Back to bathroom remodel contractors
Tachtook Tacktook Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2012 to Jan 2026
- Last 24 months
- 2 permits filed
44 permits since 2000: 35 completed, 1 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 14 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2026 | Completed final sign-off Feb 2026 | 2965 Sacramento St | apt 305: kitchen and bathroom remodel in kind. new cabinets, electrical, lights, faucet, stove, dishwasher, replace tub for tub, vanity, new fan, faucet. install 3 electric wall heaters, new subpanel. replace 4 windows non street facing.Details
apt 305: kitchen and bathroom remodel in kind. new cabinets, electrical, lights, faucet, stove, dishwasher, replace tub for tub, vanity, new fan, faucet. install 3 electric wall heaters, new subpanel. replace 4 windows non street facing. | $20,000 |
| Aug 19, 2022 | Completed final sign-off Oct 2022 | 108 22nd Av | toliet and shower remodel in kind: remove and replace toilet, shower, lavatory, fan, flooring tiles, switches, gfci and 2nd floor. remodeling 1/2 bath, remove existing toilet, fan, switches, gfci and replace in kind 2nd floor. install electrical subpanwl 2nd floor.Details
toliet and shower remodel in kind: remove and replace toilet, shower, lavatory, fan, flooring tiles, switches, gfci and 2nd floor. remodeling 1/2 bath, remove existing toilet, fan, switches, gfci and replace in kind 2nd floor. install electrical subpanwl 2nd floor. | $12,000 |
| May 27, 2022 | Never finaled issued May 2022, no final | 924 Florida St | bath remodel, in kind. remove and replace toilet, shower, lavatory, fan and flooring tiles. install (3) recessed lights.Details
bath remodel, in kind. remove and replace toilet, shower, lavatory, fan and flooring tiles. install (3) recessed lights. | $9,000 |
| May 3, 2022 | Completed final sign-off Sep 2022 | 88 King St | unit #1121: two bathroom remodel. remove and relocate in-kind tile, floor, vanity and toilet in master and guest bathroom, remove bath tub and replace standing shower in master bathroomDetails
unit #1121: two bathroom remodel. remove and relocate in-kind tile, floor, vanity and toilet in master and guest bathroom, remove bath tub and replace standing shower in master bathroom | $22,000 |
| May 27, 2021 | Completed final sign-off Aug 2021 | 1735 39th Av | replace kitchen cabinets and replace faucet in-kind.remodel bathroom, r/r tub, faucet and vanity in-kind. replace 100amp electrical subpanel. replacement of roof shingles only (less than 20%)Details
replace kitchen cabinets and replace faucet in-kind.remodel bathroom, r/r tub, faucet and vanity in-kind. replace 100amp electrical subpanel. replacement of roof shingles only (less than 20%) | $30,000 |
| Feb 27, 2020 | Completed final sign-off May 2021 | 255 Castro St | convert full bath into half bath, install pantry. install new full bath. install new electrical recessed lights and replace per plan. revision to pa #2019 1018 4965Details
convert full bath into half bath, install pantry. install new full bath. install new electrical recessed lights and replace per plan. revision to pa #2019 1018 4965 | $14,000 |
| Oct 18, 2019 | Completed final sign-off May 2021 | 255 Castro St | renovate 2 toilet and bath including plmg & elec. renovate kitchen, including plmg & electrical. remove extg interior walls to create closet and shelving and to extend kitchen area.Details
renovate 2 toilet and bath including plmg & elec. renovate kitchen, including plmg & electrical. remove extg interior walls to create closet and shelving and to extend kitchen area. | $40,000 |
| Aug 15, 2019 | Completed final sign-off Nov 2019 | 1575 Innes Av | remodeling kitchen, one bathroom, and one half bathroom. kitchen: remove existing cabinet and replace with new. install new electrical outlets, redcessed lighting. bathroom: install gfi and lighting.Details
remodeling kitchen, one bathroom, and one half bathroom. kitchen: remove existing cabinet and replace with new. install new electrical outlets, redcessed lighting. bathroom: install gfi and lighting. | $35,000 |
| Jun 17, 2019 | Completed final sign-off Aug 2019 | 521 Hill St | renovate toilet and bathroom in the first floor (includes remodel of bathtub, toilet, lavatory, and tiles. renovate toilet and bath in kind at the second floor (same as the first floor). includes plumbing and electrical. in-kindDetails
renovate toilet and bathroom in the first floor (includes remodel of bathtub, toilet, lavatory, and tiles. renovate toilet and bath in kind at the second floor (same as the first floor). includes plumbing and electrical. in-kind | $20,000 |
| Jul 2, 2018 | Completed final sign-off Apr 2019 | 331 Monterey Bl | additional 2 bedrooms and 1 toilet and bath, including electrical and plumbing/mechanical at basement.Details
additional 2 bedrooms and 1 toilet and bath, including electrical and plumbing/mechanical at basement. | $20,000 |
| Jun 18, 2018 | Completed final sign-off Nov 2018 | 947 Green St | unit 2: 2-1/2 bathroom remodel, master bath (e) shwer with steam, replace same locations; remove/replace toilets, fans, shower pan, tub, paint, flooring, replace outlets, lighting, lighting to comply w/cec150.0(k), 250, sq. ft., no change to exhaustDetails
unit 2: 2-1/2 bathroom remodel, master bath (e) shwer with steam, replace same locations; remove/replace toilets, fans, shower pan, tub, paint, flooring, replace outlets, lighting, lighting to comply w/cec150.0(k), 250, sq. ft., no change to exhaust | $30,000 |
| Sep 18, 2014 | Expired or cancelled expired Nov 2016 | 2025 Jackson St | revision to pa #2013.1231.5376 & 2014.0619.8915 - remodel (e) master bathroom & replace (e) bathtubs & add shower faucets in (e) two bathrooms on 2nd floor. replace (e) ceiling sheetrock & install fluorescent light fixtures on basement level. n/a maher ordinanceDetails
revision to pa #2013.1231.5376 & 2014.0619.8915 - remodel (e) master bathroom & replace (e) bathtubs & add shower faucets in (e) two bathrooms on 2nd floor. replace (e) ceiling sheetrock & install fluorescent light fixtures on basement level. n/a maher ordinance | $20,000 |
| Jun 19, 2014 | Completed final sign-off Nov 2016 | 2025 Jackson St | revision appl. # 2013.12.31.5376. replace (e) kitchen cabinet on first floor. replace two (e) 32"x48 window with two 32"x24" window not visible from street. retile two bathrooms on second floor. maher ordinance #155-13 n/a.Details
revision appl. # 2013.12.31.5376. replace (e) kitchen cabinet on first floor. replace two (e) 32"x48 window with two 32"x24" window not visible from street. retile two bathrooms on second floor. maher ordinance #155-13 n/a. | $10,000 |
| Apr 3, 2014 | Completed final sign-off Nov 2016 | 2025 Jackson St | remodel (e) full bath on second floor. remove all (e) tile, bathtub, toilet, shower and sink, replace with new one. close one door to the bathroom. upgrade electric lighting in bath and master bedroom n/a maher ordinance # 155.13.Details
remodel (e) full bath on second floor. remove all (e) tile, bathtub, toilet, shower and sink, replace with new one. close one door to the bathroom. upgrade electric lighting in bath and master bedroom n/a maher ordinance # 155.13. | $8,000 |
| Dec 31, 2013 | Completed final sign-off Nov 2016 | 2025 Jackson St | remodel e full bath to 1/2 bath, add wet bar and upgrade kitchen lighting on 1st fl. remove non convorming substandard interior stair. infill stairway opening on 2nd fl for new location of laundry, washer/dryerDetails
remodel e full bath to 1/2 bath, add wet bar and upgrade kitchen lighting on 1st fl. remove non convorming substandard interior stair. infill stairway opening on 2nd fl for new location of laundry, washer/dryer | $38,000 |
| Dec 7, 2012 | Completed final sign-off Jan 2013 | 1 Valdez Av | existing bathroom remodeling, new bath tub, new sink, new toilet, and new electric. install sub -panel 80 amps, 7 ft x 8 ft.Details
existing bathroom remodeling, new bath tub, new sink, new toilet, and new electric. install sub -panel 80 amps, 7 ft x 8 ft. | $7,000 |