Tachtook Tacktook Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2012 to Jan 2026
- Last 24 months
- 2 permits filed
44 permits since 2000: 35 completed, 1 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 5 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2025 | In progress filed Feb 2025, not yet issued | 1346 41st Av | remove 2nd fl floor deck, stairs & post. remove partial wood fence to accomodate installation of 1 hour fire rated wall. install new 2nd fl deck, stairs & post. install new 1 hour fire rated wall.Details
remove 2nd fl floor deck, stairs & post. remove partial wood fence to accomodate installation of 1 hour fire rated wall. install new 2nd fl deck, stairs & post. install new 1 hour fire rated wall. | $15,000 |
| Jun 29, 2023 | Completed final sign-off Aug 2023 | 2286 27th Av | dry rot removal & replacement at exterior stairs in kind.Details
dry rot removal & replacement at exterior stairs in kind. | $35,000 |
| Sep 3, 2020 | Never finaled issued Feb 2021, no final | 255 Castro St | revision to pa #2020-0227-5644:(n) kitchen west wall to be move 25"(+-) more additional towards the stairway.Details
revision to pa #2020-0227-5644:(n) kitchen west wall to be move 25"(+-) more additional towards the stairway. | $1,000 |
| Mar 22, 2017 | Completed final sign-off Nov 2017 | 328 Joost Av | remove existing siding, ceramic tiling, water proof the stairs and place granite on steps. not visable to the street.Details
remove existing siding, ceramic tiling, water proof the stairs and place granite on steps. not visable to the street. | $3,000 |
| Mar 8, 2016 | Completed final sign-off May 2016 | 825 Newhall St | replace extg rear dry-rot stair in kind.Details
replace extg rear dry-rot stair in kind. | $7,500 |
| Sep 24, 2015 | Completed final sign-off May 2016 | 825 Newhall St | repair emergency stairs in back of bld "parking lot" steps and railing less than 50%Details
repair emergency stairs in back of bld "parking lot" steps and railing less than 50% | $2,000 |
| Dec 31, 2013 | Completed final sign-off Nov 2016 | 2025 Jackson St | remodel e full bath to 1/2 bath, add wet bar and upgrade kitchen lighting on 1st fl. remove non convorming substandard interior stair. infill stairway opening on 2nd fl for new location of laundry, washer/dryerDetails
remodel e full bath to 1/2 bath, add wet bar and upgrade kitchen lighting on 1st fl. remove non convorming substandard interior stair. infill stairway opening on 2nd fl for new location of laundry, washer/dryer | $38,000 |