Back to kitchen remodel contractors
Tachtook Tacktook Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2012 to Jan 2026
- Last 24 months
- 2 permits filed
44 permits since 2000: 35 completed, 1 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 never finaled. Typically 0 days from filing to permit and 103 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2026 | Completed final sign-off Feb 2026 | 2965 Sacramento St | apt 305: kitchen and bathroom remodel in kind. new cabinets, electrical, lights, faucet, stove, dishwasher, replace tub for tub, vanity, new fan, faucet. install 3 electric wall heaters, new subpanel. replace 4 windows non street facing.Details
apt 305: kitchen and bathroom remodel in kind. new cabinets, electrical, lights, faucet, stove, dishwasher, replace tub for tub, vanity, new fan, faucet. install 3 electric wall heaters, new subpanel. replace 4 windows non street facing. | $20,000 |
| Feb 27, 2023 | Completed final sign-off Apr 2023 | 2965 Sacramento St | unit# 303: bathrm remodel in-kind: replace toilet,tub,vanity fan and heat, kitchen remodel in-kind: cabinets,counter and hood, dishwasher, install electric sub panel, 11-recessed lights, replace sockets, 2-wall heaters, replace 4 vinyl windows in rear in-kind, replace hardwood flrs and paint in kindDetails
unit# 303: bathrm remodel in-kind: replace toilet,tub,vanity fan and heat, kitchen remodel in-kind: cabinets,counter and hood, dishwasher, install electric sub panel, 11-recessed lights, replace sockets, 2-wall heaters, replace 4 vinyl windows in rear in-kind, replace hardwood flrs and paint in kind | $32,000 |
| Jul 8, 2022 | Never finaled issued Jul 2022, no final | 331 Monterey Bl | replace kitchen cabinets and kitchen counter in kind. no change to wall layout or floor layout.Details
replace kitchen cabinets and kitchen counter in kind. no change to wall layout or floor layout. | $6,000 |
| May 27, 2021 | Completed final sign-off Aug 2021 | 1735 39th Av | replace kitchen cabinets and replace faucet in-kind.remodel bathroom, r/r tub, faucet and vanity in-kind. replace 100amp electrical subpanel. replacement of roof shingles only (less than 20%)Details
replace kitchen cabinets and replace faucet in-kind.remodel bathroom, r/r tub, faucet and vanity in-kind. replace 100amp electrical subpanel. replacement of roof shingles only (less than 20%) | $30,000 |
| Oct 30, 2020 | Completed final sign-off Apr 2021 | 251 Castro St | kitchen remodel in-kind. replace e cabinets, countertops, sink, including plumbing fixtures. remove e wood burning fire place and cover opening. install pantry cabinet. install 6 n recessed lights in kitchen. replace electrical panel from 60 amps to 100 amps sub panel.Details
kitchen remodel in-kind. replace e cabinets, countertops, sink, including plumbing fixtures. remove e wood burning fire place and cover opening. install pantry cabinet. install 6 n recessed lights in kitchen. replace electrical panel from 60 amps to 100 amps sub panel. | $20,000 |
| Sep 3, 2020 | Never finaled issued Feb 2021, no final | 255 Castro St | revision to pa #2020-0227-5644:(n) kitchen west wall to be move 25"(+-) more additional towards the stairway.Details
revision to pa #2020-0227-5644:(n) kitchen west wall to be move 25"(+-) more additional towards the stairway. | $1,000 |
| Oct 18, 2019 | Completed final sign-off May 2021 | 255 Castro St | renovate 2 toilet and bath including plmg & elec. renovate kitchen, including plmg & electrical. remove extg interior walls to create closet and shelving and to extend kitchen area.Details
renovate 2 toilet and bath including plmg & elec. renovate kitchen, including plmg & electrical. remove extg interior walls to create closet and shelving and to extend kitchen area. | $40,000 |
| Aug 15, 2019 | Completed final sign-off Nov 2019 | 1575 Innes Av | remodeling kitchen, one bathroom, and one half bathroom. kitchen: remove existing cabinet and replace with new. install new electrical outlets, redcessed lighting. bathroom: install gfi and lighting.Details
remodeling kitchen, one bathroom, and one half bathroom. kitchen: remove existing cabinet and replace with new. install new electrical outlets, redcessed lighting. bathroom: install gfi and lighting. | $35,000 |
| Jul 27, 2017 | Completed final sign-off Nov 2017 | 652 Clarendon Av | remove existing kitchen cabinets, replace with new one and new counter and new sink and faucet. no other work.Details
remove existing kitchen cabinets, replace with new one and new counter and new sink and faucet. no other work. | $7,500 |
| Jun 19, 2014 | Completed final sign-off Nov 2016 | 2025 Jackson St | revision appl. # 2013.12.31.5376. replace (e) kitchen cabinet on first floor. replace two (e) 32"x48 window with two 32"x24" window not visible from street. retile two bathrooms on second floor. maher ordinance #155-13 n/a.Details
revision appl. # 2013.12.31.5376. replace (e) kitchen cabinet on first floor. replace two (e) 32"x48 window with two 32"x24" window not visible from street. retile two bathrooms on second floor. maher ordinance #155-13 n/a. | $10,000 |
| Dec 31, 2013 | Completed final sign-off Nov 2016 | 2025 Jackson St | remodel e full bath to 1/2 bath, add wet bar and upgrade kitchen lighting on 1st fl. remove non convorming substandard interior stair. infill stairway opening on 2nd fl for new location of laundry, washer/dryerDetails
remodel e full bath to 1/2 bath, add wet bar and upgrade kitchen lighting on 1st fl. remove non convorming substandard interior stair. infill stairway opening on 2nd fl for new location of laundry, washer/dryer | $38,000 |