Block 1386, lot 067
225 26th Av
- City’s use
- Single Family Residential
- Built
- 2001
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,031 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 27, 2022 | Never finaled issued Dec 2022, no final | 225 26th Av | Apollo Building & Roofing Group Inc. | 20 sq feet tear off and install 19/20 sq ft of 3 ply modified, bitumen by certaintedd and 1/20 sq ft of shingles. cool roof required sr1 64 at low slope, sr1 16 at steep slope.Details
20 sq feet tear off and install 19/20 sq ft of 3 ply modified, bitumen by certaintedd and 1/20 sq ft of shingles. cool roof required sr1 64 at low slope, sr1 16 at steep slope. | $14,866 |
| Mar 24, 2021 | Expired or cancelled withdrawn Apr 2021 | 225 26th Av | Kwong Associates | g/f: to comply with nov201922741 & 202173994: reduce size of (e) restroom on g/f to 5x5ft for room matrix ordinance.Details
g/f: to comply with nov201922741 & 202173994: reduce size of (e) restroom on g/f to 5x5ft for room matrix ordinance. | $8,000 |
| Apr 1, 2019 | Expired or cancelled withdrawn Jan 2021 | 225 26th Av | Kwong Associates | revision to pa 201901291464. add partition walls in home office work space into 2-room office space. abate n.o.c 2018-010097 enf.Details
revision to pa 201901291464. add partition walls in home office work space into 2-room office space. abate n.o.c 2018-010097 enf. | $2,500 |
| Feb 25, 2019 | Completed final sign-off Jan 2020 | 225 26th Av | Kwong Associates | repair and remodel unit a hallway bath and master bath. repair water damaged floors and drywallDetails
repair and remodel unit a hallway bath and master bath. repair water damaged floors and drywall | $30,000 |
| Jan 29, 2019 | Completed final sign-off Jan 2020 | 225 26th Av | Kwong Associates | repair water damaged ground floor, home office space, and half bathroom. repair bar sink and counters.Details
repair water damaged ground floor, home office space, and half bathroom. repair bar sink and counters. | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kwong Associates (4), Apollo Building & Roofing Group Inc.
- Authorized agent-otherss
- Daniel Diaz
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.