Back to bathroom remodel contractors
Arana Group, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Apr 2025
- Last 24 months
- 1 permit filed
87 permits since 2000: 80 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
32 bathroom remodel permits: 29 completed, 3 never finaled. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2025 | Completed final sign-off Oct 2025 | 2567 San Bruno Av | replace existing unreinforced concrete wall with new timber wall. remove 2 windows and door per da checklist. add automatic door at front entry. add ada children's bathroom.Details
replace existing unreinforced concrete wall with new timber wall. remove 2 windows and door per da checklist. add automatic door at front entry. add ada children's bathroom. | $75,000 |
| Aug 26, 2022 | Completed final sign-off Jun 2023 | 214 Frida Kahlo Wy | revision to pa201902041952.rearrange (n) staircase from grd fl to 2nd fl. construct new vaulted ceiling at living, dinign rm kitchen. change bathtub to shower at grd fl. rearrange new bath at rear gnd fl. share location closet & bath at rear gnd fl. convert full to half bath at 2nd fl. new fireplaceDetails
revision to pa201902041952.rearrange (n) staircase from grd fl to 2nd fl. construct new vaulted ceiling at living, dinign rm kitchen. change bathtub to shower at grd fl. rearrange new bath at rear gnd fl. share location closet & bath at rear gnd fl. convert full to half bath at 2nd fl. new fireplace | $20,000 |
| May 2, 2019 | Completed final sign-off Nov 2019 | 57 Westwood Dr | revision #3 to pa 2018-0813-7136 & 201902153109 - new deck, new windows to the basement, new tub in bathroom in basement. new hvac furnace in the attic. elimination of laundry room. structural plan s2 ceiling beams in ground floorDetails
revision #3 to pa 2018-0813-7136 & 201902153109 - new deck, new windows to the basement, new tub in bathroom in basement. new hvac furnace in the attic. elimination of laundry room. structural plan s2 ceiling beams in ground floor | $6,000 |
| Feb 15, 2019 | Completed final sign-off Nov 2019 | 57 Westwood Dr | revision to pa 2018-0813-7136 replacement and new construction of windows in ground floor and basement; create family room, new bedroom and 2 new bathrooms in basement. front and side windws to be wood windows. other windows back and rear side to be replace by fiber or vynilDetails
revision to pa 2018-0813-7136 replacement and new construction of windows in ground floor and basement; create family room, new bedroom and 2 new bathrooms in basement. front and side windws to be wood windows. other windows back and rear side to be replace by fiber or vynil | |
| Feb 4, 2019 | Completed final sign-off Jun 2023 | 214 Phelan Av | two story horizontal addition at rear, (n) two bedrooms, one bathroom at uper floor, (n) two bedrooms, two bathroom, family room, laundry room at ground fl, remodel (e) kitchen & living room.Details
two story horizontal addition at rear, (n) two bedrooms, one bathroom at uper floor, (n) two bedrooms, two bathroom, family room, laundry room at ground fl, remodel (e) kitchen & living room. | $250,000 |
| Aug 13, 2018 | Completed final sign-off Nov 2019 | 57 Westwood Dr | excavation of some parts of basement. new foundation and structural retrofit,new back door,landing, ext stairs.removal of walls for new hallway, (n) exit door at rear.(n) stairs at living room,(n)bathroom at ground level,remodel(e) bath at ground level.remodel kitchen at first floor.storage@ basemenDetails
excavation of some parts of basement. new foundation and structural retrofit,new back door,landing, ext stairs.removal of walls for new hallway, (n) exit door at rear.(n) stairs at living room,(n)bathroom at ground level,remodel(e) bath at ground level.remodel kitchen at first floor.storage@ basemen | $120,000 |
| Jan 12, 2018 | Completed final sign-off Feb 2020 | 4439 03rd St | combining 2 (e) ground level office spaces into 1 space. by partially demoing a dividing wass & installing sliding doors creating (3) new offices inc power, data & lighing, new electrified strike at main entry for a door buzzer. providing ada upgrades in the bathroomsDetails
combining 2 (e) ground level office spaces into 1 space. by partially demoing a dividing wass & installing sliding doors creating (3) new offices inc power, data & lighing, new electrified strike at main entry for a door buzzer. providing ada upgrades in the bathrooms | $68,000 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 568 Natoma St | demo of kitchen, bathroom and hallway on 2nd floor and 1st floor. no alteration of wall, window and door. re-apply 1/2 plywood to expose wall area.Details
demo of kitchen, bathroom and hallway on 2nd floor and 1st floor. no alteration of wall, window and door. re-apply 1/2 plywood to expose wall area. | $1,500 |
| Nov 17, 2016 | Completed final sign-off Jan 2017 | 3044 Franklin St | remodeling of 1/2 bathroom(toilet and shower)Details
remodeling of 1/2 bathroom(toilet and shower) | $6,000 |
| Apr 17, 2015 | Completed final sign-off Oct 2015 | 610 Clipper St | #19- revision to 201503171152. revised layout at bathrooms, add one more bathroom to bedroom, all work is non structural only.Details
#19- revision to 201503171152. revised layout at bathrooms, add one more bathroom to bedroom, all work is non structural only. | |
| Apr 16, 2015 | Completed final sign-off Jun 2015 | 795 Pine St | unit #2: remodeling existing bathroom, no change on walls and opening.Details
unit #2: remodeling existing bathroom, no change on walls and opening. | $9,000 |
| Apr 8, 2015 | Never finaled issued Jun 2015, no final | 1870 Pacific Av | #604 -remodel of kit & bath. add w/dDetails
#604 -remodel of kit & bath. add w/d | $30,000 |
| Apr 2, 2015 | Completed final sign-off Jan 2016 | 795 Pine St | unit #62 - kitchen remodel & bath new w/d, remove non load bearing partitions @ living room and bedroom.Details
unit #62 - kitchen remodel & bath new w/d, remove non load bearing partitions @ living room and bedroom. | $25,000 |
| Mar 27, 2015 | Completed final sign-off Aug 2015 | 3419 Mission St | barrier removal. relocate existing bathroom.Details
barrier removal. relocate existing bathroom. | $9,000 |
| Mar 4, 2015 | Completed final sign-off Sep 2015 | 3605 20th St | #20- remodel unit 20 relocate water heater. add new washer/dryer. remodel bath and kitchen, relocate kitchen fixtures & cabinets. n/a ordinance #155-13Details
#20- remodel unit 20 relocate water heater. add new washer/dryer. remodel bath and kitchen, relocate kitchen fixtures & cabinets. n/a ordinance #155-13 | $25,000 |
| Mar 4, 2015 | Completed final sign-off Sep 2015 | 3605 20th St | remodel unit 17 relocate water heater. add new washer/dryer. remodel bath and kitchenDetails
remodel unit 17 relocate water heater. add new washer/dryer. remodel bath and kitchen | $25,000 |
| Nov 26, 2014 | Never finaled issued Dec 2014, no final | 1870 Pacific Av | #403- relocate kitchen & remodel kitchen & bathroom in kind, add new washer & dryer.Details
#403- relocate kitchen & remodel kitchen & bathroom in kind, add new washer & dryer. | $10,000 |
| Sep 29, 2014 | Completed final sign-off Aug 2015 | 3415 Mission St | relocate extg bathroom and build one new bathroom. remodel complete kitchen. install 5 ft sliding door on back bedroom. install 1 window and bulid 4 new closetsDetails
relocate extg bathroom and build one new bathroom. remodel complete kitchen. install 5 ft sliding door on back bedroom. install 1 window and bulid 4 new closets | $39,500 |
| Dec 28, 2011 | Completed final sign-off Feb 2012 | 1860 Washington St | remodeling of existing master bathroom na hallway bathroom, new sink, toilet, bath tub, shower, tile. high efficiency lighting or occupancy sensor (cec 150k). no change to exhaust system.Details
remodeling of existing master bathroom na hallway bathroom, new sink, toilet, bath tub, shower, tile. high efficiency lighting or occupancy sensor (cec 150k). no change to exhaust system. | $15,000 |
| Apr 17, 2009 | Completed final sign-off Jun 2009 | 40 Aptos Av | built 1/2 bathroom on basement/garage at right back corner, 8ft by 5ft wide with toilet & one sink. built next to 1/2 bathroom a new laundry closet (3'6" wide by 9ft long with hot/cold water, gas, drain & one small sinkDetails
built 1/2 bathroom on basement/garage at right back corner, 8ft by 5ft wide with toilet & one sink. built next to 1/2 bathroom a new laundry closet (3'6" wide by 9ft long with hot/cold water, gas, drain & one small sink | $5,000 |
| Feb 19, 2009 | Completed final sign-off Apr 2009 | 87 Christopher Dr | remodel of existing 1 bathroom. (no bath tub. only shower) to be the same configuration.Details
remodel of existing 1 bathroom. (no bath tub. only shower) to be the same configuration. | $11,200 |
| Sep 27, 2007 | Completed final sign-off Nov 2007 | 432 42nd Av | remodeleing bathroom (upstairs), replace toilet sink, tub, shower and tile, new electric and hot and cold water. no sewers. ( to use existing)Details
remodeleing bathroom (upstairs), replace toilet sink, tub, shower and tile, new electric and hot and cold water. no sewers. ( to use existing) | $6,000 |
| Jul 26, 2007 | Completed final sign-off Sep 2007 | 1934 Donner Av | remodel one bathroom, change tile, toilet, sink, bath tub (change bath tub to jacuzzi tub). 50% lighting shall be flourscentDetails
remodel one bathroom, change tile, toilet, sink, bath tub (change bath tub to jacuzzi tub). 50% lighting shall be flourscent | $7,000 |
| Jun 14, 2007 | Completed final sign-off Jul 2007 | 320 Alabama St | remove existing sprinkler head in bathroom closet.Details
remove existing sprinkler head in bathroom closet. | $150 |
| May 31, 2007 | Completed final sign-off Jul 2007 | 320 Alabama St | to add a shower on existing bathroom with a new light and switch.Details
to add a shower on existing bathroom with a new light and switch. | $3,500 |
| Apr 6, 2007 | Completed final sign-off Feb 2008 | 234 Precita Av | remodel back of garage into a bedroom, bathroom, closet, hallway and laundry closetDetails
remodel back of garage into a bedroom, bathroom, closet, hallway and laundry closet | $15,000 |
| Jun 28, 2006 | Completed final sign-off Sep 2006 | 1 Vesta St | kitchen remodel and bath. remodel including new electrical and hot and cold water. no structural workDetails
kitchen remodel and bath. remodel including new electrical and hot and cold water. no structural work | $20,000 |
| May 30, 2006 | Completed final sign-off Jul 2006 | 122 Arguello Bl | to build new bathroom (shower, toilet, sink) a closet and to move laundry area.Details
to build new bathroom (shower, toilet, sink) a closet and to move laundry area. | $25,000 |
| Feb 21, 2006 | Completed final sign-off Jun 2006 | 1560 Greenwich St | remodeling complete kitchen and bathroom, new electrical, new hot & cold water, top unit no structural workDetails
remodeling complete kitchen and bathroom, new electrical, new hot & cold water, top unit no structural work | $15,000 |
| Jan 3, 2006 | Completed final sign-off May 2006 | 69 Encanto Av | remodel kitchen and 2 baths. change cabinets, electrical, tile, plumbingDetails
remodel kitchen and 2 baths. change cabinets, electrical, tile, plumbing | $30,000 |
| May 19, 2005 | Completed final sign-off Nov 2005 | 1560 Greenwich St | build deck at ground w/ jacuzzi at rear yard. build deck (extend) at 2nd floor. build bathroom atDetails
build deck at ground w/ jacuzzi at rear yard. build deck (extend) at 2nd floor. build bathroom at | $30,000 |
| Oct 28, 2004 | Completed final sign-off Jan 2005 | 1860 Washington St | remodeling of a complete bathroom 5 ft by 8 ft 6 inches. replace tile, sink, bathtub. no structuralDetails
remodeling of a complete bathroom 5 ft by 8 ft 6 inches. replace tile, sink, bathtub. no structural | $12,000 |