- 0 permits filed
204 permits since 2000: 150 completed, 32 never finaled, 22 expired or cancelled.
Of the 32 never-finaled permits, 32 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
15 stairs permits: 15 completed. Typically 21 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2015 | Completed final sign-off Mar 2016 | 1263 Mission St | 3rd flr: add connecting stair from mezz. to 3rd flr, add 2 hr rated mech shaft, add kitchen in basement, add new walls add skylight. maher - not req'dDetails
3rd flr: add connecting stair from mezz. to 3rd flr, add 2 hr rated mech shaft, add kitchen in basement, add new walls add skylight. maher - not req'd | $75,800 |
| Nov 18, 2013 | Completed final sign-off Mar 2016 | 424 09th St | (n) skylights (3) and (2) new window openings setback (approx 60') t.i interior.:replacement bathrooms at 2nd and 3rd floors. replacement stairs to 3rd floor mezzanine/strengthening. new walls at extg egress stairs at 2nd and 3rd floor only. mech under seperate permitDetails
(n) skylights (3) and (2) new window openings setback (approx 60') t.i interior.:replacement bathrooms at 2nd and 3rd floors. replacement stairs to 3rd floor mezzanine/strengthening. new walls at extg egress stairs at 2nd and 3rd floor only. mech under seperate permit | $85,300 |
| Oct 4, 2013 | Completed final sign-off Mar 2016 | 424 09th St | 1st floor t.i to 9e) building to replace (e) bathrooms to be ada accessible, new kitchenettes & upgrade the 2 (e) egress stairs with a new egress lobby to 9th st. mechanical under seperate permitDetails
1st floor t.i to 9e) building to replace (e) bathrooms to be ada accessible, new kitchenettes & upgrade the 2 (e) egress stairs with a new egress lobby to 9th st. mechanical under seperate permit | $336,500 |
| Aug 21, 2013 | Completed final sign-off Mar 2014 | 1420 Sutter St | change use from retail to office. tenant improvement of 2nd fl space and porton of gr fl. ada improvement to 2nd fl restrooms, kitchen , stairs. demo of ceiling and floor finishes of gr fl space. installation of new storefront in e opening at gr level, rear of building. mep sep permitDetails
change use from retail to office. tenant improvement of 2nd fl space and porton of gr fl. ada improvement to 2nd fl restrooms, kitchen , stairs. demo of ceiling and floor finishes of gr fl space. installation of new storefront in e opening at gr level, rear of building. mep sep permit | $350,000 |
| Mar 4, 2013 | Completed final sign-off Oct 2013 | 301 Geary St | revision to pa# 2013-0128-8873-replace (e) wood mezzanine & wood stairs with non combustible constructionDetails
revision to pa# 2013-0128-8873-replace (e) wood mezzanine & wood stairs with non combustible construction | $70,000 |
| Dec 13, 2012 | Completed final sign-off Jun 2013 | 2300 16th St | demolish (e) interior finishes. construct (n) interior demising wall. remodel (e) storefront. demo exterior trellis over stair. mep shall be deferred design-build submittal. shell work only.Details
demolish (e) interior finishes. construct (n) interior demising wall. remodel (e) storefront. demo exterior trellis over stair. mep shall be deferred design-build submittal. shell work only. | $38,000 |
| Nov 17, 2011 | Completed final sign-off Mar 2012 | 151 10th St | structural support for mechanical unit & new skylight on roof. new landing support & new staircase.Details
structural support for mechanical unit & new skylight on roof. new landing support & new staircase. | $7,000 |
| Sep 21, 2011 | Completed final sign-off Mar 2012 | 151 10th St | new interior partition and stairs. upgrade 4 bathrooms. new windows and skylight. lighting, electrical, lighting title 24 under separate permit.Details
new interior partition and stairs. upgrade 4 bathrooms. new windows and skylight. lighting, electrical, lighting title 24 under separate permit. | $450,000 |
| Mar 17, 2011 | Completed final sign-off Jan 2012 | 208 Utah St | demolitoin of portion of (e) floor structure, construction of (n) steel interconnecting stair.Details
demolitoin of portion of (e) floor structure, construction of (n) steel interconnecting stair. | $62,000 |
| Mar 15, 2011 | Completed final sign-off Jan 2012 | 208 Utah St | minor interior demo. new interior walls, doors.glazing, some ceilings, break areas, restrooms, computer assembling/data room. mep and sprinklers under separate permits. change in use from b to f-1 and m. create new exit passageway as noted on plans as part of exit discharge for stair-1.Details
minor interior demo. new interior walls, doors.glazing, some ceilings, break areas, restrooms, computer assembling/data room. mep and sprinklers under separate permits. change in use from b to f-1 and m. create new exit passageway as noted on plans as part of exit discharge for stair-1. | $430,000 |
| Oct 5, 2010 | Completed final sign-off Jan 2012 | 755 Sansome St | roof-new roof deck on (e) roof, concrete deck, handrails, guardrails, stair vestibile, screen. new waterproofing & roofing for use of building tenant (s) only; change of use from b to b, a & occupant load verification.Details
roof-new roof deck on (e) roof, concrete deck, handrails, guardrails, stair vestibile, screen. new waterproofing & roofing for use of building tenant (s) only; change of use from b to b, a & occupant load verification. | $144,157 |
| Sep 24, 2010 | Completed final sign-off May 2011 | 153 Kearny St | office ti on the 2nd and 4th floor. new floor finish, rated enclosures at stairs, renovated and new restrooms. new hvac system.life safty/sprnkr/fire alarm associated work shall be under seperate permit.Details
office ti on the 2nd and 4th floor. new floor finish, rated enclosures at stairs, renovated and new restrooms. new hvac system.life safty/sprnkr/fire alarm associated work shall be under seperate permit. | $250,000 |
| Apr 6, 2010 | Completed final sign-off Oct 2010 | 989 Market St | ground floor retail tenant improvement. install (n) freight elevator and stairs to basement. install (n) accessible wheelchair lift to (e) mezzanine. hvac & lighting under separate permit.Details
ground floor retail tenant improvement. install (n) freight elevator and stairs to basement. install (n) accessible wheelchair lift to (e) mezzanine. hvac & lighting under separate permit. | $450,000 |
| Oct 9, 2009 | Completed final sign-off Aug 2011 | 301 Grove St | first floor. new accessibvle entry. new accessible ramp and handrails and stairs. new accessible bathrm @ 2nd fl. new van accessible parking at (e) parking, relocation and installation of light fixtures.Details
first floor. new accessibvle entry. new accessible ramp and handrails and stairs. new accessible bathrm @ 2nd fl. new van accessible parking at (e) parking, relocation and installation of light fixtures. | $100,000 |
| Jun 12, 2009 | Completed final sign-off Sep 2009 | 660 03rd St | renovation of an opening in a masonry wall to accomodate new tenant entrance. adding aluminium glass store front entrance associated structural modification to the ground floor framing and ada modifications. new level landing, stair ramp and hand rails.Details
renovation of an opening in a masonry wall to accomodate new tenant entrance. adding aluminium glass store front entrance associated structural modification to the ground floor framing and ada modifications. new level landing, stair ramp and hand rails. | $80,000 |