facade, new elevator from garage to top fl, rear decks, roof deck and dormer. | $200,000 |
| Aug 25, 2017 | Completed final sign-off Dec 2019 | 1777 Chestnut St | new unit #3 on 3rd floor access to new roof deck, including custom retractable skylihgt over new stairs.Details
new unit #3 on 3rd floor access to new roof deck, including custom retractable skylihgt over new stairs. | $150,000 |
| Feb 1, 2005 | Completed final sign-off Feb 2005 | 1090 Montgomery St | roof deck repair (replace (e) roof deck finish approximately 300 sf of roof deck - to comply with 20Details
roof deck repair (replace (e) roof deck finish approximately 300 sf of roof deck - to comply with 20 | $750 |