L H Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Aug 2026
- Last 24 months
- 19 permits filed
194 permits since 2000: 155 completed, 12 in progress, 12 never finaled, 15 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
6 deck permits: 4 completed, 2 expired or cancelled. Typically 234 days from filing to permit and 421 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2019 | Expired or cancelled expired Aug 2026 | 2703 Jackson St | remodel (e) basement floor,laundry rm,reconfigure 2nd fl, new bath, build out attice for occupancy to expand unit 4, raise roof, dormer, remodel front facade, new elevator from garage to top fl, rear decks, roof deck and dormer.Details
remodel (e) basement floor,laundry rm,reconfigure 2nd fl, new bath, build out attice for occupancy to expand unit 4, raise roof, dormer, remodel front facade, new elevator from garage to top fl, rear decks, roof deck and dormer. | $200,000 |
| Feb 27, 2014 | Completed final sign-off Jun 2016 | 555 11th Av | 1st flr & deck addition to (e) 3 story single family res'd. new work includesl new playroom, new guest bedroom, new bathroom, new mud room, new interior stair to 1st flr. new exterioor spiral stair to rear yard, new flat roof with skylights & new parapet walls.Details
1st flr & deck addition to (e) 3 story single family res'd. new work includesl new playroom, new guest bedroom, new bathroom, new mud room, new interior stair to 1st flr. new exterioor spiral stair to rear yard, new flat roof with skylights & new parapet walls. | $50,000 |
| Jun 30, 2009 | Completed final sign-off Feb 2012 | 339 Collingwood St | roof raised 4' at back half of living level & the rear extended 6" & a new deck added. lower 30" at back half of lower undeveloped level & expand w/ a new bedroom, bathroom & office. add new windows & skylights & property line windows.Details
roof raised 4' at back half of living level & the rear extended 6" & a new deck added. lower 30" at back half of lower undeveloped level & expand w/ a new bedroom, bathroom & office. add new windows & skylights & property line windows. | $300,000 |
| Feb 11, 2008 | Completed final sign-off Jul 2008 | 151 Beaver St | new rear deck on 2nd floor. new deck approved under vaviance#20070472 by planning.Details
new rear deck on 2nd floor. new deck approved under vaviance#20070472 by planning. | $6,000 |
| Dec 3, 2004 | Completed final sign-off Dec 2005 | 3917 26th St | 200 ft addition to back of house to include a bathroom and replacement of (e) deck after thatDetails
200 ft addition to back of house to include a bathroom and replacement of (e) deck after that | $40,000 |
| Oct 7, 2004 | Expired or cancelled expired Dec 2010 | 2537 Greenwich St | reconstruction and repair of garage, entry stair and deck. horizontal addition to living rm, newly remodeled interior stair.Details
reconstruction and repair of garage, entry stair and deck. horizontal addition to living rm, newly remodeled interior stair. | $150,000 |