Permit GraphShortlistSan Francisco building permits since 2000

Black Mountain Development

Contractor license
584024
State license record
Based in
Pleasanton
On San Francisco permits
Aug 2007 to Aug 2026
Last 24 months
23 permits filed

195 permits since 2000: 148 completed, 16 in progress, 22 never finaled, 9 expired or cancelled.

Of the 22 never-finaled permits, 5 are 3 to 5 years old, 12 are 5 to 10 years old, 5 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllPergola or trellis 1Deck 5Stairs 7Kitchen remodel 72Bathroom remodel 72

5 deck permits: 3 completed, 2 in progress. Typically 16 days from filing to permit and 532 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 20, 2026In progress
issued Apr 2026
2912 Pacific Avrevision to pa#202511240277: replace all windows at all levels, replace (e) garage door with (n). replace floor finish at 3rd floor deck and rear yard ptio. new operable gates at driveway, remove rear fountain and stone paving replacement at rear yard.
Details
Permit
202603208024
Status
issued
Filed
Mar 20, 2026
Permit issued
Apr 9, 2026
Declared cost
$15,000
Address
2912 Pacific Av

revision to pa#202511240277: replace all windows at all levels, replace (e) garage door with (n). replace floor finish at 3rd floor deck and rear yard ptio. new operable gates at driveway, remove rear fountain and stone paving replacement at rear yard.

Open the permit page

$15,000
Nov 24, 2025In progress
issued Dec 2025
2912 Pacific Avreplace and addition of guardrails, fencing, and gates at front and rear yards. replace guardrail at primary bedroom. remove decorative cornices and living room window surround at front facade. replace in kind doors and windows at 1st and 3rd floor. refinish patio surface at 3/f deck. new gate at..
Details
Permit
202511240277
Status
issued
Filed
Nov 24, 2025
Permit issued
Dec 12, 2025
Declared cost
$50,000
Address
2912 Pacific Av

replace and addition of guardrails, fencing, and gates at front and rear yards. replace guardrail at primary bedroom. remove decorative cornices and living room window surround at front facade. replace in kind doors and windows at 1st and 3rd floor. refinish patio surface at 3/f deck. new gate at..

Open the permit page

$50,000
Aug 12, 2019Completed
final sign-off May 2021
1750 Taylor Strev to pa# 201904087407 (unit# 405) demo of interior walls, doors, cabinetry, counters, flooring, and finishes as noted removal of appliances and fixtures as noted, removal and replacement of glazing and exterior siding doors as noted removal and replacement of exterior decking to complh with royal
Details
Permit
201908128474
Status
complete
Filed
Aug 12, 2019
Permit issued
Aug 28, 2019
Final sign-off
May 26, 2021
Declared cost
$378,814
Address
1750 Taylor St

rev to pa# 201904087407 (unit# 405) demo of interior walls, doors, cabinetry, counters, flooring, and finishes as noted removal of appliances and fixtures as noted, removal and replacement of glazing and exterior siding doors as noted removal and replacement of exterior decking to complh with royal

Open the permit page

$378,814
Jul 1, 2015Completed
final sign-off Nov 2016
301 Mission Stremodel of entire unit, demo all ceiling sheetrock for new led light can through the unit. new cabinets at kitchen and bathroom vanities. remove & install hardwood flooring throughout. remodel bathroom to include removal of old tub and tub deck with new version. n/a ordinance #155-13;
Details
Permit
201507010395
Status
complete
Filed
Jul 1, 2015
Permit issued
Jul 9, 2015
Final sign-off
Nov 1, 2016
Declared cost
$610,000
Address
301 Mission St

remodel of entire unit, demo all ceiling sheetrock for new led light can through the unit. new cabinets at kitchen and bathroom vanities. remove & install hardwood flooring throughout. remodel bathroom to include removal of old tub and tub deck with new version. n/a ordinance #155-13;

Open the permit page

$610,000
Jan 21, 2011Completed
final sign-off Jul 2012
1750 Taylor Stremove drywall, trim, doors, floor coverings, cabinets/tops, bath glass,fireplace finishes,fixtures. replace with new walls,new kitchen and baths, exterior deck tile. windows sep permit
Details
Permit
201101218799
Status
complete
Filed
Jan 21, 2011
Permit issued
Feb 1, 2011
Final sign-off
Jul 17, 2012
Declared cost
$615,800
Address
1750 Taylor St

remove drywall, trim, doors, floor coverings, cabinets/tops, bath glass,fireplace finishes,fixtures. replace with new walls,new kitchen and baths, exterior deck tile. windows sep permit

Open the permit page

$615,800