Back to bathroom remodel contractors
Kwong Associates
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Oct 2026
- Last 24 months
- 24 permits filed
165 permits since 2000: 128 completed, 13 in progress, 12 never finaled, 12 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 6 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
70 bathroom remodel permits: 54 completed, 8 in progress, 5 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2026 | In progress issued Jan 2026 | 2021 14th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). | $68,000 |
| Oct 24, 2025 | Completed final sign-off May 2026 | 1830 31st Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $11,000 |
| Oct 21, 2025 | In progress issued Oct 2025 | 1117 Kirkham St | work on 1117 kirkham only: remodel kitchen and 2nd floor bathroom. alter 3rd floor full bathroom and add laundry. remove lath and plaster, install insulation and new drywall. new electrical wiring throughout. new plumbing in kitchen and bathroom. lightwell infill on seperate permit.Details
work on 1117 kirkham only: remodel kitchen and 2nd floor bathroom. alter 3rd floor full bathroom and add laundry. remove lath and plaster, install insulation and new drywall. new electrical wiring throughout. new plumbing in kitchen and bathroom. lightwell infill on seperate permit. | $110,000 |
| Sep 4, 2025 | Completed final sign-off Sep 2025 | 68 Riverton Dr | reduce scope of work for permit # 202506158727: in kind remodel ktichen (no bathroom work)Details
reduce scope of work for permit # 202506158727: in kind remodel ktichen (no bathroom work) | |
| Jun 15, 2025 | Completed final sign-off Sep 2025 | 68 Riverton Dr | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $28,000 |
| Apr 29, 2025 | In progress issued Apr 2025 | 2258 33rd Av | 1/f: legalize bedroom and bathroom. 2/f: add full bathroom. water damaged repair.Details
1/f: legalize bedroom and bathroom. 2/f: add full bathroom. water damaged repair. | $75,000 |
| Apr 22, 2025 | In progress issued Jul 2025 | 3175 Cesar Chavez St | remodel home, rewire entire home, new plumbing. add a full bathroom, alter walls, structural reinforcement. fire damage repair. new office, laundry & wetbar on 1st flDetails
remodel home, rewire entire home, new plumbing. add a full bathroom, alter walls, structural reinforcement. fire damage repair. new office, laundry & wetbar on 1st fl | $250,000 |
| Mar 5, 2025 | In progress issued Mar 2025 | 3175 Cesar Chavez St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). installing gas line. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). installing gas line. need a "green tag" for electrical service equipment. | $95,000 |
| Mar 4, 2025 | In progress issued Mar 2025 | 759 09th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $23,000 |
| Feb 3, 2025 | In progress issued Feb 2025 | 2258 33rd Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment. installing gas line. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment. installing gas line. need a "green tag" for electrical service equipment. | $22,000 |
| Dec 31, 2024 | Completed final sign-off Feb 2026 | 2533 Moraga St | 2/f: remodel (e) kitchen and remodel (e) bath and closet to fill bath and toilet room. new hall way to (e) bedroom at rear; raise up (e) lightwell low roof at west.Details
2/f: remodel (e) kitchen and remodel (e) bath and closet to fill bath and toilet room. new hall way to (e) bedroom at rear; raise up (e) lightwell low roof at west. | $9,700 |
| May 31, 2024 | In progress issued Jun 2024 | 690 Sacramento St | remove partition wall to enlarge bathroom door opening. replace (e) bathroom door.Details
remove partition wall to enlarge bathroom door opening. replace (e) bathroom door. | $480 |
| Mar 8, 2024 | Completed final sign-off Oct 2024 | 329 Clement St | remodel 2nd floor residential apartment. add 1/2 bath. new wiring. replace 12 windows (u=.30max) , non street facing. replace water heater and furnace. add new bedroom and closet. add washer and dryer. remodel bath and kitchenDetails
remodel 2nd floor residential apartment. add 1/2 bath. new wiring. replace 12 windows (u=.30max) , non street facing. replace water heater and furnace. add new bedroom and closet. add washer and dryer. remodel bath and kitchen | $60,000 |
| Sep 22, 2023 | Completed final sign-off Nov 2024 | 44 San Antonio Pl | add half bathroom and washer dryer.Details
add half bathroom and washer dryer. | $8,000 |
| Sep 6, 2023 | Completed final sign-off Nov 2024 | 44 San Antonio Pl | remodel kitchen and bathroom. rewire unit, new subpanel, remove and replace seiling drywall. add insulation, plumbing fixture replacement, no change of in wall plumbing.Details
remodel kitchen and bathroom. rewire unit, new subpanel, remove and replace seiling drywall. add insulation, plumbing fixture replacement, no change of in wall plumbing. | $30,000 |
| Dec 8, 2021 | Completed final sign-off Oct 2022 | 2146 28th Av | remodel kitchen and bathroom on 2nd floor. add one new bathroom on 2nd floor. add entertainment room and one new bathroom on 1st floor. upgrade electrical thoughout bldg. no structural workDetails
remodel kitchen and bathroom on 2nd floor. add one new bathroom on 2nd floor. add entertainment room and one new bathroom on 1st floor. upgrade electrical thoughout bldg. no structural work | $75,000 |
| Jul 7, 2021 | Never finaled issued Apr 2022, no final | 1644 Post St | 1st fl: interior remodel, kitchen and bath remodel. add recessed lights. 2nd and 3rd fl: int remodel, kitchen bath convert panty to bath, bedrm to lr, lr to bdrm. add recessed lightsDetails
1st fl: interior remodel, kitchen and bath remodel. add recessed lights. 2nd and 3rd fl: int remodel, kitchen bath convert panty to bath, bedrm to lr, lr to bdrm. add recessed lights | $200,000 |
| Jun 12, 2021 | Completed final sign-off Dec 2021 | 1491 28th Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $11,000 |
| Apr 27, 2021 | Completed final sign-off May 2025 | 601 Fell St | to comply with nov # 201863451. remainder of nov completed under pa# 201907155929. build out (e) basement with new media room and bathroom and master bedroom and bathroom at 2nd floor.Details
to comply with nov # 201863451. remainder of nov completed under pa# 201907155929. build out (e) basement with new media room and bathroom and master bedroom and bathroom at 2nd floor. | $150,000 |
| Mar 4, 2021 | Completed final sign-off Apr 2021 | 829 Masonic Av | apt 7: remodel kitchen. replace bathroom vanity & toilet inplace. no plumbing change.Details
apt 7: remodel kitchen. replace bathroom vanity & toilet inplace. no plumbing change. | $25,000 |
| Jan 13, 2021 | Completed final sign-off Aug 2021 | 1648 Post St | a.d.a. bathroom improvements. remove existing 3 inch step at entrance and scope to comply with ada requirementsDetails
a.d.a. bathroom improvements. remove existing 3 inch step at entrance and scope to comply with ada requirements | $25,000 |
| Jan 6, 2021 | Completed final sign-off Mar 2021 | 845 Masonic Av | to comply with nov# 202071706 & 202071707 & 202071708. remodeled kitchen & bathroom. add subpanel.Details
to comply with nov# 202071706 & 202071707 & 202071708. remodeled kitchen & bathroom. add subpanel. | $35,000 |
| Jan 6, 2021 | Completed final sign-off Mar 2021 | 847 Masonic Av | to comply with nov# 202071709 & 202071710 & 202071711. remodeled kitchen & bathroom. add subpanel.Details
to comply with nov# 202071709 & 202071710 & 202071711. remodeled kitchen & bathroom. add subpanel. | $35,000 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 575 Pierce St | unit #102: remodel kitchen & bathroom. electrical upgrade (in kind) no work in basementDetails
unit #102: remodel kitchen & bathroom. electrical upgrade (in kind) no work in basement | $60,000 |
| Jul 13, 2020 | Expired or cancelled cancelled Nov 2020 | 575 Pierce St | unit #202: remodel kitchen & bathroom, electrical upgarde (in kind)Details
unit #202: remodel kitchen & bathroom, electrical upgarde (in kind) | $60,000 |
| Sep 11, 2019 | Completed final sign-off Nov 2019 | 801 Fillmore St | apts 7/9/19: reduction of work scope. remove bathroom remodel from work description for all units.Details
apts 7/9/19: reduction of work scope. remove bathroom remodel from work description for all units. | |
| Apr 5, 2019 | Completed final sign-off May 2021 | 566 27th Av | conversion of (e) storage to family room, bedroom & bath room. add 2 doors at 1st flr to rear yard, add deck at rear yard under 30" from finished grade.Details
conversion of (e) storage to family room, bedroom & bath room. add 2 doors at 1st flr to rear yard, add deck at rear yard under 30" from finished grade. | $100,000 |
| Feb 25, 2019 | Completed final sign-off Jan 2020 | 225 26th Av | repair and remodel unit a hallway bath and master bath. repair water damaged floors and drywallDetails
repair and remodel unit a hallway bath and master bath. repair water damaged floors and drywall | $30,000 |
| Feb 12, 2019 | Completed final sign-off Apr 2019 | 2965 Sacramento St | unit #202: renovate kitchen and bathroom. add new sub panel. kitchen approx 10'x12, bathroom 5'x8'.Details
unit #202: renovate kitchen and bathroom. add new sub panel. kitchen approx 10'x12, bathroom 5'x8'. | $30,000 |
| Jan 29, 2019 | Completed final sign-off Jan 2020 | 225 26th Av | repair water damaged ground floor, home office space, and half bathroom. repair bar sink and counters.Details
repair water damaged ground floor, home office space, and half bathroom. repair bar sink and counters. | $8,000 |
| May 25, 2018 | Completed final sign-off Jul 2018 | 3144 Buchanan St | remodel trim full bathroom on 3rd floor and 4th floorDetails
remodel trim full bathroom on 3rd floor and 4th floor | $60,000 |
| Feb 13, 2018 | Completed final sign-off Apr 2018 | 2965 Sacramento St | unit #301: kitchen and bathroom remodel. add new sub-panel, new flooring & paint. replace (3) vinyl windows, non-streetDetails
unit #301: kitchen and bathroom remodel. add new sub-panel, new flooring & paint. replace (3) vinyl windows, non-street | $38,000 |
| Jan 12, 2018 | Completed final sign-off Jul 2019 | 70 Sotelo Av | reconfigure main floor layout with new bedrooms and bath, kitchen and stairs to lower floor. reconfigure lower floor layout with new bedrooms and bath. roof/wall repair at (e) kitchen. no change to front of houseDetails
reconfigure main floor layout with new bedrooms and bath, kitchen and stairs to lower floor. reconfigure lower floor layout with new bedrooms and bath. roof/wall repair at (e) kitchen. no change to front of house | $100,000 |
| Oct 23, 2017 | Completed final sign-off Nov 2017 | 1839 47th Av | add full bathroom at ground floor. new dwv, new outlets & switches, high efficacy fixtures, 1 new exhaust fan.Details
add full bathroom at ground floor. new dwv, new outlets & switches, high efficacy fixtures, 1 new exhaust fan. | $10,000 |
| Aug 21, 2017 | Completed final sign-off Nov 2020 | 801 Pacific Av | comply w/nov #201760803. 1/f & basement repair (e) fire damaged retail shops & storage, prepare vanilla shell for future tenant under separate ti permits. 2/f: repair (e) fire damage in rooms & add new bathroom. upgrade restrooms to ada & remodel (e) shower & toilets. replace roll down gate in kindDetails
comply w/nov #201760803. 1/f & basement repair (e) fire damaged retail shops & storage, prepare vanilla shell for future tenant under separate ti permits. 2/f: repair (e) fire damage in rooms & add new bathroom. upgrade restrooms to ada & remodel (e) shower & toilets. replace roll down gate in kind | $80,000 |
| Jun 21, 2017 | Completed final sign-off Jan 2018 | 2134 14th Av | remodel kitchen, 1/f bathroom & master bathroom. add subpanel in kitchen. fix woodrot. remove & replace non-structural view window.Details
remodel kitchen, 1/f bathroom & master bathroom. add subpanel in kitchen. fix woodrot. remove & replace non-structural view window. | $40,000 |
| Jun 8, 2017 | Completed final sign-off Jul 2019 | 527 Bryant St | remodel five bathrooms. remove and replace plumbing fixtures. retile bathrooms, upgrade (e) galvanized pipes to copper. replace dwv cast iron. add exhaust vents, add insulaton and new drywall throughout. new off street windows replacement. replace woodrot framing as needed.Details
remodel five bathrooms. remove and replace plumbing fixtures. retile bathrooms, upgrade (e) galvanized pipes to copper. replace dwv cast iron. add exhaust vents, add insulaton and new drywall throughout. new off street windows replacement. replace woodrot framing as needed. | $25,000 |
| May 25, 2017 | Completed final sign-off Nov 2017 | 1200 Gough St | unit 5e: install washer and dryer combo unit, replace bath fixture, kitchen remodel.Details
unit 5e: install washer and dryer combo unit, replace bath fixture, kitchen remodel. | $12,000 |
| Feb 15, 2017 | Completed final sign-off Aug 2017 | 1839 47th Av | remodel kitchen & bathroom: install insulation. replace sheet rock. new 125a service & main panel. new copper plmbing & dmw system. new water heater. new gas furnace. r/r 3 windows in-kind in rear of building.replace 2 (e) skylights. new floor tile & engineeered flooring.Details
remodel kitchen & bathroom: install insulation. replace sheet rock. new 125a service & main panel. new copper plmbing & dmw system. new water heater. new gas furnace. r/r 3 windows in-kind in rear of building.replace 2 (e) skylights. new floor tile & engineeered flooring. | $100,000 |
| Jan 12, 2017 | Completed final sign-off Mar 2017 | 54 Brentwood Av | remodel kitchen. remove 2 non bearing walls. add plywood panel, holddowns to existing walls. remodel 2 existing baths. repair exterior stucco dry rot near kitchen window in sf, replace 2 windows at kitchen not visible from street. gen eral mp upgrades. now work in basement streetlevelDetails
remodel kitchen. remove 2 non bearing walls. add plywood panel, holddowns to existing walls. remodel 2 existing baths. repair exterior stucco dry rot near kitchen window in sf, replace 2 windows at kitchen not visible from street. gen eral mp upgrades. now work in basement streetlevel | $44,500 |
| Dec 30, 2016 | Completed final sign-off Mar 2017 | 2965 Sacramento St | apt 105: remodel 1 kitchen, new subpanel & ckts. remodel 1 bathroom; replace flooring.Details
apt 105: remodel 1 kitchen, new subpanel & ckts. remodel 1 bathroom; replace flooring. | $20,000 |
| Sep 8, 2016 | Completed final sign-off Oct 2016 | 77 Dow Pl | remodel main floor half-bathroom: new tiles, vanity, sink & light. remodel upper floor full bathroom: new showerpan, tiles, toilket, new dual vainty & sink. new light & outlet.Details
remodel main floor half-bathroom: new tiles, vanity, sink & light. remodel upper floor full bathroom: new showerpan, tiles, toilket, new dual vainty & sink. new light & outlet. | $25,000 |
| Jul 6, 2016 | Completed final sign-off Aug 2016 | 2965 Sacramento St | #103 - remodel kitchen & bathroom. add sub-panel in kind.Details
#103 - remodel kitchen & bathroom. add sub-panel in kind. | $30,000 |
| Jun 20, 2016 | Completed final sign-off Aug 2016 | 2965 Sacramento St | unit#101. remodel kitchen & bathroom. add subpanel in-kind.Details
unit#101. remodel kitchen & bathroom. add subpanel in-kind. | $30,000 |
| May 23, 2016 | Completed final sign-off Jul 2016 | 1512 Leavenworth St | renovate 1512 leavenworth: kitchen and split bathroom. remove and replace rear windows (no frontage windows). upgrade electrical wiring, add new sub-panelDetails
renovate 1512 leavenworth: kitchen and split bathroom. remove and replace rear windows (no frontage windows). upgrade electrical wiring, add new sub-panel | $40,000 |
| Apr 6, 2016 | Completed final sign-off May 2016 | 55 Keystone Wy | removable bathroom. replace dual vanity and faucets. new floor and wall tile. new tile in shower stall. remove exiting tub, replace toilet.Details
removable bathroom. replace dual vanity and faucets. new floor and wall tile. new tile in shower stall. remove exiting tub, replace toilet. | $11,000 |
| Jan 27, 2016 | Completed final sign-off Nov 2016 | 190 Collins St | no work. document 4 units, not 5. existing full bath and wet bar in garage storage. maher not reqDetails
no work. document 4 units, not 5. existing full bath and wet bar in garage storage. maher not req | |
| Jan 15, 2016 | Completed final sign-off Mar 2016 | 77 Dow Pl | remove and replace kitchen cabinet, counters and appliances to (e) position. remove and replace main floor 1/2 bath vanity, faucet and toilet to (e) position. remove and replace upper floor bath vanity, cabinet, tub and surround, faucets to (e) position. no alt. at wall, window and door.Details
remove and replace kitchen cabinet, counters and appliances to (e) position. remove and replace main floor 1/2 bath vanity, faucet and toilet to (e) position. remove and replace upper floor bath vanity, cabinet, tub and surround, faucets to (e) position. no alt. at wall, window and door. | $30,000 |
| Dec 10, 2015 | Completed final sign-off Mar 2016 | 147 Day St | renovate kitchen , add 8 new circuits, remove water heater, replace with tankless water heater in laundry room. re-tile bathroom.Details
renovate kitchen , add 8 new circuits, remove water heater, replace with tankless water heater in laundry room. re-tile bathroom. | $29,000 |
| Oct 29, 2015 | Completed final sign-off Jun 2016 | 2543 44th Av | remodel 2/f including (n) exterior windows & doors, remove load bearing wall, (n) electrical, furnace & water heater. conversion of storage to bedroom, add bathroom on 1/f. add rear deck & stair.Details
remodel 2/f including (n) exterior windows & doors, remove load bearing wall, (n) electrical, furnace & water heater. conversion of storage to bedroom, add bathroom on 1/f. add rear deck & stair. | $60,000 |
| Oct 14, 2015 | Completed final sign-off Dec 2015 | 23 Los Palmos Dr | legalize ground floor bedroom & bathroom per plans. renovate kitchen on 2nd floor. remove and replace cabinets & counters. remove and reset appliances, retile floor. update kitchen electrical circuits.Details
legalize ground floor bedroom & bathroom per plans. renovate kitchen on 2nd floor. remove and replace cabinets & counters. remove and reset appliances, retile floor. update kitchen electrical circuits. | $30,000 |
| Sep 29, 2015 | Expired or cancelled cancelled Nov 2024 | 429 Laidley St | renovation per plans submitted: new vertical addition in rear of bldg, add 1230 sqft, new addition height will be 20'10". three new bedrooms, two new bathrooms. renovate kitchen & family rooms.Details
renovation per plans submitted: new vertical addition in rear of bldg, add 1230 sqft, new addition height will be 20'10". three new bedrooms, two new bathrooms. renovate kitchen & family rooms. | $110,000 |
| May 4, 2015 | Never finaled issued May 2015, no final | 429 Laidley St | demolition & exploratory main fl living rm, ceiling & wall. kitchen & bath walls to expose piping & conduits. only at locations of utility. re-install when complete to (e) condition for spot exposure & restore only. no framing change.Details
demolition & exploratory main fl living rm, ceiling & wall. kitchen & bath walls to expose piping & conduits. only at locations of utility. re-install when complete to (e) condition for spot exposure & restore only. no framing change. | $500 |
| Mar 16, 2015 | Completed final sign-off Apr 2015 | 1798 Grove St | #3- add sub-panel, upgrade electrical to 2015 code, renovate kitchen & bath, no walls to be moved, no structural work, finishes & fixtures only.Details
#3- add sub-panel, upgrade electrical to 2015 code, renovate kitchen & bath, no walls to be moved, no structural work, finishes & fixtures only. | $25,000 |
| Feb 9, 2015 | Never finaled filed Feb 2015, never issued | 429 Laidley St | add new top floor. extend building per plans. elec & plumbing upgrades per plans. add 2 full bathrooms & 1 half bathroom. add 3 bedrooms.Details
add new top floor. extend building per plans. elec & plumbing upgrades per plans. add 2 full bathrooms & 1 half bathroom. add 3 bedrooms. | $150,000 |
| Nov 5, 2014 | Completed final sign-off Dec 2014 | 118 Church St | apt. #103:renovate kitchen and bath. update electrical outlet. add suppanel for kitchenDetails
apt. #103:renovate kitchen and bath. update electrical outlet. add suppanel for kitchen | $18,000 |
| Oct 27, 2014 | Completed final sign-off Jan 2015 | 2965 Sacramento St | unit #302: remodel kitchen & bathroom, add sub-panel, update apartment electricDetails
unit #302: remodel kitchen & bathroom, add sub-panel, update apartment electric | $30,000 |
| Sep 4, 2014 | Completed final sign-off Nov 2014 | 158 Burnside Av | legalize room & full bath in the garageDetails
legalize room & full bath in the garage | $7,000 |
| Aug 27, 2013 | Never finaled issued Jul 2016, no final | 429 Laidley St | 2 story horizontal addition at rear of bldg. 4 bedrooms, 2 bathrooms.Details
2 story horizontal addition at rear of bldg. 4 bedrooms, 2 bathrooms. | $80,000 |
| Jun 21, 2013 | Completed final sign-off Dec 2013 | 201 Juanita Wy | build dormer window in roof, build bathroom in existing room, install solar tube skylight, remove & replace chimney & shoulders.Details
build dormer window in roof, build bathroom in existing room, install solar tube skylight, remove & replace chimney & shoulders. | $49,000 |
| May 6, 2013 | Completed final sign-off Jun 2013 | 635 Minna St | comply with nov cts 201152518 remodel lower bathroom. remove & replace shower stall. remove & replace toilet 1.28 gallon per flush, repair & replace vanity. upgrade gfci plug. install ventl, install light, retile floorDetails
comply with nov cts 201152518 remodel lower bathroom. remove & replace shower stall. remove & replace toilet 1.28 gallon per flush, repair & replace vanity. upgrade gfci plug. install ventl, install light, retile floor | $2,000 |
| Sep 19, 2011 | Completed final sign-off Feb 2012 | 549 Andover St | upgrade (e) half bath rm into full bathrm at second fl. construct study rm & half bath rm (in-fill under (e) breakfast rm). all work at ground fl. & replace (e) deck w/ new deck @ rear under 10'Details
upgrade (e) half bath rm into full bathrm at second fl. construct study rm & half bath rm (in-fill under (e) breakfast rm). all work at ground fl. & replace (e) deck w/ new deck @ rear under 10' | $28,000 |
| Apr 6, 2011 | Completed final sign-off Jun 2011 | 1346 41st Av | repair fire damage in kind-no plans. correct violation #201109762: rewire 2 units up to code. sheet rock, 2 entire, 1 bedroom unit. install two kitchens. install two new bathroom. re-do floors. replace 6 windows. replace siding, repai exterior stairs. repair/replace entire roof. one window visibleDetails
repair fire damage in kind-no plans. correct violation #201109762: rewire 2 units up to code. sheet rock, 2 entire, 1 bedroom unit. install two kitchens. install two new bathroom. re-do floors. replace 6 windows. replace siding, repai exterior stairs. repair/replace entire roof. one window visible | $120,000 |
| Dec 17, 2010 | Completed final sign-off Apr 2011 | 51 Keystone Wy | interior remodel space behind garage, bedroom and bathroom and great room.demolish concrete slab, exterior wall for windows and bathroom.Details
interior remodel space behind garage, bedroom and bathroom and great room.demolish concrete slab, exterior wall for windows and bathroom. | $42,000 |
| Oct 27, 2010 | Completed final sign-off Dec 2010 | 51 Keystone Wy | one bathroom remodel, new tiles floor and wall, new tub, toilet and vanity, install 2 gfci outlets, install vent fan/light, non structural, lighting to comply with cec 150(k)Details
one bathroom remodel, new tiles floor and wall, new tub, toilet and vanity, install 2 gfci outlets, install vent fan/light, non structural, lighting to comply with cec 150(k) | $21,000 |
| Feb 1, 2010 | Completed final sign-off Mar 2010 | 1282 Clayton St | remove & replace 12ft kitchen cabinets, vent range. no dishwasher, no garbage disposal, remove & replace 2x3 aluminum window with vinyl window. install laminate flooring. bathroom: remove & replace vanity & sink, toilet, install new floor tiles, for unit #1284Details
remove & replace 12ft kitchen cabinets, vent range. no dishwasher, no garbage disposal, remove & replace 2x3 aluminum window with vinyl window. install laminate flooring. bathroom: remove & replace vanity & sink, toilet, install new floor tiles, for unit #1284 | $23,000 |
| May 18, 2009 | Completed final sign-off Aug 2009 | 2921 21st Av | remodel 2 existing full bathrooms. re-tile, new vanity & sinks, new tub & faucets, 2 new low water (1.6 gal) toilets. remodel (e) kitchen: new cabinets & counters. new fridge & range. upgrade (e) vent. new sink. no garbage disposal or dishwasher.Details
remodel 2 existing full bathrooms. re-tile, new vanity & sinks, new tub & faucets, 2 new low water (1.6 gal) toilets. remodel (e) kitchen: new cabinets & counters. new fridge & range. upgrade (e) vent. new sink. no garbage disposal or dishwasher. | $12,000 |
| Apr 24, 2009 | Completed final sign-off Aug 2009 | 2921 21st Av | add downstairs, 1 office, 1 bathroom, tv room, wet bar. also, demolition of concrete slab to meet sf code requirements. add windows at property line and rear of building.Details
add downstairs, 1 office, 1 bathroom, tv room, wet bar. also, demolition of concrete slab to meet sf code requirements. add windows at property line and rear of building. | $70,000 |
| Jun 20, 2008 | Expired or cancelled expired Nov 2011 | 1248 Golden Gate Av | g/f-remodel (e) kitchen, remove/relocate (e)bathroom, repalce (e)window/sliding door with new. 2/f-remove/relocate (e)kitchen, remodel (e)bath, add one new bath & replace (e)window/sliding door with new. 3/f-remove/relocate (e)kitchen,remodel 2 (e)baths, add 1 bath, replace (e)window/sliding door.Details
g/f-remodel (e) kitchen, remove/relocate (e)bathroom, repalce (e)window/sliding door with new. 2/f-remove/relocate (e)kitchen, remodel (e)bath, add one new bath & replace (e)window/sliding door with new. 3/f-remove/relocate (e)kitchen,remodel 2 (e)baths, add 1 bath, replace (e)window/sliding door. | $85,000 |
| Jan 3, 2008 | Completed final sign-off May 2009 | 2790 California St | 2nd floor , unit #2790 only - remodel existing kitchen and bathroom at 2nd floor. replace existing furnace with new, add 2nd bathroom at 2nd floor, reconfigure ex living rm, dining rm, bedroom per plan. all work in unit 2790, 2nd floor.Details
2nd floor , unit #2790 only - remodel existing kitchen and bathroom at 2nd floor. replace existing furnace with new, add 2nd bathroom at 2nd floor, reconfigure ex living rm, dining rm, bedroom per plan. all work in unit 2790, 2nd floor. | $35,000 |