Back to kitchen remodel contractors
L H Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Aug 2026
- Last 24 months
- 19 permits filed
194 permits since 2000: 155 completed, 12 in progress, 12 never finaled, 15 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
57 kitchen remodel permits: 47 completed, 3 in progress, 3 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2026 | In progress issued Jun 2026 | 2174 California St | unit l- interior remodel to include kitchen , bathroom and relocate (e) bedroom to living room area.Details
unit l- interior remodel to include kitchen , bathroom and relocate (e) bedroom to living room area. | $100,288 |
| Jun 23, 2025 | Completed final sign-off Apr 2026 | 479 19th Av | main floor: renovate kitchen and powder room. top floor: renovate existing bathroom and add a new primary bath. removal of several walls. none structural.Details
main floor: renovate kitchen and powder room. top floor: renovate existing bathroom and add a new primary bath. removal of several walls. none structural. | $150,000 |
| Sep 6, 2024 | In progress issued Sep 2024 | 3130 Clay St | remove all finishes in the bathroom and kitchen, install all new finishesin the kitchen and bathroom ( no wall will be moved) replace windows with wood/ clad double hung windows in kind facing front. remove and replace knob and tube wiring. all drywall 5/8 type xDetails
remove all finishes in the bathroom and kitchen, install all new finishesin the kitchen and bathroom ( no wall will be moved) replace windows with wood/ clad double hung windows in kind facing front. remove and replace knob and tube wiring. all drywall 5/8 type x | $75,000 |
| Apr 19, 2024 | In progress issued Apr 2024 | 3792 16th St | remove and replace drywall on the ceiling due to roof leak. open up ceiling in 2 bedroom, hallway, dining room, kitchen and livingroom to change out recessed lighting. replace hardwood flooring throughout.Details
remove and replace drywall on the ceiling due to roof leak. open up ceiling in 2 bedroom, hallway, dining room, kitchen and livingroom to change out recessed lighting. replace hardwood flooring throughout. | $56,000 |
| Apr 18, 2024 | Completed final sign-off Mar 2025 | 2921 California St | bathroom remodel, new window at east facade, nw patio door at south facade, kitchen remodel, no work visible from the street.Details
bathroom remodel, new window at east facade, nw patio door at south facade, kitchen remodel, no work visible from the street. | $95,000 |
| Aug 3, 2023 | Completed final sign-off Jan 2024 | 2506 Polk St | unit #5: remodel kitchen and bathroom in unit# 5. new fixtures and finishes.Details
unit #5: remodel kitchen and bathroom in unit# 5. new fixtures and finishes. | $45,000 |
| Jan 10, 2023 | Completed final sign-off May 2023 | 225 11th Av | 2/flr unit 101: interior renovation to include demo and relocation of existing kitchen and existing bedroom and removal of non-load bearing interior walls.Details
2/flr unit 101: interior renovation to include demo and relocation of existing kitchen and existing bedroom and removal of non-load bearing interior walls. | $35,600 |
| Aug 8, 2022 | Completed final sign-off Apr 2023 | 737 Ashbury St | interior renovation of 1 (e) apartment unit 2nd/f, #1. relocate kitchen to (e) bedroom location to create a new office. relocate (e) bedroom to (e) living room location. one new window in lightwell (not visible from street or adjacent neighbor)Details
interior renovation of 1 (e) apartment unit 2nd/f, #1. relocate kitchen to (e) bedroom location to create a new office. relocate (e) bedroom to (e) living room location. one new window in lightwell (not visible from street or adjacent neighbor) | $30,000 |
| May 6, 2022 | Expired or cancelled expired Apr 2025 | 2155 Jackson St | replace 40 linear feet of foundation of 1 story unit at rear of property. replace existing crawl space framing with reinforced concrete slar. replace kitchen cabinets in kind.Details
replace 40 linear feet of foundation of 1 story unit at rear of property. replace existing crawl space framing with reinforced concrete slar. replace kitchen cabinets in kind. | $12,000 |
| Jan 13, 2022 | Never finaled issued Jan 2022, no final | 2544 Baker St | remodel 2 kitchens, 4 bath. 2.5 baths in kind. new finishes throughout both units.Details
remodel 2 kitchens, 4 bath. 2.5 baths in kind. new finishes throughout both units. | $80,000 |
| Aug 19, 2021 | Completed final sign-off Oct 2023 | 2108 Broadway | interior renovation: at unit #1 to renovate master bedroom-closet, kitchen and 3 bathrooms. at unit #2: renovate 2 bathrooms and kitchen. general bldg upgrades to include fixtures, finishes and lighting.Details
interior renovation: at unit #1 to renovate master bedroom-closet, kitchen and 3 bathrooms. at unit #2: renovate 2 bathrooms and kitchen. general bldg upgrades to include fixtures, finishes and lighting. | $242,695,000 |
| Jul 1, 2021 | Completed final sign-off May 2022 | 225 11th Av | apt 202: interior renovation of third floor unit 202. renovation to include demolition and relocation of extg kitchen and extg bedroom and removal of non-load bearing walls.Details
apt 202: interior renovation of third floor unit 202. renovation to include demolition and relocation of extg kitchen and extg bedroom and removal of non-load bearing walls. | $85,601 |
| Jul 1, 2021 | Completed final sign-off May 2022 | 225 11th Av | apt 102: interior renovation of 2nd floor unit #102. renovation to include demolition and relocation of extg kitchen and extg bedroom and removal of non-load bearing wall interior.Details
apt 102: interior renovation of 2nd floor unit #102. renovation to include demolition and relocation of extg kitchen and extg bedroom and removal of non-load bearing wall interior. | $85,601 |
| Jun 4, 2021 | Expired or cancelled expired May 2026 | 3080 Jackson St | demolition and conversion of existing ground floor garage into a proposed adu studio, including proposed kitchen & and proposed bathroom. also includes a proposed entry door from existing lobby. adu per government code section 65852.2.Details
demolition and conversion of existing ground floor garage into a proposed adu studio, including proposed kitchen & and proposed bathroom. also includes a proposed entry door from existing lobby. adu per government code section 65852.2. | $75,000 |
| Mar 31, 2021 | Completed final sign-off Jun 2022 | 2009 Buchanan St | interior renovation including a reconfiguration of kitchen, kitchen nook, minor modifications to the entry parlor and powder room. minor modification to the bldg exterior which includes replacing 4 (e) windows with new windows and 2 (e) doors with new doors at rear of the structure.Details
interior renovation including a reconfiguration of kitchen, kitchen nook, minor modifications to the entry parlor and powder room. minor modification to the bldg exterior which includes replacing 4 (e) windows with new windows and 2 (e) doors with new doors at rear of the structure. | $62,390 |
| Oct 5, 2020 | Completed final sign-off Dec 2020 | 1157 Broadway | install new windows (4 in total in kind). 2-60.6x76 living & bedroom 1-bath 18x35.5 1-kitchen 18x35.5. no street facing.Details
install new windows (4 in total in kind). 2-60.6x76 living & bedroom 1-bath 18x35.5 1-kitchen 18x35.5. no street facing. | $5,000 |
| Jul 8, 2020 | Completed final sign-off Dec 2020 | 1157 Broadway | unit #8: kitchen and bathroom remodel. kitchen size 8'x8'. complete demo of the kitchen, rewire, all new cabinets, all new plumbing fixtures and appliances. bathroom size 7'x8'. replace bathtub, vanity and toilet. all work in kind. no floor plan change.Details
unit #8: kitchen and bathroom remodel. kitchen size 8'x8'. complete demo of the kitchen, rewire, all new cabinets, all new plumbing fixtures and appliances. bathroom size 7'x8'. replace bathtub, vanity and toilet. all work in kind. no floor plan change. | $30,000 |
| Feb 11, 2020 | Never finaled issued Feb 2020, no final | 2350 California St | unit 2 - remodel kitchen and bath in kind. no structural work. replace rutted framing where needed in the bath.Details
unit 2 - remodel kitchen and bath in kind. no structural work. replace rutted framing where needed in the bath. | $30,000 |
| Dec 3, 2019 | Completed final sign-off Sep 2020 | 1157 Broadway | unit #1: remodel kitchen & bathroom. new cabinets & fixtures.Details
unit #1: remodel kitchen & bathroom. new cabinets & fixtures. | $21,000 |
| Nov 14, 2019 | Completed final sign-off May 2020 | 1272 Union St | remodel kitchen, bath new fixtures and cabinets.Details
remodel kitchen, bath new fixtures and cabinets. | $30,000 |
| Sep 17, 2019 | Completed final sign-off Aug 2020 | 2350 California St | unit #'s 3 and 5. redmodel units. new kitchen and bath finishes, cabinets and appliances. dry-rot repair in bathrooms,Details
unit #'s 3 and 5. redmodel units. new kitchen and bath finishes, cabinets and appliances. dry-rot repair in bathrooms, | $35,000 |
| Aug 12, 2019 | Completed final sign-off Jan 2020 | 225 11th Av | interior elevation of 4th fl unit 301. renovation to include demolition and relocation of e kitchen and e bedroom, removal non load bearing interior interior wallsDetails
interior elevation of 4th fl unit 301. renovation to include demolition and relocation of e kitchen and e bedroom, removal non load bearing interior interior walls | $35,000 |
| Aug 8, 2019 | Completed final sign-off Jan 2020 | 1157 Broadway | unit 7: new fixtures and finishes for a kitchen and bathroom: bathroom 35 sq ft kitchen 56 sq ftDetails
unit 7: new fixtures and finishes for a kitchen and bathroom: bathroom 35 sq ft kitchen 56 sq ft | $35,000 |
| Aug 6, 2019 | Completed final sign-off Mar 2020 | 2350 California St | remodel front street facing apartment unit - relocate kitchen to living room, add closet, replace existing kitchen w/ new 2nd bedroom. mep workDetails
remodel front street facing apartment unit - relocate kitchen to living room, add closet, replace existing kitchen w/ new 2nd bedroom. mep work | $15,000 |
| Jan 7, 2019 | Completed final sign-off Apr 2019 | 1268 Union St | remodel kitchen and bathroom, new cabinets and tiles.Details
remodel kitchen and bathroom, new cabinets and tiles. | $35,000 |
| Oct 18, 2018 | Completed final sign-off Feb 2019 | 501 Douglass St | unit #4: new kitchen cabinets and new bathroom finishes, tiles, cabinet and paint. no structural workDetails
unit #4: new kitchen cabinets and new bathroom finishes, tiles, cabinet and paint. no structural work | $22,000 |
| May 3, 2018 | Completed final sign-off Aug 2018 | 2506 Polk St | remodel (e) unit 101, bathroom and kitchen. new finishes. new finishes, no wall removed or changes.Details
remodel (e) unit 101, bathroom and kitchen. new finishes. new finishes, no wall removed or changes. | $35,000 |
| Aug 3, 2017 | Completed final sign-off Feb 2018 | 1777 Chestnut St | unit 4 - remodel kitchen & bath, close up door opening between back two rooms. remove front closet.Details
unit 4 - remodel kitchen & bath, close up door opening between back two rooms. remove front closet. | $35,000 |
| Jun 13, 2017 | Completed final sign-off Jan 2018 | 1777 Chestnut St | 3rd floor renovation of unit 3 including addition of new powder room, and expanded living/dining room areas, kitchen and bath. new skylights installed at kitchen and bathDetails
3rd floor renovation of unit 3 including addition of new powder room, and expanded living/dining room areas, kitchen and bath. new skylights installed at kitchen and bath | $120,000 |
| Feb 28, 2017 | Completed final sign-off Jun 2017 | 1291 11th Av | conversion of unit 4 on 3rd fl from 1 bdrm to 2 bdrm unit. modification of kitchen and living rm. no structural. no change to building envelope or windows. no enlargement of unit. 1 non load bearing partition. minor plumb/elecDetails
conversion of unit 4 on 3rd fl from 1 bdrm to 2 bdrm unit. modification of kitchen and living rm. no structural. no change to building envelope or windows. no enlargement of unit. 1 non load bearing partition. minor plumb/elec | $20,000 |
| Nov 17, 2016 | Completed final sign-off Jun 2017 | 225 11th Av | interior renovationof 3rd fl unit 201. reovation to include demo and relocation of e kitchen and e bedroom, removal of non load bearing interior wallsDetails
interior renovationof 3rd fl unit 201. reovation to include demo and relocation of e kitchen and e bedroom, removal of non load bearing interior walls | $92,000 |
| Sep 30, 2016 | Completed final sign-off Apr 2017 | 3080 Jackson St | unit #4 - interior renovation - additoin of (n) master closet & (n) master bath. renovate (e) kitchen & (e) bath, layout to remain.Details
unit #4 - interior renovation - additoin of (n) master closet & (n) master bath. renovate (e) kitchen & (e) bath, layout to remain. | $42,417 |
| Sep 21, 2016 | Completed final sign-off Jan 2019 | 2950 Vallejo St | horizontal addition. 2 story addition at side yard. expansion of existing kitchen, expansion of existing bedroomDetails
horizontal addition. 2 story addition at side yard. expansion of existing kitchen, expansion of existing bedroom | $15,652 |
| Aug 4, 2016 | Completed final sign-off Jan 2017 | 2506 Polk St | unit 6 - remodel kitchen & bathDetails
unit 6 - remodel kitchen & bath | $35,000 |
| May 20, 2016 | Completed final sign-off Oct 2016 | 1828 Pine St | kitchen remodel. remove bearing wall between kitchen & family room.Details
kitchen remodel. remove bearing wall between kitchen & family room. | $7,000 |
| Nov 6, 2015 | Completed final sign-off Mar 2016 | 3080 Jackson St | interior renovation of unit #3. addition of new master closet, master bath. renovate (e) bath, layout to remain. addition of raised counter in kitchen. open kitchen to living room. widen openings and raise heads at dining roomDetails
interior renovation of unit #3. addition of new master closet, master bath. renovate (e) bath, layout to remain. addition of raised counter in kitchen. open kitchen to living room. widen openings and raise heads at dining room | $67,917 |
| Jul 27, 2015 | Completed final sign-off Oct 2015 | 1264 Union St | unit#1264. re-wire unit trench walls. new kitchen & bathrooms. same location.Details
unit#1264. re-wire unit trench walls. new kitchen & bathrooms. same location. | $35,000 |
| Mar 18, 2015 | Completed final sign-off Aug 2015 | 1262 Union St | unit 1262: remodel 1 full bath, 1 half bath, & 1 kitchenDetails
unit 1262: remodel 1 full bath, 1 half bath, & 1 kitchen | $20,000 |
| Jan 15, 2015 | Completed final sign-off Aug 2015 | 2506 Polk St | unit 2: remodel kitchen & bath: new cabinets & finishes, 5 new windows on the side and back of houseDetails
unit 2: remodel kitchen & bath: new cabinets & finishes, 5 new windows on the side and back of house | $22,000 |
| Dec 22, 2014 | Completed final sign-off Aug 2015 | 3080 Jackson St | unit #7 interior renovation- addition of (n) master closet & (n) master bath, renovate (e) bath, layout to remain , addiiton of raised counter in kitchen, open kitchen to living room, widen openings & raise heads at dining room. n/a maher ordinanceDetails
unit #7 interior renovation- addition of (n) master closet & (n) master bath, renovate (e) bath, layout to remain , addiiton of raised counter in kitchen, open kitchen to living room, widen openings & raise heads at dining room. n/a maher ordinance | $20,000 |
| Jul 28, 2014 | Completed final sign-off Oct 2014 | 243 07th Av | remodel kitchen & laundry, replace 3 windows & exterior door. not street visible.Details
remodel kitchen & laundry, replace 3 windows & exterior door. not street visible. | $15,000 |
| Jun 4, 2013 | Completed final sign-off Dec 2013 | 2407 Octavia St | remodel kitchen in unit # 2 new cabinets and fixtures, insulate kitchen ceiling.Details
remodel kitchen in unit # 2 new cabinets and fixtures, insulate kitchen ceiling. | $10,000 |
| Mar 5, 2013 | Completed final sign-off Jul 2013 | 2174 California St | remodel unit a kitchen & bathroom. enlarge bathroom. remove non-load bearing wall between living room & kitchen.Details
remodel unit a kitchen & bathroom. enlarge bathroom. remove non-load bearing wall between living room & kitchen. | $35,000 |
| Nov 27, 2012 | Completed final sign-off May 2013 | 2174 California St | unit# l/k/f-remodel 3 units-kitchens & bathrooms. replace windows in kind. u factor = 0.40Details
unit# l/k/f-remodel 3 units-kitchens & bathrooms. replace windows in kind. u factor = 0.40 | $75,000 |
| Apr 26, 2012 | Completed final sign-off Aug 2012 | 812 Arguello Bl | interior remodel. remove partition wall between e kitchen/living room. kitchen remodel in kind. infill door opening between living room/bedroom. work at unit 812a comply with co/sd per cbc 2010Details
interior remodel. remove partition wall between e kitchen/living room. kitchen remodel in kind. infill door opening between living room/bedroom. work at unit 812a comply with co/sd per cbc 2010 | $2,500 |
| Aug 8, 2011 | Completed final sign-off Aug 2013 | 416 Austin St | revision to pa# 2010.04.23.1004. revise lay out of bedroom door to stair. replace siding on kitchen/bathrm w/ like materials, repair dry rot in kitch/baths framing and add framing where needed. remove dr at kitchen. lighting must comply with cec 150(k).Details
revision to pa# 2010.04.23.1004. revise lay out of bedroom door to stair. replace siding on kitchen/bathrm w/ like materials, repair dry rot in kitch/baths framing and add framing where needed. remove dr at kitchen. lighting must comply with cec 150(k). | $10,000 |
| Jun 14, 2011 | Expired or cancelled expired Apr 2013 | 414 Austin St | remodel bathroom & kitchen in 414 and in 416. remove drywall and re-frame where dryrot is.Details
remodel bathroom & kitchen in 414 and in 416. remove drywall and re-frame where dryrot is. | $65,000 |
| Mar 31, 2011 | Completed final sign-off Aug 2011 | 1040 Clay St | unit #1042-kitchen & bathroom remodelDetails
unit #1042-kitchen & bathroom remodel | $35,000 |
| May 3, 2010 | Completed final sign-off Jun 2011 | 552 Waller St | partial foundation replacement and structural work @ garage level. kitchen remodel, new bath & window replacements @ bathrm. unit only (552 waller).Details
partial foundation replacement and structural work @ garage level. kitchen remodel, new bath & window replacements @ bathrm. unit only (552 waller). | $90,000 |
| Aug 10, 2009 | Completed final sign-off Apr 2010 | 812 Arguello Bl | unit #812-b: remodel kitchen- new cabinets & finishes, update electrical. unit 816 - remodel bathroom: new fixtures & finishes. no structural changes.Details
unit #812-b: remodel kitchen- new cabinets & finishes, update electrical. unit 816 - remodel bathroom: new fixtures & finishes. no structural changes. | $30,000 |
| Mar 12, 2009 | Completed final sign-off Sep 2009 | 131 Beaver St | remodel (e) kitchen; replace (e) laundry with kitchen extension; replace (e) misc. finishes; enlarge (e) front closet; strengthen rear building wall. all work on the second floor on 131 beaver.Details
remodel (e) kitchen; replace (e) laundry with kitchen extension; replace (e) misc. finishes; enlarge (e) front closet; strengthen rear building wall. all work on the second floor on 131 beaver. | $20,000 |
| Sep 21, 2007 | Completed final sign-off Aug 2008 | 131 Beaver St | remodel existing first floor kitchen,bath,laundry. replace rear laundry window, replace window w/ new slider,add 1/2 bath@exist laundry room,structural remodel to conform to cbc sec.3403.6 at 1st floor level. no mech. or electrical work.Details
remodel existing first floor kitchen,bath,laundry. replace rear laundry window, replace window w/ new slider,add 1/2 bath@exist laundry room,structural remodel to conform to cbc sec.3403.6 at 1st floor level. no mech. or electrical work. | $50,000 |
| May 17, 2007 | Never finaled issued May 2007, no final | 151 Beaver St | kitchen update, add closets, bath update, new window sash. related electrical & plumbing.Details
kitchen update, add closets, bath update, new window sash. related electrical & plumbing. | $80,000 |
| Jan 25, 2006 | Completed final sign-off Jun 2006 | 150 Yerba Buena Av | dryrot repair in kitchen ceiling. replace (e) joist in find 14' approx.Details
dryrot repair in kitchen ceiling. replace (e) joist in find 14' approx. | $5,000 |
| Dec 21, 2004 | Completed final sign-off Feb 2006 | 1074 Sanchez St | kitchen and 2 bath remodel. no structuralDetails
kitchen and 2 bath remodel. no structural | $30,000 |
| Dec 1, 2003 | Completed final sign-off May 2004 | 1977 Green St | kitchen remodel new sheetrock insulation lower cabinets and trim on the main houseDetails
kitchen remodel new sheetrock insulation lower cabinets and trim on the main house | $42,000 |
| Sep 4, 2001 | Expired or cancelled expired Mar 2004 | 1334 Mcallister St | enlarge kitchen opening reframe south wall of kitchen revise app #200107032905 work on 3/f dryrotDetails
enlarge kitchen opening reframe south wall of kitchen revise app #200107032905 work on 3/f dryrot | $12,000 |