Tachtook Tacktook Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2012 to Jan 2026
- Last 24 months
- 2 permits filed
44 permits since 2000: 35 completed, 1 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2026 | Completed final sign-off Feb 2026 | 2965 Sacramento St | apt 305: kitchen and bathroom remodel in kind. new cabinets, electrical, lights, faucet, stove, dishwasher, replace tub for tub, vanity, new fan, faucet. install 3 electric wall heaters, new subpanel. replace 4 windows non street facing.Details
apt 305: kitchen and bathroom remodel in kind. new cabinets, electrical, lights, faucet, stove, dishwasher, replace tub for tub, vanity, new fan, faucet. install 3 electric wall heaters, new subpanel. replace 4 windows non street facing. | $20,000 |
| Feb 28, 2025 | In progress filed Feb 2025, not yet issued | 1346 41st Av | remove 2nd fl floor deck, stairs & post. remove partial wood fence to accomodate installation of 1 hour fire rated wall. install new 2nd fl deck, stairs & post. install new 1 hour fire rated wall.Details
remove 2nd fl floor deck, stairs & post. remove partial wood fence to accomodate installation of 1 hour fire rated wall. install new 2nd fl deck, stairs & post. install new 1 hour fire rated wall. | $15,000 |
| May 15, 2024 | Completed final sign-off May 2024 | 1 Valdez Av | revision to 201808177724 rename ground fl bedroom to office. ref renewal 202401244524Details
revision to 201808177724 rename ground fl bedroom to office. ref renewal 202401244524 | |
| Jan 24, 2024 | Completed final sign-off May 2024 | 1 Valdez Av | to obtain final inspection for work approved under pa# 2019-0128-1375 & 2018-0817-7724. all work is complete.Details
to obtain final inspection for work approved under pa# 2019-0128-1375 & 2018-0817-7724. all work is complete. | |
| Jun 29, 2023 | Completed final sign-off Aug 2023 | 2286 27th Av | dry rot removal & replacement at exterior stairs in kind.Details
dry rot removal & replacement at exterior stairs in kind. | $35,000 |
| May 22, 2023 | Completed final sign-off Aug 2023 | 2286 27th Av | remove/replace (e) stucco fence in-kind. terra cotta tiles will be replaced / reused inthe same locationsDetails
remove/replace (e) stucco fence in-kind. terra cotta tiles will be replaced / reused inthe same locations | $52,200 |
| Feb 27, 2023 | Completed final sign-off Apr 2023 | 2965 Sacramento St | unit# 303: bathrm remodel in-kind: replace toilet,tub,vanity fan and heat, kitchen remodel in-kind: cabinets,counter and hood, dishwasher, install electric sub panel, 11-recessed lights, replace sockets, 2-wall heaters, replace 4 vinyl windows in rear in-kind, replace hardwood flrs and paint in kindDetails
unit# 303: bathrm remodel in-kind: replace toilet,tub,vanity fan and heat, kitchen remodel in-kind: cabinets,counter and hood, dishwasher, install electric sub panel, 11-recessed lights, replace sockets, 2-wall heaters, replace 4 vinyl windows in rear in-kind, replace hardwood flrs and paint in kind | $32,000 |
| Aug 19, 2022 | Completed final sign-off Oct 2022 | 108 22nd Av | toliet and shower remodel in kind: remove and replace toilet, shower, lavatory, fan, flooring tiles, switches, gfci and 2nd floor. remodeling 1/2 bath, remove existing toilet, fan, switches, gfci and replace in kind 2nd floor. install electrical subpanwl 2nd floor.Details
toliet and shower remodel in kind: remove and replace toilet, shower, lavatory, fan, flooring tiles, switches, gfci and 2nd floor. remodeling 1/2 bath, remove existing toilet, fan, switches, gfci and replace in kind 2nd floor. install electrical subpanwl 2nd floor. | $12,000 |
| Jul 8, 2022 | Never finaled issued Jul 2022, no final | 331 Monterey Bl | replace kitchen cabinets and kitchen counter in kind. no change to wall layout or floor layout.Details
replace kitchen cabinets and kitchen counter in kind. no change to wall layout or floor layout. | $6,000 |
| May 27, 2022 | Never finaled issued May 2022, no final | 924 Florida St | bath remodel, in kind. remove and replace toilet, shower, lavatory, fan and flooring tiles. install (3) recessed lights.Details
bath remodel, in kind. remove and replace toilet, shower, lavatory, fan and flooring tiles. install (3) recessed lights. | $9,000 |
| May 3, 2022 | Completed final sign-off Sep 2022 | 88 King St | unit #1121: two bathroom remodel. remove and relocate in-kind tile, floor, vanity and toilet in master and guest bathroom, remove bath tub and replace standing shower in master bathroomDetails
unit #1121: two bathroom remodel. remove and relocate in-kind tile, floor, vanity and toilet in master and guest bathroom, remove bath tub and replace standing shower in master bathroom | $22,000 |
| Jul 28, 2021 | Never finaled issued Jul 2021, no final | 255 Castro St | adding hardie material on south facing wall, 15ft high x 55ft long. non-street visable.Details
adding hardie material on south facing wall, 15ft high x 55ft long. non-street visable. | $12,000 |
| Jul 28, 2021 | Expired or cancelled cancelled Jan 2026 | 856 Stanyan St | administrative permit only: change of occupancy from "b" to "m"Details
administrative permit only: change of occupancy from "b" to "m" | |
| May 27, 2021 | Completed final sign-off Aug 2021 | 1735 39th Av | replace kitchen cabinets and replace faucet in-kind.remodel bathroom, r/r tub, faucet and vanity in-kind. replace 100amp electrical subpanel. replacement of roof shingles only (less than 20%)Details
replace kitchen cabinets and replace faucet in-kind.remodel bathroom, r/r tub, faucet and vanity in-kind. replace 100amp electrical subpanel. replacement of roof shingles only (less than 20%) | $30,000 |
| Oct 30, 2020 | Completed final sign-off Apr 2021 | 251 Castro St | kitchen remodel in-kind. replace e cabinets, countertops, sink, including plumbing fixtures. remove e wood burning fire place and cover opening. install pantry cabinet. install 6 n recessed lights in kitchen. replace electrical panel from 60 amps to 100 amps sub panel.Details
kitchen remodel in-kind. replace e cabinets, countertops, sink, including plumbing fixtures. remove e wood burning fire place and cover opening. install pantry cabinet. install 6 n recessed lights in kitchen. replace electrical panel from 60 amps to 100 amps sub panel. | $20,000 |
| Oct 19, 2020 | Completed final sign-off Nov 2020 | 255 Castro St | reroofingDetails
reroofing | $12,000 |
| Sep 3, 2020 | Never finaled issued Feb 2021, no final | 255 Castro St | revision to pa #2020-0227-5644:(n) kitchen west wall to be move 25"(+-) more additional towards the stairway.Details
revision to pa #2020-0227-5644:(n) kitchen west wall to be move 25"(+-) more additional towards the stairway. | $1,000 |
| Feb 27, 2020 | Completed final sign-off May 2021 | 255 Castro St | convert full bath into half bath, install pantry. install new full bath. install new electrical recessed lights and replace per plan. revision to pa #2019 1018 4965Details
convert full bath into half bath, install pantry. install new full bath. install new electrical recessed lights and replace per plan. revision to pa #2019 1018 4965 | $14,000 |
| Nov 14, 2019 | Completed final sign-off Aug 2020 | 2726 20th St | revision to pa# 2019-0703-5092: eliminating work on 2nd floorDetails
revision to pa# 2019-0703-5092: eliminating work on 2nd floor | |
| Oct 18, 2019 | Completed final sign-off May 2021 | 255 Castro St | renovate 2 toilet and bath including plmg & elec. renovate kitchen, including plmg & electrical. remove extg interior walls to create closet and shelving and to extend kitchen area.Details
renovate 2 toilet and bath including plmg & elec. renovate kitchen, including plmg & electrical. remove extg interior walls to create closet and shelving and to extend kitchen area. | $40,000 |
| Oct 8, 2019 | Never finaled issued Oct 2019, no final | 1447 06th Av | approx total sq ft of replaced windows 99 sf. change 6 windows milgard at the back of the house. not visible from street. all windows on rear wall. no structural work. all winodws are same size as original. no relocation of winodws.Details
approx total sq ft of replaced windows 99 sf. change 6 windows milgard at the back of the house. not visible from street. all windows on rear wall. no structural work. all winodws are same size as original. no relocation of winodws. | $3,750 |
| Aug 15, 2019 | Completed final sign-off Nov 2019 | 1575 Innes Av | remodeling kitchen, one bathroom, and one half bathroom. kitchen: remove existing cabinet and replace with new. install new electrical outlets, redcessed lighting. bathroom: install gfi and lighting.Details
remodeling kitchen, one bathroom, and one half bathroom. kitchen: remove existing cabinet and replace with new. install new electrical outlets, redcessed lighting. bathroom: install gfi and lighting. | $35,000 |
| Jul 25, 2019 | Completed final sign-off Aug 2019 | 825 Newhall St | existing deck, repair dryrot, remove existing joist floor 2x8, replace with new one. correct with 2x6 redwood. existing area 12ftx16ft.Details
existing deck, repair dryrot, remove existing joist floor 2x8, replace with new one. correct with 2x6 redwood. existing area 12ftx16ft. | $3,500 |
| Jun 17, 2019 | Completed final sign-off Aug 2019 | 521 Hill St | renovate toilet and bathroom in the first floor (includes remodel of bathtub, toilet, lavatory, and tiles. renovate toilet and bath in kind at the second floor (same as the first floor). includes plumbing and electrical. in-kindDetails
renovate toilet and bathroom in the first floor (includes remodel of bathtub, toilet, lavatory, and tiles. renovate toilet and bath in kind at the second floor (same as the first floor). includes plumbing and electrical. in-kind | $20,000 |
| Jul 2, 2018 | Completed final sign-off Apr 2019 | 331 Monterey Bl | additional 2 bedrooms and 1 toilet and bath, including electrical and plumbing/mechanical at basement.Details
additional 2 bedrooms and 1 toilet and bath, including electrical and plumbing/mechanical at basement. | $20,000 |
| Jun 18, 2018 | Completed final sign-off Nov 2018 | 947 Green St | unit 2: 2-1/2 bathroom remodel, master bath (e) shwer with steam, replace same locations; remove/replace toilets, fans, shower pan, tub, paint, flooring, replace outlets, lighting, lighting to comply w/cec150.0(k), 250, sq. ft., no change to exhaustDetails
unit 2: 2-1/2 bathroom remodel, master bath (e) shwer with steam, replace same locations; remove/replace toilets, fans, shower pan, tub, paint, flooring, replace outlets, lighting, lighting to comply w/cec150.0(k), 250, sq. ft., no change to exhaust | $30,000 |
| May 3, 2018 | Completed final sign-off May 2018 | 1447 06th Av | comply with nov 201854311: scope of work includes removal of partition built w/o permit and removal & replacement in kind of dryrot on deck less than 50% in kind.Details
comply with nov 201854311: scope of work includes removal of partition built w/o permit and removal & replacement in kind of dryrot on deck less than 50% in kind. | $1,500 |
| Jul 27, 2017 | Completed final sign-off Nov 2017 | 652 Clarendon Av | remove existing kitchen cabinets, replace with new one and new counter and new sink and faucet. no other work.Details
remove existing kitchen cabinets, replace with new one and new counter and new sink and faucet. no other work. | $7,500 |
| Mar 22, 2017 | Completed final sign-off Nov 2017 | 328 Joost Av | remove existing siding, ceramic tiling, water proof the stairs and place granite on steps. not visable to the street.Details
remove existing siding, ceramic tiling, water proof the stairs and place granite on steps. not visable to the street. | $3,000 |
| Sep 19, 2016 | Completed final sign-off Nov 2016 | 2025 Jackson St | to renew & obtain final inspection for pa 2014-0918-6673. all work is complete. n/a for maher.Details
to renew & obtain final inspection for pa 2014-0918-6673. all work is complete. n/a for maher. | |
| Mar 8, 2016 | Completed final sign-off May 2016 | 825 Newhall St | replace extg rear dry-rot stair in kind.Details
replace extg rear dry-rot stair in kind. | $7,500 |
| Feb 19, 2016 | Completed final sign-off Oct 2016 | 87 Beaver St | replacing vinyl windows visible to street (9) with aluminum clad wood interiorDetails
replacing vinyl windows visible to street (9) with aluminum clad wood interior | $9,000 |
| Feb 19, 2016 | Completed final sign-off Oct 2016 | 251 Castro St | replacing vinyl windows - visible from street (47) with aluminum clad wood interior. u=0.32 maxDetails
replacing vinyl windows - visible from street (47) with aluminum clad wood interior. u=0.32 max | $40,000 |
| Sep 24, 2015 | Completed final sign-off May 2016 | 825 Newhall St | repair emergency stairs in back of bld "parking lot" steps and railing less than 50%Details
repair emergency stairs in back of bld "parking lot" steps and railing less than 50% | $2,000 |
| Jul 15, 2015 | Completed final sign-off Sep 2015 | 825 Newhall St | replace (17) picture frame windows on west side. replace trim around existing windows. scaffolding will be installed. outer windows only. stained glass windows to remain.Details
replace (17) picture frame windows on west side. replace trim around existing windows. scaffolding will be installed. outer windows only. stained glass windows to remain. | $9,000 |
| Jul 8, 2015 | Completed final sign-off Nov 2015 | 1741 11th Av | interior remodel of unit within a duplex. elec, plumbing under sep permitDetails
interior remodel of unit within a duplex. elec, plumbing under sep permit | $25,000 |
| Dec 23, 2014 | Completed final sign-off Jan 2015 | 542 Athens St | replace damaged stucco in-kind at front left side. comply with nov 201411612 (repair in kind) no structural damaged per engineer report dtd 12-15-14.Details
replace damaged stucco in-kind at front left side. comply with nov 201411612 (repair in kind) no structural damaged per engineer report dtd 12-15-14. | $3,000 |
| Sep 18, 2014 | Expired or cancelled expired Nov 2016 | 2025 Jackson St | revision to pa #2013.1231.5376 & 2014.0619.8915 - remodel (e) master bathroom & replace (e) bathtubs & add shower faucets in (e) two bathrooms on 2nd floor. replace (e) ceiling sheetrock & install fluorescent light fixtures on basement level. n/a maher ordinanceDetails
revision to pa #2013.1231.5376 & 2014.0619.8915 - remodel (e) master bathroom & replace (e) bathtubs & add shower faucets in (e) two bathrooms on 2nd floor. replace (e) ceiling sheetrock & install fluorescent light fixtures on basement level. n/a maher ordinance | $20,000 |
| Jun 19, 2014 | Completed final sign-off Nov 2016 | 2025 Jackson St | revision appl. # 2013.12.31.5376. replace (e) kitchen cabinet on first floor. replace two (e) 32"x48 window with two 32"x24" window not visible from street. retile two bathrooms on second floor. maher ordinance #155-13 n/a.Details
revision appl. # 2013.12.31.5376. replace (e) kitchen cabinet on first floor. replace two (e) 32"x48 window with two 32"x24" window not visible from street. retile two bathrooms on second floor. maher ordinance #155-13 n/a. | $10,000 |
| Apr 3, 2014 | Completed final sign-off Nov 2016 | 2025 Jackson St | remodel (e) full bath on second floor. remove all (e) tile, bathtub, toilet, shower and sink, replace with new one. close one door to the bathroom. upgrade electric lighting in bath and master bedroom n/a maher ordinance # 155.13.Details
remodel (e) full bath on second floor. remove all (e) tile, bathtub, toilet, shower and sink, replace with new one. close one door to the bathroom. upgrade electric lighting in bath and master bedroom n/a maher ordinance # 155.13. | $8,000 |
| Mar 25, 2014 | Never finaled issued Mar 2014, no final | 87 Beaver St | remove existing shingle roof and replace 1/2" cdx plywood, and install new shingle approx 500 sq ft. class b roofing.Details
remove existing shingle roof and replace 1/2" cdx plywood, and install new shingle approx 500 sq ft. class b roofing. | $4,000 |
| Dec 31, 2013 | Completed final sign-off Nov 2016 | 2025 Jackson St | remodel e full bath to 1/2 bath, add wet bar and upgrade kitchen lighting on 1st fl. remove non convorming substandard interior stair. infill stairway opening on 2nd fl for new location of laundry, washer/dryerDetails
remodel e full bath to 1/2 bath, add wet bar and upgrade kitchen lighting on 1st fl. remove non convorming substandard interior stair. infill stairway opening on 2nd fl for new location of laundry, washer/dryer | $38,000 |
| Aug 28, 2013 | Completed final sign-off Mar 2014 | 885 San Jose Av | add 1/2 p.y. plywood on (e) south side of the building.Details
add 1/2 p.y. plywood on (e) south side of the building. | $4,000 |
| Dec 7, 2012 | Completed final sign-off Jan 2013 | 1 Valdez Av | existing bathroom remodeling, new bath tub, new sink, new toilet, and new electric. install sub -panel 80 amps, 7 ft x 8 ft.Details
existing bathroom remodeling, new bath tub, new sink, new toilet, and new electric. install sub -panel 80 amps, 7 ft x 8 ft. | $7,000 |