Block 1186, lot 011
1798 Grove St
- City’s use
- Multi-Family Residential
- Built
- 1913
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 5,838 sq ft
- Lot
- 2,000 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 30, 2025 | Completed final sign-off Mar 2025 | 1798 Grove St | Crime Watch Security Sys Llc | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1Details
upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 | $27,300 |
| Feb 16, 2023 | Completed final sign-off May 2023 | 1798 Grove St | front entry door to be replaced in kind.Details
front entry door to be replaced in kind. | $3,000 | |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 1798 Grove St | David Jone | replace kitchen cabinet & counter top, floor tile. replace bath tub to shower pan, wall & floor tile, bathroom sink & toilet. no structural work. no framing modification.Details
replace kitchen cabinet & counter top, floor tile. replace bath tub to shower pan, wall & floor tile, bathroom sink & toilet. no structural work. no framing modification. | $20,000 |
| Apr 9, 2018 | Completed final sign-off Oct 2018 | 1798 Grove St | H & S America Corp | work onunit #2, maintain emergency/rescue window in bedrooms, r&r kitchen cabinet,bathorom fixtures, windows (12) ttl, kitchen 130sf, 9 windows vicible from the st, 9 front windows to be replaced, in kind materials (wood) detail (divited) w/ogee +operation double hung, 2 side window replacement,1ligDetails
work onunit #2, maintain emergency/rescue window in bedrooms, r&r kitchen cabinet,bathorom fixtures, windows (12) ttl, kitchen 130sf, 9 windows vicible from the st, 9 front windows to be replaced, in kind materials (wood) detail (divited) w/ogee +operation double hung, 2 side window replacement,1lig | $20,000 |
| Sep 14, 2017 | Completed final sign-off Sep 2018 | 1798 Grove St | soft story per 2016 cebc app a4Details
soft story per 2016 cebc app a4 | $10,000 | |
| Mar 16, 2015 | Completed final sign-off Apr 2015 | 1798 Grove St | Kwong Associates | #3- add sub-panel, upgrade electrical to 2015 code, renovate kitchen & bath, no walls to be moved, no structural work, finishes & fixtures only.Details
#3- add sub-panel, upgrade electrical to 2015 code, renovate kitchen & bath, no walls to be moved, no structural work, finishes & fixtures only. | $25,000 |
| Jun 15, 2010 | Completed final sign-off Aug 2010 | 1798 Grove St | New Pacific Roofing Company Inc | reroofingDetails
reroofing | $2,300 |
| Jan 7, 2010 | Never finaled issued Jan 2010, no final | 1798 Grove St | Pro General Roofing Inc | reroofingDetails
reroofing | $9,500 |
| Dec 5, 2007 | Completed final sign-off Apr 2015 | 1798 Grove St | On-Site Maintenance | work @ unit# 4 only. new contractor. complete work from pa# 2007/03/30/7688. kitchen & bath remodel.Details
work @ unit# 4 only. new contractor. complete work from pa# 2007/03/30/7688. kitchen & bath remodel. | $7,000 |
| Mar 30, 2007 | Completed final sign-off Mar 2008 | 1798 Grove St | Double Woods Construction | work in unit# 4 only. remodel kitchen & bathroom. take out dry wall & redo it. put new wiring. change bathtub, sink, toilet & tiles. install new cabinet, countertop, sink, faucet, dishwasher. kitchen: at least 50% lighting wattage must be fluorescent. bathroom: fluorescent or controlled by motionDetails
work in unit# 4 only. remodel kitchen & bathroom. take out dry wall & redo it. put new wiring. change bathtub, sink, toilet & tiles. install new cabinet, countertop, sink, faucet, dishwasher. kitchen: at least 50% lighting wattage must be fluorescent. bathroom: fluorescent or controlled by motion | $24,000 |
| Mar 16, 2007 | Completed final sign-off Mar 2008 | 1798 Grove St | Double Woods Construction | work on unit#1. remodel kitchen & bathroom. take out drywall & redo it. put new wiring. change bath tub, sink & toilet. change tiles. install new cabinets, countertop. sink, faucet, dishwasher. no structural changes. (n) windows or door work on this permit).Details
work on unit#1. remodel kitchen & bathroom. take out drywall & redo it. put new wiring. change bath tub, sink & toilet. change tiles. install new cabinets, countertop. sink, faucet, dishwasher. no structural changes. (n) windows or door work on this permit). | $30,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Double Woods Construction (2), Crime Watch Security Sys Llc, David Jone, H & S America Corp, Kwong Associates, New Pacific Roofing Company Inc, On-Site Maintenance, Pro General Roofing Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.