Arana Group, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Apr 2025
- Last 24 months
- 1 permit filed
87 permits since 2000: 80 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 8 completed, 1 never finaled. Typically 68 days from filing to permit and 258 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2022 | Completed final sign-off Jun 2023 | 214 Frida Kahlo Wy | revision to pa201902041952.rearrange (n) staircase from grd fl to 2nd fl. construct new vaulted ceiling at living, dinign rm kitchen. change bathtub to shower at grd fl. rearrange new bath at rear gnd fl. share location closet & bath at rear gnd fl. convert full to half bath at 2nd fl. new fireplaceDetails
revision to pa201902041952.rearrange (n) staircase from grd fl to 2nd fl. construct new vaulted ceiling at living, dinign rm kitchen. change bathtub to shower at grd fl. rearrange new bath at rear gnd fl. share location closet & bath at rear gnd fl. convert full to half bath at 2nd fl. new fireplace | $20,000 |
| Apr 6, 2022 | Completed final sign-off Oct 2022 | 101 Horne Av | revision to pa# 201912300885. revision to stair footing due to site conditions. stair mat slabs are now supported by ciph foundations rather than directly on the soil.Details
revision to pa# 201912300885. revision to stair footing due to site conditions. stair mat slabs are now supported by ciph foundations rather than directly on the soil. | $50,000 |
| Dec 30, 2019 | Completed final sign-off Oct 2022 | 101 Horne Av | convert (e) auditorium to art gallery.life & safety upgrades, (n) exterior egress stair, exit signage (fire sprinkler riser & sprinklers deferred) for art gallery.ada barrier removal (n) entry ramp & accessible multi-user all gender restroom. **maher applicable**Details
convert (e) auditorium to art gallery.life & safety upgrades, (n) exterior egress stair, exit signage (fire sprinkler riser & sprinklers deferred) for art gallery.ada barrier removal (n) entry ramp & accessible multi-user all gender restroom. **maher applicable** | $3,000,000 |
| Dec 18, 2019 | Completed final sign-off Aug 2020 | 201 Phelan Av | convert 536 sq ft in existing garage/storage to living space at ground floor. remove non-compliant interior stair, build new stair. remodel kitchen, install new cabinet & appliances. add new egress side door.Details
convert 536 sq ft in existing garage/storage to living space at ground floor. remove non-compliant interior stair, build new stair. remodel kitchen, install new cabinet & appliances. add new egress side door. | $80,000 |
| Feb 14, 2019 | Completed final sign-off Feb 2020 | 75 Laguna St | tenant improvement in shell space partitions, stairway, hvac, lighting, finishes, extend sprinkler and alarm systemDetails
tenant improvement in shell space partitions, stairway, hvac, lighting, finishes, extend sprinkler and alarm system | $2,500,000 |
| Aug 13, 2018 | Completed final sign-off Nov 2019 | 57 Westwood Dr | excavation of some parts of basement. new foundation and structural retrofit,new back door,landing, ext stairs.removal of walls for new hallway, (n) exit door at rear.(n) stairs at living room,(n)bathroom at ground level,remodel(e) bath at ground level.remodel kitchen at first floor.storage@ basemenDetails
excavation of some parts of basement. new foundation and structural retrofit,new back door,landing, ext stairs.removal of walls for new hallway, (n) exit door at rear.(n) stairs at living room,(n)bathroom at ground level,remodel(e) bath at ground level.remodel kitchen at first floor.storage@ basemen | $120,000 |
| Nov 23, 2015 | Completed final sign-off Apr 2020 | 733 Kearny St | renov of an(e)parking garage. upgrades to(e)mech,elec,plumb & lighting systems; ada upgrades; waterproofing improvements & repair of(e)structure; reolocation of interior prog areas; replace interior stairs; enclosure of exterior stairs & mech openings; infill of interior structural bay (floor slab)Details
renov of an(e)parking garage. upgrades to(e)mech,elec,plumb & lighting systems; ada upgrades; waterproofing improvements & repair of(e)structure; reolocation of interior prog areas; replace interior stairs; enclosure of exterior stairs & mech openings; infill of interior structural bay (floor slab) | $1,987,718 |
| Oct 2, 2014 | Never finaled issued Jul 2019, no final | 653 Bay St | additions & alterations to (e) 3 story 8 unit apt bldg. additions includes: raising the roof @ rear of bldg (gable @ front of bldg to remain)construction of roof decks on new flat roof. horizon addition of exterior exit stair@rear to grade. interior work includes remodel of (e) units & bldg out ofDetails
additions & alterations to (e) 3 story 8 unit apt bldg. additions includes: raising the roof @ rear of bldg (gable @ front of bldg to remain)construction of roof decks on new flat roof. horizon addition of exterior exit stair@rear to grade. interior work includes remodel of (e) units & bldg out of | $1,200,000 |
| Feb 10, 2009 | Completed final sign-off Mar 2009 | 1554 Jerrold Av | remove & install apprx 250 sq. ft. of stucco in front of house on stairs side. remove & install 19 sq. ft. of concrete floor on landing. prime & paint new stucco.Details
remove & install apprx 250 sq. ft. of stucco in front of house on stairs side. remove & install 19 sq. ft. of concrete floor on landing. prime & paint new stucco. | $4,000 |