Back to kitchen remodel contractors
Kwong Associates
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Oct 2026
- Last 24 months
- 24 permits filed
165 permits since 2000: 128 completed, 13 in progress, 12 never finaled, 12 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 6 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
46 kitchen remodel permits: 35 completed, 5 in progress, 3 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2026 | In progress issued Jan 2026 | 2021 14th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). | $68,000 |
| Oct 21, 2025 | In progress issued Oct 2025 | 1117 Kirkham St | work on 1117 kirkham only: remodel kitchen and 2nd floor bathroom. alter 3rd floor full bathroom and add laundry. remove lath and plaster, install insulation and new drywall. new electrical wiring throughout. new plumbing in kitchen and bathroom. lightwell infill on seperate permit.Details
work on 1117 kirkham only: remodel kitchen and 2nd floor bathroom. alter 3rd floor full bathroom and add laundry. remove lath and plaster, install insulation and new drywall. new electrical wiring throughout. new plumbing in kitchen and bathroom. lightwell infill on seperate permit. | $110,000 |
| Jun 15, 2025 | Completed final sign-off Sep 2025 | 68 Riverton Dr | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $28,000 |
| Mar 5, 2025 | In progress issued Mar 2025 | 3175 Cesar Chavez St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). installing gas line. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). installing gas line. need a "green tag" for electrical service equipment. | $95,000 |
| Mar 4, 2025 | In progress issued Mar 2025 | 759 09th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $23,000 |
| Feb 3, 2025 | In progress issued Feb 2025 | 2258 33rd Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment. installing gas line. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment. installing gas line. need a "green tag" for electrical service equipment. | $22,000 |
| Dec 31, 2024 | Completed final sign-off Feb 2026 | 2533 Moraga St | 2/f: remodel (e) kitchen and remodel (e) bath and closet to fill bath and toilet room. new hall way to (e) bedroom at rear; raise up (e) lightwell low roof at west.Details
2/f: remodel (e) kitchen and remodel (e) bath and closet to fill bath and toilet room. new hall way to (e) bedroom at rear; raise up (e) lightwell low roof at west. | $9,700 |
| Dec 19, 2024 | Completed final sign-off Jun 2025 | 1491 28th Av | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $38,000 |
| Mar 8, 2024 | Completed final sign-off Oct 2024 | 329 Clement St | remodel 2nd floor residential apartment. add 1/2 bath. new wiring. replace 12 windows (u=.30max) , non street facing. replace water heater and furnace. add new bedroom and closet. add washer and dryer. remodel bath and kitchenDetails
remodel 2nd floor residential apartment. add 1/2 bath. new wiring. replace 12 windows (u=.30max) , non street facing. replace water heater and furnace. add new bedroom and closet. add washer and dryer. remodel bath and kitchen | $60,000 |
| Sep 6, 2023 | Completed final sign-off Nov 2024 | 44 San Antonio Pl | remodel kitchen and bathroom. rewire unit, new subpanel, remove and replace seiling drywall. add insulation, plumbing fixture replacement, no change of in wall plumbing.Details
remodel kitchen and bathroom. rewire unit, new subpanel, remove and replace seiling drywall. add insulation, plumbing fixture replacement, no change of in wall plumbing. | $30,000 |
| Dec 8, 2021 | Completed final sign-off Oct 2022 | 2146 28th Av | remodel kitchen and bathroom on 2nd floor. add one new bathroom on 2nd floor. add entertainment room and one new bathroom on 1st floor. upgrade electrical thoughout bldg. no structural workDetails
remodel kitchen and bathroom on 2nd floor. add one new bathroom on 2nd floor. add entertainment room and one new bathroom on 1st floor. upgrade electrical thoughout bldg. no structural work | $75,000 |
| Jul 7, 2021 | Never finaled issued Apr 2022, no final | 1644 Post St | 1st fl: interior remodel, kitchen and bath remodel. add recessed lights. 2nd and 3rd fl: int remodel, kitchen bath convert panty to bath, bedrm to lr, lr to bdrm. add recessed lightsDetails
1st fl: interior remodel, kitchen and bath remodel. add recessed lights. 2nd and 3rd fl: int remodel, kitchen bath convert panty to bath, bedrm to lr, lr to bdrm. add recessed lights | $200,000 |
| Mar 4, 2021 | Completed final sign-off Apr 2021 | 829 Masonic Av | apt 7: remodel kitchen. replace bathroom vanity & toilet inplace. no plumbing change.Details
apt 7: remodel kitchen. replace bathroom vanity & toilet inplace. no plumbing change. | $25,000 |
| Jan 6, 2021 | Completed final sign-off Mar 2021 | 845 Masonic Av | to comply with nov# 202071706 & 202071707 & 202071708. remodeled kitchen & bathroom. add subpanel.Details
to comply with nov# 202071706 & 202071707 & 202071708. remodeled kitchen & bathroom. add subpanel. | $35,000 |
| Jan 6, 2021 | Completed final sign-off Mar 2021 | 847 Masonic Av | to comply with nov# 202071709 & 202071710 & 202071711. remodeled kitchen & bathroom. add subpanel.Details
to comply with nov# 202071709 & 202071710 & 202071711. remodeled kitchen & bathroom. add subpanel. | $35,000 |
| Oct 26, 2020 | Completed final sign-off Apr 2021 | 201 Harrison St | remodel kitchen and barh in-kind, water damageDetails
remodel kitchen and barh in-kind, water damage | $25,000 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 575 Pierce St | unit #102: remodel kitchen & bathroom. electrical upgrade (in kind) no work in basementDetails
unit #102: remodel kitchen & bathroom. electrical upgrade (in kind) no work in basement | $60,000 |
| Jul 13, 2020 | Expired or cancelled cancelled Nov 2020 | 575 Pierce St | unit #202: remodel kitchen & bathroom, electrical upgarde (in kind)Details
unit #202: remodel kitchen & bathroom, electrical upgarde (in kind) | $60,000 |
| Feb 12, 2019 | Completed final sign-off Apr 2019 | 2965 Sacramento St | unit #202: renovate kitchen and bathroom. add new sub panel. kitchen approx 10'x12, bathroom 5'x8'.Details
unit #202: renovate kitchen and bathroom. add new sub panel. kitchen approx 10'x12, bathroom 5'x8'. | $30,000 |
| Jul 17, 2018 | Completed final sign-off Oct 2018 | 188 South Park | remodel (e) kitchen in-kind. n/a for maher.Details
remodel (e) kitchen in-kind. n/a for maher. | $25,000 |
| Feb 13, 2018 | Completed final sign-off Apr 2018 | 2965 Sacramento St | unit #301: kitchen and bathroom remodel. add new sub-panel, new flooring & paint. replace (3) vinyl windows, non-streetDetails
unit #301: kitchen and bathroom remodel. add new sub-panel, new flooring & paint. replace (3) vinyl windows, non-street | $38,000 |
| Jan 12, 2018 | Completed final sign-off Jul 2019 | 70 Sotelo Av | reconfigure main floor layout with new bedrooms and bath, kitchen and stairs to lower floor. reconfigure lower floor layout with new bedrooms and bath. roof/wall repair at (e) kitchen. no change to front of houseDetails
reconfigure main floor layout with new bedrooms and bath, kitchen and stairs to lower floor. reconfigure lower floor layout with new bedrooms and bath. roof/wall repair at (e) kitchen. no change to front of house | $100,000 |
| Jun 21, 2017 | Completed final sign-off Jan 2018 | 2134 14th Av | remodel kitchen, 1/f bathroom & master bathroom. add subpanel in kitchen. fix woodrot. remove & replace non-structural view window.Details
remodel kitchen, 1/f bathroom & master bathroom. add subpanel in kitchen. fix woodrot. remove & replace non-structural view window. | $40,000 |
| May 25, 2017 | Completed final sign-off Nov 2017 | 1200 Gough St | unit 5e: install washer and dryer combo unit, replace bath fixture, kitchen remodel.Details
unit 5e: install washer and dryer combo unit, replace bath fixture, kitchen remodel. | $12,000 |
| Feb 15, 2017 | Completed final sign-off Aug 2017 | 1839 47th Av | remodel kitchen & bathroom: install insulation. replace sheet rock. new 125a service & main panel. new copper plmbing & dmw system. new water heater. new gas furnace. r/r 3 windows in-kind in rear of building.replace 2 (e) skylights. new floor tile & engineeered flooring.Details
remodel kitchen & bathroom: install insulation. replace sheet rock. new 125a service & main panel. new copper plmbing & dmw system. new water heater. new gas furnace. r/r 3 windows in-kind in rear of building.replace 2 (e) skylights. new floor tile & engineeered flooring. | $100,000 |
| Jan 12, 2017 | Completed final sign-off Mar 2017 | 54 Brentwood Av | remodel kitchen. remove 2 non bearing walls. add plywood panel, holddowns to existing walls. remodel 2 existing baths. repair exterior stucco dry rot near kitchen window in sf, replace 2 windows at kitchen not visible from street. gen eral mp upgrades. now work in basement streetlevelDetails
remodel kitchen. remove 2 non bearing walls. add plywood panel, holddowns to existing walls. remodel 2 existing baths. repair exterior stucco dry rot near kitchen window in sf, replace 2 windows at kitchen not visible from street. gen eral mp upgrades. now work in basement streetlevel | $44,500 |
| Dec 30, 2016 | Completed final sign-off Mar 2017 | 2965 Sacramento St | apt 105: remodel 1 kitchen, new subpanel & ckts. remodel 1 bathroom; replace flooring.Details
apt 105: remodel 1 kitchen, new subpanel & ckts. remodel 1 bathroom; replace flooring. | $20,000 |
| Jul 6, 2016 | Completed final sign-off Aug 2016 | 2965 Sacramento St | #103 - remodel kitchen & bathroom. add sub-panel in kind.Details
#103 - remodel kitchen & bathroom. add sub-panel in kind. | $30,000 |
| Jun 20, 2016 | Completed final sign-off Aug 2016 | 2965 Sacramento St | unit#101. remodel kitchen & bathroom. add subpanel in-kind.Details
unit#101. remodel kitchen & bathroom. add subpanel in-kind. | $30,000 |
| May 23, 2016 | Completed final sign-off Jul 2016 | 1512 Leavenworth St | renovate 1512 leavenworth: kitchen and split bathroom. remove and replace rear windows (no frontage windows). upgrade electrical wiring, add new sub-panelDetails
renovate 1512 leavenworth: kitchen and split bathroom. remove and replace rear windows (no frontage windows). upgrade electrical wiring, add new sub-panel | $40,000 |
| Jan 15, 2016 | Completed final sign-off Mar 2016 | 77 Dow Pl | remove and replace kitchen cabinet, counters and appliances to (e) position. remove and replace main floor 1/2 bath vanity, faucet and toilet to (e) position. remove and replace upper floor bath vanity, cabinet, tub and surround, faucets to (e) position. no alt. at wall, window and door.Details
remove and replace kitchen cabinet, counters and appliances to (e) position. remove and replace main floor 1/2 bath vanity, faucet and toilet to (e) position. remove and replace upper floor bath vanity, cabinet, tub and surround, faucets to (e) position. no alt. at wall, window and door. | $30,000 |
| Dec 10, 2015 | Completed final sign-off Mar 2016 | 147 Day St | renovate kitchen , add 8 new circuits, remove water heater, replace with tankless water heater in laundry room. re-tile bathroom.Details
renovate kitchen , add 8 new circuits, remove water heater, replace with tankless water heater in laundry room. re-tile bathroom. | $29,000 |
| Dec 4, 2015 | Completed final sign-off Apr 2016 | 2921 21st Av | remodel kitchen. add sub panel, new circuits, remove and replace cabinet, counters. reuse existing small appliance outletsDetails
remodel kitchen. add sub panel, new circuits, remove and replace cabinet, counters. reuse existing small appliance outlets | $18,000 |
| Oct 14, 2015 | Completed final sign-off Dec 2015 | 23 Los Palmos Dr | legalize ground floor bedroom & bathroom per plans. renovate kitchen on 2nd floor. remove and replace cabinets & counters. remove and reset appliances, retile floor. update kitchen electrical circuits.Details
legalize ground floor bedroom & bathroom per plans. renovate kitchen on 2nd floor. remove and replace cabinets & counters. remove and reset appliances, retile floor. update kitchen electrical circuits. | $30,000 |
| Sep 29, 2015 | Expired or cancelled cancelled Nov 2024 | 429 Laidley St | renovation per plans submitted: new vertical addition in rear of bldg, add 1230 sqft, new addition height will be 20'10". three new bedrooms, two new bathrooms. renovate kitchen & family rooms.Details
renovation per plans submitted: new vertical addition in rear of bldg, add 1230 sqft, new addition height will be 20'10". three new bedrooms, two new bathrooms. renovate kitchen & family rooms. | $110,000 |
| May 4, 2015 | Never finaled issued May 2015, no final | 429 Laidley St | demolition & exploratory main fl living rm, ceiling & wall. kitchen & bath walls to expose piping & conduits. only at locations of utility. re-install when complete to (e) condition for spot exposure & restore only. no framing change.Details
demolition & exploratory main fl living rm, ceiling & wall. kitchen & bath walls to expose piping & conduits. only at locations of utility. re-install when complete to (e) condition for spot exposure & restore only. no framing change. | $500 |
| Mar 16, 2015 | Completed final sign-off Apr 2015 | 1798 Grove St | #3- add sub-panel, upgrade electrical to 2015 code, renovate kitchen & bath, no walls to be moved, no structural work, finishes & fixtures only.Details
#3- add sub-panel, upgrade electrical to 2015 code, renovate kitchen & bath, no walls to be moved, no structural work, finishes & fixtures only. | $25,000 |
| Nov 5, 2014 | Completed final sign-off Dec 2014 | 118 Church St | apt. #103:renovate kitchen and bath. update electrical outlet. add suppanel for kitchenDetails
apt. #103:renovate kitchen and bath. update electrical outlet. add suppanel for kitchen | $18,000 |
| Oct 27, 2014 | Completed final sign-off Jan 2015 | 2965 Sacramento St | unit #302: remodel kitchen & bathroom, add sub-panel, update apartment electricDetails
unit #302: remodel kitchen & bathroom, add sub-panel, update apartment electric | $30,000 |
| Apr 2, 2014 | Completed final sign-off Jan 2015 | 1323 Columbus Av | comply w/nov #200010421 - t.i. for new coffee shop @ vacant restaurant, no gas on site, all electric kitchen. compliance with ordinance #155-13 not requiredDetails
comply w/nov #200010421 - t.i. for new coffee shop @ vacant restaurant, no gas on site, all electric kitchen. compliance with ordinance #155-13 not required | $100,000 |
| May 12, 2011 | Completed final sign-off Jul 2011 | 60 Danvers St | #62 only- kitchen remodel: install new 60 amp sub panel from main for kitchen, remove & replace existing range/oven, dishwasher, garbage disposal, sink, micorwave, fridge. new gfci outlets. new recessed lights & under cabinet lights.Details
#62 only- kitchen remodel: install new 60 amp sub panel from main for kitchen, remove & replace existing range/oven, dishwasher, garbage disposal, sink, micorwave, fridge. new gfci outlets. new recessed lights & under cabinet lights. | $10,000 |
| Apr 6, 2011 | Completed final sign-off Jun 2011 | 1346 41st Av | repair fire damage in kind-no plans. correct violation #201109762: rewire 2 units up to code. sheet rock, 2 entire, 1 bedroom unit. install two kitchens. install two new bathroom. re-do floors. replace 6 windows. replace siding, repai exterior stairs. repair/replace entire roof. one window visibleDetails
repair fire damage in kind-no plans. correct violation #201109762: rewire 2 units up to code. sheet rock, 2 entire, 1 bedroom unit. install two kitchens. install two new bathroom. re-do floors. replace 6 windows. replace siding, repai exterior stairs. repair/replace entire roof. one window visible | $120,000 |
| Feb 1, 2010 | Completed final sign-off Mar 2010 | 1282 Clayton St | remove & replace 12ft kitchen cabinets, vent range. no dishwasher, no garbage disposal, remove & replace 2x3 aluminum window with vinyl window. install laminate flooring. bathroom: remove & replace vanity & sink, toilet, install new floor tiles, for unit #1284Details
remove & replace 12ft kitchen cabinets, vent range. no dishwasher, no garbage disposal, remove & replace 2x3 aluminum window with vinyl window. install laminate flooring. bathroom: remove & replace vanity & sink, toilet, install new floor tiles, for unit #1284 | $23,000 |
| May 18, 2009 | Completed final sign-off Aug 2009 | 2921 21st Av | remodel 2 existing full bathrooms. re-tile, new vanity & sinks, new tub & faucets, 2 new low water (1.6 gal) toilets. remodel (e) kitchen: new cabinets & counters. new fridge & range. upgrade (e) vent. new sink. no garbage disposal or dishwasher.Details
remodel 2 existing full bathrooms. re-tile, new vanity & sinks, new tub & faucets, 2 new low water (1.6 gal) toilets. remodel (e) kitchen: new cabinets & counters. new fridge & range. upgrade (e) vent. new sink. no garbage disposal or dishwasher. | $12,000 |
| Jun 20, 2008 | Expired or cancelled expired Nov 2011 | 1248 Golden Gate Av | g/f-remodel (e) kitchen, remove/relocate (e)bathroom, repalce (e)window/sliding door with new. 2/f-remove/relocate (e)kitchen, remodel (e)bath, add one new bath & replace (e)window/sliding door with new. 3/f-remove/relocate (e)kitchen,remodel 2 (e)baths, add 1 bath, replace (e)window/sliding door.Details
g/f-remodel (e) kitchen, remove/relocate (e)bathroom, repalce (e)window/sliding door with new. 2/f-remove/relocate (e)kitchen, remodel (e)bath, add one new bath & replace (e)window/sliding door with new. 3/f-remove/relocate (e)kitchen,remodel 2 (e)baths, add 1 bath, replace (e)window/sliding door. | $85,000 |
| Jan 3, 2008 | Completed final sign-off May 2009 | 2790 California St | 2nd floor , unit #2790 only - remodel existing kitchen and bathroom at 2nd floor. replace existing furnace with new, add 2nd bathroom at 2nd floor, reconfigure ex living rm, dining rm, bedroom per plan. all work in unit 2790, 2nd floor.Details
2nd floor , unit #2790 only - remodel existing kitchen and bathroom at 2nd floor. replace existing furnace with new, add 2nd bathroom at 2nd floor, reconfigure ex living rm, dining rm, bedroom per plan. all work in unit 2790, 2nd floor. | $35,000 |