Back to bathroom remodel contractors
Hathaway Dinwiddie Co.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 111 permits filed
2,989 permits since 2000: 2,253 completed, 59 in progress, 297 never finaled, 380 expired or cancelled.
Of the 297 never-finaled permits, 13 are 3 to 5 years old, 73 are 5 to 10 years old, 211 are over 10 years old. 19 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 18 completed, 3 never finaled, 3 expired or cancelled. Typically 20 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2024 | Completed final sign-off Oct 2025 | 1 Warriors Wy | space 22: new ti inclusive of partitions, ceilings, lighting, finishes, and millwork. new commercial kitchen w/ new equipment and plumbing for prep area, scullery, dry storage, walk-in fridge and freezer. new mech equipment to support kitchen, including type 1 and 2 exhaust. single occupant bathroomDetails
space 22: new ti inclusive of partitions, ceilings, lighting, finishes, and millwork. new commercial kitchen w/ new equipment and plumbing for prep area, scullery, dry storage, walk-in fridge and freezer. new mech equipment to support kitchen, including type 1 and 2 exhaust. single occupant bathroom | $705,820 |
| Oct 30, 2019 | Completed final sign-off Nov 2021 | 333 Ofarrell St | interior remodel of grand ballroom at 3rd fl and adjacent atrium/escalator space extending from gr fl lobby to 4th fl. public toilets at 1/2 level above ballroom to be upgraded to comply with current accessibility codes. 2 unisex bath within meeting room suites will be upgraded. scope includes newDetails
interior remodel of grand ballroom at 3rd fl and adjacent atrium/escalator space extending from gr fl lobby to 4th fl. public toilets at 1/2 level above ballroom to be upgraded to comply with current accessibility codes. 2 unisex bath within meeting room suites will be upgraded. scope includes new | $3,920,000 |
| May 23, 2018 | Completed final sign-off Oct 2020 | 650 Townsend St | core and shell improvement for construction of 1 hr atrium, boundry walls, doors, frames, non-doors, frames, non-door & window systems on floors 2,3 & 6. other work includes bathroom renovations, and associated selective demoDetails
core and shell improvement for construction of 1 hr atrium, boundry walls, doors, frames, non-doors, frames, non-door & window systems on floors 2,3 & 6. other work includes bathroom renovations, and associated selective demo | $453,600 |
| Feb 2, 2018 | Never finaled filed Feb 2018, never issued | 1055 Pine St | rehabilitation of units. add bathrooms & kitchens, new elevator in (e) shaft, new heating, new painting, flooring, new non-residential spaces for residents & management offices, new lighting (replacement), replace water heater.Details
rehabilitation of units. add bathrooms & kitchens, new elevator in (e) shaft, new heating, new painting, flooring, new non-residential spaces for residents & management offices, new lighting (replacement), replace water heater. | $2,000,000 |
| Jan 31, 2018 | Completed final sign-off Apr 2018 | 275 Battery St | 7th floor: remove and re-lamp and re install of 20 fixtures in hallway/lobby and 8 in the bathroom. furnish and install 2 new led fixtures in lobby. n/a for maherDetails
7th floor: remove and re-lamp and re install of 20 fixtures in hallway/lobby and 8 in the bathroom. furnish and install 2 new led fixtures in lobby. n/a for maher | $10,000 |
| Nov 2, 2016 | Completed final sign-off Jul 2018 | 5 Embarcadero Center | bathroom shower conversion in 78 rooms, selective wall & floor relocation, selective electrical relocation, convert 1 balcony suite to accessible suite. n/a ordinance #155-13Details
bathroom shower conversion in 78 rooms, selective wall & floor relocation, selective electrical relocation, convert 1 balcony suite to accessible suite. n/a ordinance #155-13 | $542,000 |
| Jul 20, 2016 | Completed final sign-off Aug 2016 | 860 Sutter St | replace gyp board ceiling in (e) 4th floor bathroom. new accessible door hardware at main entrance door to replace existing. maher naDetails
replace gyp board ceiling in (e) 4th floor bathroom. new accessible door hardware at main entrance door to replace existing. maher na | $1,000 |
| May 18, 2016 | Completed final sign-off Mar 2017 | 1 Maritime Pz | (n) non structural partitions, doors, glazing, lighting, millwork new bathroom and shower rooms. n/a ordinance #155-13Details
(n) non structural partitions, doors, glazing, lighting, millwork new bathroom and shower rooms. n/a ordinance #155-13 | $400,000 |
| Nov 6, 2014 | Never finaled issued Nov 2014, no final | 5 Embarcadero Center | remodel guest room 1637 consisting of alteration to guest bath to provide for accessibilityDetails
remodel guest room 1637 consisting of alteration to guest bath to provide for accessibility | $30,000 |
| Jun 24, 2014 | Completed final sign-off Aug 2015 | 5 Embarcadero Center | 15/f: selective demolitoin - partition, bathroom vnity, toilet, some finishes, light fixtures, new finishes, light fixtures, bathroom fixtures, floor & wall finishes for guessroom #1543. alteration of guessroom does not have to comply w/ h.c. accessibility because hotel count already complies.Details
15/f: selective demolitoin - partition, bathroom vnity, toilet, some finishes, light fixtures, new finishes, light fixtures, bathroom fixtures, floor & wall finishes for guessroom #1543. alteration of guessroom does not have to comply w/ h.c. accessibility because hotel count already complies. | $20,000 |
| Aug 8, 2013 | Expired or cancelled expired Feb 2017 | 200 Paul Av | 1st floor, mezzanine & roof top renovation & expansion of (e) entry/lobby. renovation of (e) bathrooms & facade. new driveway entry portal structure. replace (e) roof top screens. remove (e) secondary entry, exterior canopy structureDetails
1st floor, mezzanine & roof top renovation & expansion of (e) entry/lobby. renovation of (e) bathrooms & facade. new driveway entry portal structure. replace (e) roof top screens. remove (e) secondary entry, exterior canopy structure | $1,500,000 |
| Sep 19, 2012 | Completed final sign-off Jan 2014 | 650 California St | new parking & offices at basement levels. new disbaled access bathrooms. parking subject to pricing conditions of planning code section 155 (g) mep, fire alarm & sprinkler under separate permit.Details
new parking & offices at basement levels. new disbaled access bathrooms. parking subject to pricing conditions of planning code section 155 (g) mep, fire alarm & sprinkler under separate permit. | $1,228,659 |
| May 5, 2010 | Completed final sign-off May 2011 | 460 Townsend St | respond to n.o.v. for academy of arts.; and bathroom additional. life safety upgrades to address n.o.v's. structural details for stars under separte permits.Details
respond to n.o.v. for academy of arts.; and bathroom additional. life safety upgrades to address n.o.v's. structural details for stars under separte permits. | $135,000 |
| Mar 2, 2010 | Completed final sign-off Mar 2012 | 1355 Sansome St | 1st floor-tenant improvement-office, classrooms & bathrooms remodel; mep under separate permit life safety and sprinklers under sep permit. occupant load verification.Details
1st floor-tenant improvement-office, classrooms & bathrooms remodel; mep under separate permit life safety and sprinklers under sep permit. occupant load verification. | $1,350,000 |
| Mar 2, 2010 | Completed final sign-off Mar 2012 | 1355 Sansome St | 2nd floor-tenant improvement-office, classrooms & bathrooms remodel; mep under separate permit; life safety and sprinklers under sep permit. occupant load verification.Details
2nd floor-tenant improvement-office, classrooms & bathrooms remodel; mep under separate permit; life safety and sprinklers under sep permit. occupant load verification. | $1,350,000 |
| Aug 24, 2009 | Expired or cancelled expired Nov 2011 | 275 Battery St | certification of accessible path of travel under ab-056; street entry, elev. lobby, elevators, parking. bathrooms not included.Details
certification of accessible path of travel under ab-056; street entry, elev. lobby, elevators, parking. bathrooms not included. | |
| Jul 15, 2009 | Completed final sign-off Jan 2010 | 1916 Octavia St | gut bathroom to reapir dy-rot/ no structural work , replace contaminated wood members on walls and floor.Details
gut bathroom to reapir dy-rot/ no structural work , replace contaminated wood members on walls and floor. | $9,500 |
| Apr 15, 2008 | Completed final sign-off Sep 2008 | 135 Main St | t.o for new office of approx. 12,000 sq.ft. on the 15th floor inclduing new finishes, lighting,mechanical, electrical, bathroom upgrade for accessibility. fire sprinkler and alrm under separate permits,Details
t.o for new office of approx. 12,000 sq.ft. on the 15th floor inclduing new finishes, lighting,mechanical, electrical, bathroom upgrade for accessibility. fire sprinkler and alrm under separate permits, | $900,000 |
| Nov 29, 2007 | Completed final sign-off Aug 2008 | 1243 Scott St | kitchen and bath remodel no mep relocations. no arch relocation. in kind extg lights fixtures to remain. lower unitDetails
kitchen and bath remodel no mep relocations. no arch relocation. in kind extg lights fixtures to remain. lower unit | $14,500 |
| Aug 23, 2007 | Completed final sign-off Dec 2007 | 525 Market St | 31st floor ti - core bath for chapter 11b// create comfort rooms from existing tenant space // mep/ls/sp on sep appDetails
31st floor ti - core bath for chapter 11b// create comfort rooms from existing tenant space // mep/ls/sp on sep app | $75,000 |
| Aug 14, 2006 | Completed final sign-off Jul 2007 | 680 02nd St | (n) (non fire) stair, (n) partion walls, no work to building exterior offices etc, interior renovation of (e) building and addition of skylight, (n) ada bathroom, bathroom ventilation in seperate permit (mechancial).Details
(n) (non fire) stair, (n) partion walls, no work to building exterior offices etc, interior renovation of (e) building and addition of skylight, (n) ada bathroom, bathroom ventilation in seperate permit (mechancial). | $400,000 |
| Mar 22, 2006 | Expired or cancelled expired Nov 2006 | 5 Embarcadero Center | revision to pa#200508291455 per request of site inspector to show changes to bath rooms and closets, see delta one changes. fire protection on separate application.Details
revision to pa#200508291455 per request of site inspector to show changes to bath rooms and closets, see delta one changes. fire protection on separate application. | |
| Apr 30, 2004 | Never finaled issued Apr 2004, no final | 1916 Octavia St | remodel bathrooms in dormitory,repair/maintance,finish repalcement & fixture replaclement to (e)bathDetails
remodel bathrooms in dormitory,repair/maintance,finish repalcement & fixture replaclement to (e)bath | $25,000 |
| May 9, 2002 | Completed final sign-off Oct 2002 | 80 Henry St | remodel bath/add gas fireplace, relocare exist. entry doorDetails
remodel bath/add gas fireplace, relocare exist. entry door | $50,000 |