Block 1025, lot 033
2965 Sacramento St
24 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 9, 2026 | Completed final sign-off Feb 2026 | 2965 Sacramento St | Tachtook Tacktook Construction | apt 305: kitchen and bathroom remodel in kind. new cabinets, electrical, lights, faucet, stove, dishwasher, replace tub for tub, vanity, new fan, faucet. install 3 electric wall heaters, new subpanel. replace 4 windows non street facing. | $20,000 |
| Feb 27, 2023 | Completed final sign-off Apr 2023 | 2965 Sacramento St | Tachtook Tacktook Construction | unit# 303: bathrm remodel in-kind: replace toilet,tub,vanity fan and heat, kitchen remodel in-kind: cabinets,counter and hood, dishwasher, install electric sub panel, 11-recessed lights, replace sockets, 2-wall heaters, replace 4 vinyl windows in rear in-kind, replace hardwood flrs and paint in kind | $32,000 |
| Jan 11, 2023 | Completed final sign-off Mar 2023 | 2965 Sacramento St | Firelectric | addition of low frequency sounders to comply with sffd code 11:03.7.6.1 to existing fire alarm system | $23,500 |
| Dec 29, 2021 | Completed final sign-off Mar 2022 | 2965 Sacramento St | Ac And Company | unit 304: remodel one kitchen and one bathroom. provide & install kitchen cabinets with countertop with new fixtures, new bathtub, vanity and associated plumbing- new sub-panel with lights. non structural, in kind. | $38,000 |
| Jul 20, 2021 | Completed final sign-off Aug 2021 | 2965 Sacramento St | Ac And Company | unit #102: remodel kitchen and bathroo, provide and install kitchen cabinets with counter top d/w, new fixtures, new bath tops vanity and associated plumbing new sub pannel with can lights thru out | $38,000 |
| May 14, 2021 | Completed final sign-off Jun 2021 | 2965 Sacramento St | Ac And Company | unit 203: remodel one kitchen & one bathroom. provide & install kitchen & cabinets with countertop with new fixture. new bathtub, vanity and associated plumbing. new subpanel with light. non structural. | $38,000 |
| Jan 11, 2021 | Completed final sign-off Mar 2021 | 2965 Sacramento St | Ac And Company | unit #205: remodel kitchen & bahtroom. provide 7 install new cabinets, countertop, sink, faucet, new fixtures. bathroom - new tub, vanity, & associated plumbing. new subpanel with can lights throughout. | $38,000 |
| Oct 1, 2020 | Completed final sign-off Nov 2020 | 2965 Sacramento St | Ac And Company | unit 201: remodel kitchen & bathroom, provide/install kitchen cabinets w/countertop, d/w, new fixtures, new bath tub vanity, associated plumbing, new subpanel w/can lights throughout | $38,000 |
| Feb 12, 2019 | Completed final sign-off Apr 2019 | 2965 Sacramento St | Kwong Associates | unit #202: renovate kitchen and bathroom. add new sub panel. kitchen approx 10'x12, bathroom 5'x8'. | $30,000 |
| Feb 13, 2018 | Completed final sign-off Apr 2018 | 2965 Sacramento St | Kwong Associates | unit #301: kitchen and bathroom remodel. add new sub-panel, new flooring & paint. replace (3) vinyl windows, non-street | $38,000 |
| Feb 2, 2018 | Expired or cancelled suspend Aug 2025 | 2965 Sacramento St | Jemico Llc Dba Renewal By Andersen Of Sf | kitchen and bathroom remodel. add new sub-panel, new flooring & paint. replace (3) vinyl windows, non-street | $8,231 |
| Dec 30, 2016 | Completed final sign-off Mar 2017 | 2965 Sacramento St | Kwong Associates | apt 105: remodel 1 kitchen, new subpanel & ckts. remodel 1 bathroom; replace flooring. | $20,000 |
| Jul 6, 2016 | Completed final sign-off Aug 2016 | 2965 Sacramento St | Kwong Associates | #103 - remodel kitchen & bathroom. add sub-panel in kind. | $30,000 |
| Jun 20, 2016 | Completed final sign-off Aug 2016 | 2965 Sacramento St | Kwong Associates | unit#101. remodel kitchen & bathroom. add subpanel in-kind. | $30,000 |
| Aug 6, 2015 | Never finaled issued Aug 2015, no final | 2965 Sacramento St | Kwong Associates | remove and replace windows sacramento st frontage with inkind windows, same configuration side and rear windows replaced with vinyl windows. street facing orginal aluminum in kind.number of windows are 48ea replaced. u-factor 0.32 or less. | $50,000 |
| Oct 27, 2014 | Completed final sign-off Jan 2015 | 2965 Sacramento St | Kwong Associates | unit #302: remodel kitchen & bathroom, add sub-panel, update apartment electric | $30,000 |
| Dec 4, 2013 | Completed final sign-off Dec 2013 | 2965 Sacramento St | Arnest Termite Control | items 1 and 2 in arnest termite report # 6451b4. repair wood framing. cover with new material | $24,000 |
| Nov 21, 2013 | Never finaled issued Nov 2013, no final | 2965 Sacramento St | Arnest Termite Control | arnest termite report 3 6440b4. reove all siding limted to side wall & submit a supplemental report at front left approx 20 x 40 feet. | $3,100 |
| Sep 25, 2013 | Never finaled issued Sep 2013, no final | 2965 Sacramento St | street space permit | ||
| Jun 10, 2013 | Never finaled issued Jun 2013, no final | 2965 Sacramento St | street space | ||
| Dec 27, 2011 | Completed final sign-off Jan 2012 | 2965 Sacramento St | S J Gogol Construction | repair studs at right side exterior wall, 10 studs, approx 15 long-10' high above ground, replace in kind, revision to appn 201110186996 | $1,800 |
| Oct 18, 2011 | Completed final sign-off Jan 2012 | 2965 Sacramento St | S J Gogol Construction | raise sill height exist. footing all work at gr floor (south-west corner approx. 33'-0"). cap foundation only. | $6,800 |
| Aug 26, 2010 | In progress filed Aug 2010, not yet issued | 2965 Sacramento St | S J Gogol Construction | replace 5 post infected and fungus damage in the carport area of the complex. | $6,000 |
| Mar 26, 2002 | Completed final sign-off May 2002 | 2965 Sacramento St | Armstrong Installation Service | reroofing | $27,500 |