Back to bathroom remodel contractors
Cci Com'l Constr & Improv**See 985808***
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Jun 2016
- Last 24 months
- 0 permits filed
204 permits since 2000: 150 completed, 32 never finaled, 22 expired or cancelled.
Of the 32 never-finaled permits, 32 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 11 completed, 1 expired or cancelled. Typically 6 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2014 | Expired or cancelled expired Mar 2018 | 644 Broadway | revision app#201312204760 to change location of the bathroom on a2.2 and mech shafter #2/minor mechanical changesDetails
revision app#201312204760 to change location of the bathroom on a2.2 and mech shafter #2/minor mechanical changes | |
| Feb 19, 2014 | Completed final sign-off Jan 2017 | 1263 Mission St | revision to app#201309237483. revision to t.i. work to basement and 1st floor, including new ada bathroom location, smaller mezzanine, reduced exterior work at front and rear facade.n/a for the maher ordinance #155-13 & n/a for the interim controls #428-13Details
revision to app#201309237483. revision to t.i. work to basement and 1st floor, including new ada bathroom location, smaller mezzanine, reduced exterior work at front and rear facade.n/a for the maher ordinance #155-13 & n/a for the interim controls #428-13 | |
| Nov 18, 2013 | Completed final sign-off Mar 2016 | 424 09th St | (n) skylights (3) and (2) new window openings setback (approx 60') t.i interior.:replacement bathrooms at 2nd and 3rd floors. replacement stairs to 3rd floor mezzanine/strengthening. new walls at extg egress stairs at 2nd and 3rd floor only. mech under seperate permitDetails
(n) skylights (3) and (2) new window openings setback (approx 60') t.i interior.:replacement bathrooms at 2nd and 3rd floors. replacement stairs to 3rd floor mezzanine/strengthening. new walls at extg egress stairs at 2nd and 3rd floor only. mech under seperate permit | $85,300 |
| Oct 10, 2013 | Completed final sign-off Jan 2014 | 3201 California St | interior remodel of 2nd floor office space including ada improvements to (e) bathrooms; mep under separate permitDetails
interior remodel of 2nd floor office space including ada improvements to (e) bathrooms; mep under separate permit | $350,000 |
| Oct 4, 2013 | Completed final sign-off Mar 2016 | 424 09th St | 1st floor t.i to 9e) building to replace (e) bathrooms to be ada accessible, new kitchenettes & upgrade the 2 (e) egress stairs with a new egress lobby to 9th st. mechanical under seperate permitDetails
1st floor t.i to 9e) building to replace (e) bathrooms to be ada accessible, new kitchenettes & upgrade the 2 (e) egress stairs with a new egress lobby to 9th st. mechanical under seperate permit | $336,500 |
| Sep 23, 2013 | Completed final sign-off Mar 2016 | 1263 Mission St | tenant improvement to basement & first floors, including new interior light wells to basement, replacement ada bathrooms, ada bulding access and new first floor mezzanine. front & rear facade revision (n) (replaced storefront), (n) rear (minna) entry & restored winds under separate permit.Details
tenant improvement to basement & first floors, including new interior light wells to basement, replacement ada bathrooms, ada bulding access and new first floor mezzanine. front & rear facade revision (n) (replaced storefront), (n) rear (minna) entry & restored winds under separate permit. | $85,300 |
| Apr 2, 2013 | Completed final sign-off Jun 2013 | 300 Brannan St | barrier removal to expand extg unisex bathroom on 3rd floor to upgrade to ada standards, removal and relocation of one concrete wall opening to create an acussible path to bathrooms finishes and lighting placement, addtion of exit signs. mep under separate permit.Details
barrier removal to expand extg unisex bathroom on 3rd floor to upgrade to ada standards, removal and relocation of one concrete wall opening to create an acussible path to bathrooms finishes and lighting placement, addtion of exit signs. mep under separate permit. | $59,360 |
| Sep 21, 2011 | Completed final sign-off Mar 2012 | 151 10th St | new interior partition and stairs. upgrade 4 bathrooms. new windows and skylight. lighting, electrical, lighting title 24 under separate permit.Details
new interior partition and stairs. upgrade 4 bathrooms. new windows and skylight. lighting, electrical, lighting title 24 under separate permit. | $450,000 |
| Feb 8, 2011 | Completed final sign-off May 2012 | 153 Kearny St | 2nd. & 4th. flr.: revision to app#201009241603.remove walls @ corridor, enlarge bathroom.Details
2nd. & 4th. flr.: revision to app#201009241603.remove walls @ corridor, enlarge bathroom. | |
| Oct 22, 2010 | Completed final sign-off Mar 2011 | 88 King St | interior remodel of unit 301. move (e) kitchen to (e) dining area. remodel (e) master bath and bedroom. replace (e) floortile w/ new wood floor. (n) electical and lighting at remodel locations onlyDetails
interior remodel of unit 301. move (e) kitchen to (e) dining area. remodel (e) master bath and bedroom. replace (e) floortile w/ new wood floor. (n) electical and lighting at remodel locations only | $80,000 |
| Jan 22, 2007 | Completed final sign-off Apr 2007 | 725 Pine St | demolition work-remove (e) appliances, bathroom fixtures, wall tiles, non rated and non structural partitions.Details
demolition work-remove (e) appliances, bathroom fixtures, wall tiles, non rated and non structural partitions. | $8,000 |
| Mar 17, 2003 | Completed final sign-off Sep 2003 | 180 Post St | compliance w/ notice of violation. front entrance, revise elevator,bathroom, add visual stripingDetails
compliance w/ notice of violation. front entrance, revise elevator,bathroom, add visual striping | $16,500 |