Back to kitchen remodel contractors
Black Mountain Development
- Based in
- Pleasanton
- On San Francisco permits
- Aug 2007 to Aug 2026
- Last 24 months
- 23 permits filed
195 permits since 2000: 148 completed, 16 in progress, 22 never finaled, 9 expired or cancelled.
Of the 22 never-finaled permits, 5 are 3 to 5 years old, 12 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
72 kitchen remodel permits: 55 completed, 7 in progress, 4 never finaled, 6 expired or cancelled. Typically 1 days from filing to permit and 318 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2026 | In progress issued Jul 2026 | 2850 Broadway | remodel kitchen & bathrooms, remodel courtyard & new landscaping. related electrical & plumbing will be performed. no change of use, no floor area added, no facade change.Details
remodel kitchen & bathrooms, remodel courtyard & new landscaping. related electrical & plumbing will be performed. no change of use, no floor area added, no facade change. | $185,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 3 Presidio Tr | remodel 5 baths, 1 powder room, 1 kitchen, everything in-kind, new finishes throughout. no structural work, no wall stud demolition or construction.Details
remodel 5 baths, 1 powder room, 1 kitchen, everything in-kind, new finishes throughout. no structural work, no wall stud demolition or construction. | $130,000 |
| Jan 13, 2026 | In progress issued Jan 2026 | 2850 Broadway | remodel in kind: 1 kitchen, 7 bathrooms, 2 half bathrooms.Details
remodel in kind: 1 kitchen, 7 bathrooms, 2 half bathrooms. | $100,000 |
| Jun 5, 2025 | In progress issued Jul 2025 | 2912 Pacific Av | remodel to (e) primary bathroom, closets, office, kitchen and butlers pantry. fixture and cabinetry improvements at baths, laundry and wet bar. redesign at living room & family room fireplace surround & topDetails
remodel to (e) primary bathroom, closets, office, kitchen and butlers pantry. fixture and cabinetry improvements at baths, laundry and wet bar. redesign at living room & family room fireplace surround & top | $120,000 |
| Mar 12, 2025 | In progress issued Mar 2025 | 2912 Pacific Av | remodel kitchen, 4 baths, 1 powder room in kind. replace stair banister on inside.Details
remodel kitchen, 4 baths, 1 powder room in kind. replace stair banister on inside. | $120,000 |
| Feb 13, 2025 | In progress issued Feb 2025 | 301 Mission St | gpha: removal of existing ceiling in kitchen and living room. removal of existing kitchen island, new construction of architctural partitions, finishes & fixtures for the addition of a primary bedroom suite, laundry, guest room & bath, new kitchen island, other cabinetry.Details
gpha: removal of existing ceiling in kitchen and living room. removal of existing kitchen island, new construction of architctural partitions, finishes & fixtures for the addition of a primary bedroom suite, laundry, guest room & bath, new kitchen island, other cabinetry. | $718,000 |
| Feb 12, 2025 | In progress issued Feb 2025 | 1750 Taylor St | unit #305: remodel primary bathroom and closet, remodel bath 2 and powder room, new cabinetry in bedroom 2 and entry, reconfigure kitchen including new appliances and finishes. new lighting throughout, new tile and waterproofing at balconies. replace in kind window wall on west bedroom and northDetails
unit #305: remodel primary bathroom and closet, remodel bath 2 and powder room, new cabinetry in bedroom 2 and entry, reconfigure kitchen including new appliances and finishes. new lighting throughout, new tile and waterproofing at balconies. replace in kind window wall on west bedroom and north | $100,000 |
| Oct 17, 2024 | Expired or cancelled cancelled Mar 2025 | 1750 Taylor St | unit 305: remodel (e) 1 kitchen & bathroom in-kind.Details
unit 305: remodel (e) 1 kitchen & bathroom in-kind. | $60,000 |
| Aug 28, 2024 | Completed final sign-off May 2025 | 1101 Green St | layout change for interior remodel of bathrooms, kitchen & closets. replace floorings, re-paint entire space, replace doors, replace kitchen appliances w/energy efficient modles, replace window shade. replace all lighting outlets & controls. revision to pa 202405142083Details
layout change for interior remodel of bathrooms, kitchen & closets. replace floorings, re-paint entire space, replace doors, replace kitchen appliances w/energy efficient modles, replace window shade. replace all lighting outlets & controls. revision to pa 202405142083 | $50,000 |
| Jun 18, 2024 | Completed final sign-off Feb 2025 | 188 Minna St | unit 27b: in kitchen: replace tile backsplash, replace garbage disposal, replace faucet, new cabinet pull hardward. new trim throughout unit. patch & paint drywall throughout. new flooring htroughout. no work in bathrooms.Details
unit 27b: in kitchen: replace tile backsplash, replace garbage disposal, replace faucet, new cabinet pull hardward. new trim throughout unit. patch & paint drywall throughout. new flooring htroughout. no work in bathrooms. | $60,000 |
| Jun 3, 2024 | Expired or cancelled cancelled Jun 2024 | 1750 Taylor St | #2302: remodel 1 kitchen i kind, remodel 2 bathroom in kind. new finishes thoughout.Details
#2302: remodel 1 kitchen i kind, remodel 2 bathroom in kind. new finishes thoughout. | $60,000 |
| May 14, 2024 | Completed final sign-off Sep 2025 | 1101 Green St | unit #1101: remodel in kind 1 kitchen, 2 baths. new finishes throughout. trim floors.Details
unit #1101: remodel in kind 1 kitchen, 2 baths. new finishes throughout. trim floors. | $50,000 |
| Apr 21, 2023 | Completed final sign-off Nov 2023 | 301 Mission St | (1) kitchen & (2) & half bathrooms remodel in-kind. (n) wood flooring throughout. (n) led lighting throughout.Details
(1) kitchen & (2) & half bathrooms remodel in-kind. (n) wood flooring throughout. (n) led lighting throughout. | $45,000 |
| Mar 15, 2023 | Completed final sign-off Feb 2025 | 188 Minna St | reface kitchen cabinets, (n) countertops, (n) dishwasher, new led lights in kitchen, 2 bathrooms, and one 1/2 bath. replace fan in 1/2 bathroom. new trim in 2 bathrooms and in sitting room. new window treatments.Details
reface kitchen cabinets, (n) countertops, (n) dishwasher, new led lights in kitchen, 2 bathrooms, and one 1/2 bath. replace fan in 1/2 bathroom. new trim in 2 bathrooms and in sitting room. new window treatments. | $40,000 |
| Mar 14, 2023 | Completed final sign-off Sep 2024 | 301 Mission St | modification from planning code sec 305.1 to provide temporary door / connection bet unit 48d & 48e w/o hearing under sec 317. temporary connecting door to be 45 min rated. non-structural remodel of kitchen, reconfigure 2 bedrooms, remove 1 bathroom & remodel 1 for cbc 11a accessDetails
modification from planning code sec 305.1 to provide temporary door / connection bet unit 48d & 48e w/o hearing under sec 317. temporary connecting door to be 45 min rated. non-structural remodel of kitchen, reconfigure 2 bedrooms, remove 1 bathroom & remodel 1 for cbc 11a access | $87,400 |
| Feb 28, 2023 | Expired or cancelled withdrawn Mar 2023 | 188 Minna St | remodel kitchen & 3 1/2 bath in kind. new finishes throughoutDetails
remodel kitchen & 3 1/2 bath in kind. new finishes throughout | $75,000 |
| Jun 27, 2022 | Completed final sign-off Sep 2023 | 1750 Taylor St | apt 605: remodel 3 bathrooms, in-kind, replace appliances in kitchen. new finishes throughout including floors & paint.Details
apt 605: remodel 3 bathrooms, in-kind, replace appliances in kitchen. new finishes throughout including floors & paint. | $60,000 |
| May 3, 2022 | Expired or cancelled withdrawn Jun 2022 | 706 Mission St | throughout to include new lighting & controls, new finishes throughout adjust hvac dust location to accomodate revised layout remodel kitchen.Details
throughout to include new lighting & controls, new finishes throughout adjust hvac dust location to accomodate revised layout remodel kitchen. | $400,000 |
| Mar 22, 2022 | Completed final sign-off Oct 2022 | 2121 Webster St | unit 603: remodel 2 bathrooms. 1 kitchen. in kind. new finishes throughout.Details
unit 603: remodel 2 bathrooms. 1 kitchen. in kind. new finishes throughout. | $40,000 |
| Feb 4, 2022 | Completed final sign-off Nov 2024 | 1080 Chestnut St | remodel 5 bath 1 powder room 1 kitchen in kind new finishes throughout. penthouse #eDetails
remodel 5 bath 1 powder room 1 kitchen in kind new finishes throughout. penthouse #e | $100,000 |
| May 4, 2021 | Expired or cancelled expired Oct 2025 | 2502 Broadway | remodel kitchen 6 bathrooms, exterior railing in rear all in kind.Details
remodel kitchen 6 bathrooms, exterior railing in rear all in kind. | $75,000 |
| Feb 8, 2021 | Completed final sign-off Jan 2022 | 201 Folsom St | unit #42a: 1 kitchen & 3 1/2 bath remodel in kind, no wall modification, no structural workDetails
unit #42a: 1 kitchen & 3 1/2 bath remodel in kind, no wall modification, no structural work | $40,000 |
| Jan 25, 2021 | Completed final sign-off Oct 2021 | 1750 Taylor St | unit 1701: new kitchen millwork/appliances. new master bathroom & fixturs and new living room celing - luminares. amend to (e) pa202007280867.Details
unit 1701: new kitchen millwork/appliances. new master bathroom & fixturs and new living room celing - luminares. amend to (e) pa202007280867. | $27,000 |
| Oct 2, 2020 | Completed final sign-off May 2021 | 1080 Chestnut St | kitchen and 1 bathroom remodel in-kind. new finish throughout. no change in layor/walls/opening.Details
kitchen and 1 bathroom remodel in-kind. new finish throughout. no change in layor/walls/opening. | $50,000 |
| Jul 14, 2020 | Completed final sign-off Sep 2021 | 188 Minna St | interior remodel, kitchen,baths & misc. living spaces of existing single story condo unit in multi-unit bldg, including associated electrical, plumbing & mechanical work. no structural work & no work to the exterior.Details
interior remodel, kitchen,baths & misc. living spaces of existing single story condo unit in multi-unit bldg, including associated electrical, plumbing & mechanical work. no structural work & no work to the exterior. | $47,000 |
| Jun 26, 2020 | Never finaled issued Jul 2020, no final | 765 Market St | (unit# 25d) remodel kitchen & bathroom in-kindDetails
(unit# 25d) remodel kitchen & bathroom in-kind | $20,000 |
| Oct 18, 2019 | Completed final sign-off Jan 2021 | 1250 Jones St | unit #1301: kitchen remodel new cabinets, appliances and fixtures. remodel master bath: remove tub, vanities and fixtures. new shower vanity and fixtures. remodel bath, remove tub, vanity and fixtures. new shower, vanity & fixtures. new carpet and paint through out, tile floors in bath. (1xk+2xb).Details
unit #1301: kitchen remodel new cabinets, appliances and fixtures. remodel master bath: remove tub, vanities and fixtures. new shower vanity and fixtures. remodel bath, remove tub, vanity and fixtures. new shower, vanity & fixtures. new carpet and paint through out, tile floors in bath. (1xk+2xb). | $300,000 |
| Apr 8, 2019 | Completed final sign-off May 2021 | 1750 Taylor St | #405: kitchen & bathroom (3.5) remodel; all fixtures and finishes to be replaced in kind and in place; all appliances to be replaced in kind and in place; all cabinetry and interior doors to be replaced in kind and in place. no structural work- no wall modification.Details
#405: kitchen & bathroom (3.5) remodel; all fixtures and finishes to be replaced in kind and in place; all appliances to be replaced in kind and in place; all cabinetry and interior doors to be replaced in kind and in place. no structural work- no wall modification. | $100,607 |
| Apr 5, 2019 | Completed final sign-off Mar 2020 | 765 Market St | remodel kitchen, bathrooms & floors. all new doors & casing. new lighting throughout unit.Details
remodel kitchen, bathrooms & floors. all new doors & casing. new lighting throughout unit. | $100,000 |
| Aug 27, 2018 | Completed final sign-off Apr 2021 | 2121 Webster St | gph 1: new interior buildout of an extg shell. relocating extg stair, structural changes, new residential elevator, new kitchen and bathrooms. sprinkler and mep system under seperate permit. n/a for maherDetails
gph 1: new interior buildout of an extg shell. relocating extg stair, structural changes, new residential elevator, new kitchen and bathrooms. sprinkler and mep system under seperate permit. n/a for maher | $1,800,000 |
| Mar 26, 2018 | Completed final sign-off Jun 2019 | 999 Green St | replace master bth, kitchen, guest bath. new electrical lighting, hardwood flooring. new paint throughout. replace extg a/c fan coil and condensor.Details
replace master bth, kitchen, guest bath. new electrical lighting, hardwood flooring. new paint throughout. replace extg a/c fan coil and condensor. | $760,000 |
| Sep 1, 2017 | Never finaled issued Sep 2017, no final | 301 Mission St | #49d-demo powder rm, guest bedroom, masterbed closet,mster bath,kitchen. rmv carpet,hardwd,shades,drywall. new paneling,casework, closet system mstr bdrm door hardware, mirrors,flring,capret,appliances,cntrtops,shades, stone countertops, new dry wall.Details
#49d-demo powder rm, guest bedroom, masterbed closet,mster bath,kitchen. rmv carpet,hardwd,shades,drywall. new paneling,casework, closet system mstr bdrm door hardware, mirrors,flring,capret,appliances,cntrtops,shades, stone countertops, new dry wall. | $180,000 |
| Aug 31, 2017 | Completed final sign-off Jun 2021 | 2411 Broadway | replace carpet with hardwood, flooring refinish existing hardwood, repaint int & ext, replace all fireplaces, mantels; 1st fl-add cabinets @ laundry, remove bar @ media room; 2nd fl-remodel powder room, library, pantry, new kitchen, countertops, r/r foyer floor tile, replace kitchen cabinets; 3rd flDetails
replace carpet with hardwood, flooring refinish existing hardwood, repaint int & ext, replace all fireplaces, mantels; 1st fl-add cabinets @ laundry, remove bar @ media room; 2nd fl-remodel powder room, library, pantry, new kitchen, countertops, r/r foyer floor tile, replace kitchen cabinets; 3rd fl | $575,000 |
| Jun 5, 2017 | Completed final sign-off Jun 2018 | 2363 Larkin St | unit 43 - kitchen -replace cabinets, counter tops, appliances, sink & faucet, hardwood floor; bath - replace shower, flooring with tile, fixture & fittings, vanity lighting; refinish hardwood flooring in living, dining, entry & hall, bedroom- bedroom closet. general - replace lighting in entry andDetails
unit 43 - kitchen -replace cabinets, counter tops, appliances, sink & faucet, hardwood floor; bath - replace shower, flooring with tile, fixture & fittings, vanity lighting; refinish hardwood flooring in living, dining, entry & hall, bedroom- bedroom closet. general - replace lighting in entry and | $250,000 |
| Jan 11, 2017 | Completed final sign-off Dec 2017 | 1070 Green St | remoel kitchen, 2 baths, new lighting throughout, new hardwood and tile flooring throughout, new shades, paintingDetails
remoel kitchen, 2 baths, new lighting throughout, new hardwood and tile flooring throughout, new shades, painting | $690,000 |
| Oct 23, 2015 | Completed final sign-off Jan 2016 | 301 Mission St | replace powder room vanity & sink. re-finish hardwood flrs. replace bedroom carpet. add 2 recessed lights to bathrm. new closet system in bedrm. add light to bedrm closet. add track lights to living rm (led) replace kitchen under cabinet light strip w/ led strip. repaint entire unit. replace lightDetails
replace powder room vanity & sink. re-finish hardwood flrs. replace bedroom carpet. add 2 recessed lights to bathrm. new closet system in bedrm. add light to bedrm closet. add track lights to living rm (led) replace kitchen under cabinet light strip w/ led strip. repaint entire unit. replace light | $55,000 |
| Jul 1, 2015 | Completed final sign-off Nov 2016 | 301 Mission St | remodel of entire unit, demo all ceiling sheetrock for new led light can through the unit. new cabinets at kitchen and bathroom vanities. remove & install hardwood flooring throughout. remodel bathroom to include removal of old tub and tub deck with new version. n/a ordinance #155-13;Details
remodel of entire unit, demo all ceiling sheetrock for new led light can through the unit. new cabinets at kitchen and bathroom vanities. remove & install hardwood flooring throughout. remodel bathroom to include removal of old tub and tub deck with new version. n/a ordinance #155-13; | $610,000 |
| Apr 28, 2015 | Completed final sign-off Mar 2016 | 1170 Sacramento St | interior remodel of bathrooms. replace flooring, repaint entire space, replace entry door, replace or refurbish heat register covers, replace kitchen appliances with energy ifficient models, replace guest closet doors and shelf and pole, replace window shades. n/a maher ord. # 155-13Details
interior remodel of bathrooms. replace flooring, repaint entire space, replace entry door, replace or refurbish heat register covers, replace kitchen appliances with energy ifficient models, replace guest closet doors and shelf and pole, replace window shades. n/a maher ord. # 155-13 | $135,000 |
| Jan 16, 2015 | Completed final sign-off Jul 2016 | 188 Minna St | unit 34a - remodel kitchen, living/dining area, master bath, master bedrm, den & throughout: opening kitchen to back hallway & living dining room area, remove & install millwork, recessed lighting, add dropped ceiling & lighting,relcoate vents, speakers, relcoate/add speaklers, install tile,floorsDetails
unit 34a - remodel kitchen, living/dining area, master bath, master bedrm, den & throughout: opening kitchen to back hallway & living dining room area, remove & install millwork, recessed lighting, add dropped ceiling & lighting,relcoate vents, speakers, relcoate/add speaklers, install tile,floors | $550,000 |
| Jul 24, 2014 | Never finaled issued Jul 2014, no final | 188 Minna St | unit 36c remodel. remove wall paper, repair dry wall and repaint throughout. add recess lights, trims, dimmer switches, remove kitchen backsplash replace with tile. remove glass at kitchen pass through. remove & replace vanity top, remove mirrors, add medicine cabinets, add shower head.Details
unit 36c remodel. remove wall paper, repair dry wall and repaint throughout. add recess lights, trims, dimmer switches, remove kitchen backsplash replace with tile. remove glass at kitchen pass through. remove & replace vanity top, remove mirrors, add medicine cabinets, add shower head. | $255,671 |
| Jan 29, 2014 | Completed final sign-off Mar 2015 | 1070 Green St | unit #1501 -remove/replace flooring, paint, adjust framing @ bedroom walls, remove dividing walls @ kitchen, add new lighting & electrical control- permit by other. adjust fire sprinklers, seperate permit by others. remove/replace plumbing fixtures in bathroom & kitchen- seperate permit by others.Details
unit #1501 -remove/replace flooring, paint, adjust framing @ bedroom walls, remove dividing walls @ kitchen, add new lighting & electrical control- permit by other. adjust fire sprinklers, seperate permit by others. remove/replace plumbing fixtures in bathroom & kitchen- seperate permit by others. | $100,000 |
| Sep 11, 2013 | Completed final sign-off Oct 2014 | 188 Minna St | unit #26f-interior renovation of (e) condo unit including: kitchen- remove high seperation wall, new countertops & backsplash. paint, plaster or wall covering all locations. change several (e) doors to pocket doors. new light fixtures, ceiling fans, cover plates, switches throughoutDetails
unit #26f-interior renovation of (e) condo unit including: kitchen- remove high seperation wall, new countertops & backsplash. paint, plaster or wall covering all locations. change several (e) doors to pocket doors. new light fixtures, ceiling fans, cover plates, switches throughout | $98,000 |
| Jun 5, 2013 | Completed final sign-off Sep 2013 | 188 Minna St | kitchen - remove high separation wall. new counter tops and backsplash, mirror walls at master bedroom, living room/dining room. repair entry hardwood flooring. paint, plaster, or wall covering all locations. new light fixtures, ceiling fan, cover plates and switches throughout. relocate plugs andioDetails
kitchen - remove high separation wall. new counter tops and backsplash, mirror walls at master bedroom, living room/dining room. repair entry hardwood flooring. paint, plaster, or wall covering all locations. new light fixtures, ceiling fan, cover plates and switches throughout. relocate plugs andio | $58,500 |
| Mar 6, 2013 | Expired or cancelled expired May 2022 | 188 Minna St | #27a:interior remodel of extg condo unit including. full remodel of kitchen & bathrooms, replace extg wood flooring, new millwork & new light fixture throughout. no work under this permit to base bldg structure. mep or fire alarm/sprinkler system, mep & sprinkler is design bld under seperate permitDetails
#27a:interior remodel of extg condo unit including. full remodel of kitchen & bathrooms, replace extg wood flooring, new millwork & new light fixture throughout. no work under this permit to base bldg structure. mep or fire alarm/sprinkler system, mep & sprinkler is design bld under seperate permit | $585,000 |
| Jan 23, 2013 | Completed final sign-off Sep 2013 | 188 Minna St | unit #25f - remove and replace: 2 bathrooms, hardwoos floor, kitchen counter. install:pocket doors, drop ceilings, soffit, recess lighting, cabinetry, medicine cabinets, mirrors, stone finishes. sprinklers separate permitDetails
unit #25f - remove and replace: 2 bathrooms, hardwoos floor, kitchen counter. install:pocket doors, drop ceilings, soffit, recess lighting, cabinetry, medicine cabinets, mirrors, stone finishes. sprinklers separate permit | $165,000 |
| Oct 4, 2012 | Completed final sign-off Apr 2013 | 301 Mission St | drop ceilings, throughout, add lighting, install new bathroom finishes & fixtures. install new kitchen cabinets, finishes & fixtures. demo study wall & add cabinets. carpet in bedrooms and paint throughout.Details
drop ceilings, throughout, add lighting, install new bathroom finishes & fixtures. install new kitchen cabinets, finishes & fixtures. demo study wall & add cabinets. carpet in bedrooms and paint throughout. | $150,000 |
| Aug 2, 2012 | Completed final sign-off Jan 2013 | 301 Mission St | open wall between living room and study for pass thru access. remove wall at dining rm and kitchen. replace countertop. add recessed lights in soffit over counter. move existing switches to adjoining walls. repaint as needed. field verify fa/sprinkler/co alarm coverage.swi 8/2/11.Details
open wall between living room and study for pass thru access. remove wall at dining rm and kitchen. replace countertop. add recessed lights in soffit over counter. move existing switches to adjoining walls. repaint as needed. field verify fa/sprinkler/co alarm coverage.swi 8/2/11. | $42,500 |
| Jun 22, 2012 | Completed final sign-off May 2013 | 1960 Grant Av | unit #17:remodel 1st floor and kitchen. remodel 2nd floor and master bath. upgrade electrical and plumbing. remodel stairwell going from lower floor to upper floor. add structural upgrades as noted on blue prints.replace existing in kind max ufactor 0.70(swinging doors).Details
unit #17:remodel 1st floor and kitchen. remodel 2nd floor and master bath. upgrade electrical and plumbing. remodel stairwell going from lower floor to upper floor. add structural upgrades as noted on blue prints.replace existing in kind max ufactor 0.70(swinging doors). | $900,000 |
| May 10, 2012 | Completed final sign-off Dec 2012 | 301 Mission St | 51st floor-revision to pa# 2012-0118-2456-revise bathroom into closet, change master bathroom layout, change bathroom 3 into ada compliant bathroom. revise kitchen layout to comply with adaDetails
51st floor-revision to pa# 2012-0118-2456-revise bathroom into closet, change master bathroom layout, change bathroom 3 into ada compliant bathroom. revise kitchen layout to comply with ada | $15,000 |
| Apr 6, 2012 | Completed final sign-off Jul 2012 | 301 Mission St | #40-b -remove extg lighting for replacement, remove (e) carpet, replace (e) ceiling fans, drop living room soffit to allow for new recessed lighting, add new lighting in living rm. kitchens, bathrms, hallways. remove fire safety system permits by others. paint, new hardwd @ bedrms, repair drywall.Details
#40-b -remove extg lighting for replacement, remove (e) carpet, replace (e) ceiling fans, drop living room soffit to allow for new recessed lighting, add new lighting in living rm. kitchens, bathrms, hallways. remove fire safety system permits by others. paint, new hardwd @ bedrms, repair drywall. | $80,000 |
| Jan 18, 2012 | Completed final sign-off Apr 2012 | 301 Mission St | demo walls in dining room, patch flooring & paint to match extg. replace stone at window seat to match extg, remove hall closet doors and powder room. add shower stall at closet location. add sconses at library, guest bedroom, add light at kitchen and master bedroom/bath & powder room.Details
demo walls in dining room, patch flooring & paint to match extg. replace stone at window seat to match extg, remove hall closet doors and powder room. add shower stall at closet location. add sconses at library, guest bedroom, add light at kitchen and master bedroom/bath & powder room. | $80,000 |
| Jan 18, 2012 | Completed final sign-off Feb 2013 | 301 Mission St | replace kitchen cabinets. remove walls in dining room/living room.drop ceiling in l/r area for recessed lights. level ceiling master bedroom. move door and sink powder room. replace hardwood flooring throughout. move sprinklers as needed from drop ceiling. replace kchn light fixtures.sprinkler,Details
replace kitchen cabinets. remove walls in dining room/living room.drop ceiling in l/r area for recessed lights. level ceiling master bedroom. move door and sink powder room. replace hardwood flooring throughout. move sprinklers as needed from drop ceiling. replace kchn light fixtures.sprinkler, | $250,000 |
| Dec 8, 2011 | Completed final sign-off Aug 2016 | 765 Market St | work @ unit# 32d. (ref to pa 201111028119s). demolition of 1 kitchen & addition of fire rated door to allow access between two units. two units merging into one (block & lot 3706/208 & 3706/207).Details
work @ unit# 32d. (ref to pa 201111028119s). demolition of 1 kitchen & addition of fire rated door to allow access between two units. two units merging into one (block & lot 3706/208 & 3706/207). | $2,050 |
| Nov 30, 2011 | Completed final sign-off May 2012 | 301 Mission St | remove and replace ceiling lighting throughout residence, remove all carpet, replace with ardwood. replace existing fans with high eff fan, drop living rm ceiling 4" for new canlights (13) install pendant lights above kitchen island, add soffit at bedroom for ceiling lights, add switching new lightDetails
remove and replace ceiling lighting throughout residence, remove all carpet, replace with ardwood. replace existing fans with high eff fan, drop living rm ceiling 4" for new canlights (13) install pendant lights above kitchen island, add soffit at bedroom for ceiling lights, add switching new light | $22,000 |
| Nov 2, 2011 | Completed final sign-off Aug 2016 | 765 Market St | work @ unit# 32c (ref pa #201112080307s). demolition of 1 kitchen & addition of fire rated door to allow access between units. two units merging into one.Details
work @ unit# 32c (ref pa #201112080307s). demolition of 1 kitchen & addition of fire rated door to allow access between units. two units merging into one. | $4,100 |
| Aug 30, 2011 | Completed final sign-off Jan 2013 | 301 Mission St | remove walls at living room and master closet,close 1 wall at master closet with new opening.new soffits, relocate fire sprinkler heads where necessary. new recessed lighting. some cabinetry in kchn, study,master bath. baseboards,sheet rock repairs as necessary. new stone in kitchen and baths.Details
remove walls at living room and master closet,close 1 wall at master closet with new opening.new soffits, relocate fire sprinkler heads where necessary. new recessed lighting. some cabinetry in kchn, study,master bath. baseboards,sheet rock repairs as necessary. new stone in kitchen and baths. | $387,000 |
| Jul 20, 2011 | Completed final sign-off Apr 2012 | 1200 California St | revision to application# 201106137979 moving sink @ kitchen, powder room change.Details
revision to application# 201106137979 moving sink @ kitchen, powder room change. | |
| Jul 15, 2011 | Completed final sign-off Sep 2011 | 301 Mission St | unit #50c - add additional lighting at bedrooms, kitchen, living room, bathrooms; change tub to shower at guest bedroom, add steam shower at master bath, add sink to laundry room, add hand held shower at master bath & guest bath throughout.Details
unit #50c - add additional lighting at bedrooms, kitchen, living room, bathrooms; change tub to shower at guest bedroom, add steam shower at master bath, add sink to laundry room, add hand held shower at master bath & guest bath throughout. | $95,000 |
| Jun 24, 2011 | Completed final sign-off Apr 2012 | 333 Bush St | unit 3802:remove wall between kitchen and living room.new kitchen cabs, re-route kitchen sink risers, add recessed lighting to all rooms. remove tub and replace with built in shower,new vanity and toilet.Details
unit 3802:remove wall between kitchen and living room.new kitchen cabs, re-route kitchen sink risers, add recessed lighting to all rooms. remove tub and replace with built in shower,new vanity and toilet. | $60,000 |
| Jun 13, 2011 | Completed final sign-off Apr 2012 | 1200 California St | interior remodel of unit# 19a on the 19th floor of kitchen, bathrooms, add 1/2 bathroom, new wood floor. new wall configuration, and change lightingDetails
interior remodel of unit# 19a on the 19th floor of kitchen, bathrooms, add 1/2 bathroom, new wood floor. new wall configuration, and change lighting | $150,000 |
| Apr 8, 2011 | Completed final sign-off Oct 2011 | 188 Minna St | unit #30e-remove & add some ceiling lighting, add wall conces, add gypsum above kitchen cabinets, add header at kitchen & entry. expand opening at master study. new cabinetry in kitchen & bathrooms. new flooring & paint. field verify if fire sprinklers are affected by partition work.Details
unit #30e-remove & add some ceiling lighting, add wall conces, add gypsum above kitchen cabinets, add header at kitchen & entry. expand opening at master study. new cabinetry in kitchen & bathrooms. new flooring & paint. field verify if fire sprinklers are affected by partition work. | $292,000 |
| Apr 5, 2011 | Never finaled issued Apr 2011, no final | 301 Mission St | drop ceilings 6" in living rm,bedrms for recess lighting, new hardwood flr, new cabinets & mill work thruout. replace tile & stone in kitchen,master bath, hall bath, guest bath.add energy efficant lighting, add insulation, relocate side wall sprinkler. fire sprinkler,l.s.,el,plmg on separate permitDetails
drop ceilings 6" in living rm,bedrms for recess lighting, new hardwood flr, new cabinets & mill work thruout. replace tile & stone in kitchen,master bath, hall bath, guest bath.add energy efficant lighting, add insulation, relocate side wall sprinkler. fire sprinkler,l.s.,el,plmg on separate permit | $235,000 |
| Jan 21, 2011 | Completed final sign-off Jul 2012 | 1750 Taylor St | remove drywall, trim, doors, floor coverings, cabinets/tops, bath glass,fireplace finishes,fixtures. replace with new walls,new kitchen and baths, exterior deck tile. windows sep permitDetails
remove drywall, trim, doors, floor coverings, cabinets/tops, bath glass,fireplace finishes,fixtures. replace with new walls,new kitchen and baths, exterior deck tile. windows sep permit | $615,800 |
| Feb 10, 2010 | Completed final sign-off Jul 2010 | 301 Main St | infinity unit# 37g - top floor unit. cabinetry additions and replacemen, remove and replace stone tile and plbg fixtures in guest bath, modify wall in hallway/foyer. add soffits in kitchen. add lightings and move hvac. modify sprinkler as necessary per code. shade valences all glazing, add flooring.Details
infinity unit# 37g - top floor unit. cabinetry additions and replacemen, remove and replace stone tile and plbg fixtures in guest bath, modify wall in hallway/foyer. add soffits in kitchen. add lightings and move hvac. modify sprinkler as necessary per code. shade valences all glazing, add flooring. | $33,500 |
| Jan 7, 2010 | Completed final sign-off Feb 2010 | 301 Mission St | remove non structural walls at ding to living rm and ding to foyer. hardwood flrs at mstr bdrm/closets,guest bdrm, hall closet. add pocket door @ lvg rm to office, kitchen to din rm, kitch to hallway. drop ceiling in lr,dr,mastr/guest bdrms for recessed lighting, loer 8 sprinkler heads at new dropDetails
remove non structural walls at ding to living rm and ding to foyer. hardwood flrs at mstr bdrm/closets,guest bdrm, hall closet. add pocket door @ lvg rm to office, kitchen to din rm, kitch to hallway. drop ceiling in lr,dr,mastr/guest bdrms for recessed lighting, loer 8 sprinkler heads at new drop | $97,200 |
| Sep 30, 2009 | Completed final sign-off Dec 2009 | 301 Mission St | unit 31c drop ceiling - 4" in living/dining area, library, guest & library, guest & master bedrs, lower 7 fire sprinklers for new drop ceiling, replace tile in master bath with slab. replace kitchen fl.add 37 recessed can lights.repair sheetrock, paint throught.fire sprinklers under separate permit.Details
unit 31c drop ceiling - 4" in living/dining area, library, guest & library, guest & master bedrs, lower 7 fire sprinklers for new drop ceiling, replace tile in master bath with slab. replace kitchen fl.add 37 recessed can lights.repair sheetrock, paint throught.fire sprinklers under separate permit. | $44,000 |
| Aug 26, 2009 | Completed final sign-off Mar 2010 | 301 Mission St | #53a -add pocket doors @ office; add steam generator to master bath; locate a/v equip; a/v,tv/wi-fi outlets to kitchen, livign rm, guest, ma. bedrms, master gate; add & relocate power plugs; add cirucits for steam unit & elect toilet in laster bath; repair sheetrock; replace light fixtures.Details
#53a -add pocket doors @ office; add steam generator to master bath; locate a/v equip; a/v,tv/wi-fi outlets to kitchen, livign rm, guest, ma. bedrms, master gate; add & relocate power plugs; add cirucits for steam unit & elect toilet in laster bath; repair sheetrock; replace light fixtures. | $44,000 |
| Aug 7, 2009 | Completed final sign-off Dec 2009 | 188 Minna St | add cabinets to kitchen & master; replace switches w/dimmers or motion/vacancy detectors; install perimeter track lighting, repair sheetrock, paint, low voltage adds for tv/wifi; replace plumbing fixures, no wall removal.Details
add cabinets to kitchen & master; replace switches w/dimmers or motion/vacancy detectors; install perimeter track lighting, repair sheetrock, paint, low voltage adds for tv/wifi; replace plumbing fixures, no wall removal. | $47,000 |
| May 26, 2009 | Completed final sign-off Oct 2010 | 188 Minna St | add cabinet at kitchen & bathrm, replace w dimmers or vacancy detelctors or motion detectors, add outlets for tv, change light fixtures locations, install perimeter track lighting in living rm & bedrms, repair sheetrock and paint, no wall removal.Details
add cabinet at kitchen & bathrm, replace w dimmers or vacancy detelctors or motion detectors, add outlets for tv, change light fixtures locations, install perimeter track lighting in living rm & bedrms, repair sheetrock and paint, no wall removal. | $55,120 |
| Feb 19, 2009 | Completed final sign-off Jun 2009 | 188 Minna St | #34e- upgrade kitchen cabinets & counter top. remove nonstructural wall at master bedroom. upgrade closets with systems. upgrade interior trim and plumbing fixtures.Details
#34e- upgrade kitchen cabinets & counter top. remove nonstructural wall at master bedroom. upgrade closets with systems. upgrade interior trim and plumbing fixtures. | $50,700 |
| Jan 6, 2009 | Completed final sign-off Mar 2010 | 301 Main St | #28g upgrade kitchen & bath cabients, interior doors, stone in guest & master bath, remove & replace hardwood floor, soffits in kitchen & living room for shades, plumbing fixtures. walls are non-fire rated, not load bearing or structural.Details
#28g upgrade kitchen & bath cabients, interior doors, stone in guest & master bath, remove & replace hardwood floor, soffits in kitchen & living room for shades, plumbing fixtures. walls are non-fire rated, not load bearing or structural. | $32,000 |
| Aug 9, 2007 | Completed final sign-off Oct 2008 | 188 Minna St | upgrade kitchen and bath cabinets interor door, stone work to slab, remove wall at 2nd floor, upgrade closet with system. open wall area soth of master bath for view to master bedroom and double door to master unit . upgrade interior trim to plumbing fixture through out.Details
upgrade kitchen and bath cabinets interor door, stone work to slab, remove wall at 2nd floor, upgrade closet with system. open wall area soth of master bath for view to master bedroom and double door to master unit . upgrade interior trim to plumbing fixture through out. | $32,000 |