Back to kitchen remodel contractors
Arana Group, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Apr 2025
- Last 24 months
- 1 permit filed
87 permits since 2000: 80 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 22 completed, 2 never finaled. Typically 10 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2022 | Completed final sign-off Jun 2023 | 214 Frida Kahlo Wy | revision to pa201902041952.rearrange (n) staircase from grd fl to 2nd fl. construct new vaulted ceiling at living, dinign rm kitchen. change bathtub to shower at grd fl. rearrange new bath at rear gnd fl. share location closet & bath at rear gnd fl. convert full to half bath at 2nd fl. new fireplaceDetails
revision to pa201902041952.rearrange (n) staircase from grd fl to 2nd fl. construct new vaulted ceiling at living, dinign rm kitchen. change bathtub to shower at grd fl. rearrange new bath at rear gnd fl. share location closet & bath at rear gnd fl. convert full to half bath at 2nd fl. new fireplace | $20,000 |
| Dec 18, 2019 | Completed final sign-off Aug 2020 | 201 Phelan Av | convert 536 sq ft in existing garage/storage to living space at ground floor. remove non-compliant interior stair, build new stair. remodel kitchen, install new cabinet & appliances. add new egress side door.Details
convert 536 sq ft in existing garage/storage to living space at ground floor. remove non-compliant interior stair, build new stair. remodel kitchen, install new cabinet & appliances. add new egress side door. | $80,000 |
| Feb 4, 2019 | Completed final sign-off Jun 2023 | 214 Phelan Av | two story horizontal addition at rear, (n) two bedrooms, one bathroom at uper floor, (n) two bedrooms, two bathroom, family room, laundry room at ground fl, remodel (e) kitchen & living room.Details
two story horizontal addition at rear, (n) two bedrooms, one bathroom at uper floor, (n) two bedrooms, two bathroom, family room, laundry room at ground fl, remodel (e) kitchen & living room. | $250,000 |
| Aug 13, 2018 | Completed final sign-off Nov 2019 | 57 Westwood Dr | excavation of some parts of basement. new foundation and structural retrofit,new back door,landing, ext stairs.removal of walls for new hallway, (n) exit door at rear.(n) stairs at living room,(n)bathroom at ground level,remodel(e) bath at ground level.remodel kitchen at first floor.storage@ basemenDetails
excavation of some parts of basement. new foundation and structural retrofit,new back door,landing, ext stairs.removal of walls for new hallway, (n) exit door at rear.(n) stairs at living room,(n)bathroom at ground level,remodel(e) bath at ground level.remodel kitchen at first floor.storage@ basemen | $120,000 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 568 Natoma St | demo of kitchen, bathroom and hallway on 2nd floor and 1st floor. no alteration of wall, window and door. re-apply 1/2 plywood to expose wall area.Details
demo of kitchen, bathroom and hallway on 2nd floor and 1st floor. no alteration of wall, window and door. re-apply 1/2 plywood to expose wall area. | $1,500 |
| Jun 29, 2016 | Completed final sign-off Dec 2016 | 2846 Folsom St | renovation of 2 kitchens, unit 2848 & unit 2846 are an adaptable kitchen, communication features and grab bar improvements per sf/sro ord misc improvements to entry stepsDetails
renovation of 2 kitchens, unit 2848 & unit 2846 are an adaptable kitchen, communication features and grab bar improvements per sf/sro ord misc improvements to entry steps | $20,000 |
| Sep 1, 2015 | Completed final sign-off Apr 2016 | 3415 Mission St | make (e) unit into 2 units. build new kitchen, open (3) outside doors.Details
make (e) unit into 2 units. build new kitchen, open (3) outside doors. | $12,000 |
| Apr 16, 2015 | Completed final sign-off Mar 2016 | 570 Ramsell St | remodel extg kitchen and remove 2 extg walls.Details
remodel extg kitchen and remove 2 extg walls. | $15,000 |
| Apr 2, 2015 | Completed final sign-off Jan 2016 | 795 Pine St | unit #62 - kitchen remodel & bath new w/d, remove non load bearing partitions @ living room and bedroom.Details
unit #62 - kitchen remodel & bath new w/d, remove non load bearing partitions @ living room and bedroom. | $25,000 |
| Mar 13, 2015 | Completed final sign-off Jun 2015 | 795 Pine St | units # 21,31,41, and 61. add wash and dryer.remodel kitchen in kind.Details
units # 21,31,41, and 61. add wash and dryer.remodel kitchen in kind. | $40,000 |
| Mar 4, 2015 | Completed final sign-off Sep 2015 | 3605 20th St | #20- remodel unit 20 relocate water heater. add new washer/dryer. remodel bath and kitchen, relocate kitchen fixtures & cabinets. n/a ordinance #155-13Details
#20- remodel unit 20 relocate water heater. add new washer/dryer. remodel bath and kitchen, relocate kitchen fixtures & cabinets. n/a ordinance #155-13 | $25,000 |
| Mar 4, 2015 | Completed final sign-off Sep 2015 | 3605 20th St | remodel unit 17 relocate water heater. add new washer/dryer. remodel bath and kitchenDetails
remodel unit 17 relocate water heater. add new washer/dryer. remodel bath and kitchen | $25,000 |
| Nov 26, 2014 | Never finaled issued Dec 2014, no final | 1870 Pacific Av | #403- relocate kitchen & remodel kitchen & bathroom in kind, add new washer & dryer.Details
#403- relocate kitchen & remodel kitchen & bathroom in kind, add new washer & dryer. | $10,000 |
| Sep 29, 2014 | Completed final sign-off Aug 2015 | 3415 Mission St | relocate extg bathroom and build one new bathroom. remodel complete kitchen. install 5 ft sliding door on back bedroom. install 1 window and bulid 4 new closetsDetails
relocate extg bathroom and build one new bathroom. remodel complete kitchen. install 5 ft sliding door on back bedroom. install 1 window and bulid 4 new closets | $39,500 |
| Aug 11, 2014 | Completed final sign-off Apr 2015 | 900 Mendell St | kitchen remodeling, new cabinets, electricity, hot & cold water, high efficacy lighting.Details
kitchen remodeling, new cabinets, electricity, hot & cold water, high efficacy lighting. | $21,000 |
| Apr 22, 2009 | Completed final sign-off Jul 2009 | 1504 Jerrold Av | remodel (e) 2nd flr bathrm & kitchen, plumbing fixtures will be @ same place. electrical by others. kitchen 110 sqft. bathrm 47 sqft.Details
remodel (e) 2nd flr bathrm & kitchen, plumbing fixtures will be @ same place. electrical by others. kitchen 110 sqft. bathrm 47 sqft. | $30,000 |
| Oct 25, 2007 | Completed final sign-off Jan 2008 | 40 Aptos Av | kitchen remodel. no structural work. 50% wattage high efficiency & switched seperately.Details
kitchen remodel. no structural work. 50% wattage high efficiency & switched seperately. | $15,000 |
| Apr 23, 2007 | Completed final sign-off Feb 2008 | 234 Precita Av | 10x12 back addition to kitchenDetails
10x12 back addition to kitchen | $16,000 |
| Nov 7, 2006 | Completed final sign-off Jan 2007 | 1860 Washington St | work @ apt# 105. kitchen remodel, new countertop, new cabinets, sink, lighting, appliances, 1/2 fluor lighting. no walls removed.Details
work @ apt# 105. kitchen remodel, new countertop, new cabinets, sink, lighting, appliances, 1/2 fluor lighting. no walls removed. | $12,000 |
| Jun 28, 2006 | Completed final sign-off Sep 2006 | 1 Vesta St | kitchen remodel and bath. remodel including new electrical and hot and cold water. no structural workDetails
kitchen remodel and bath. remodel including new electrical and hot and cold water. no structural work | $20,000 |
| Feb 21, 2006 | Completed final sign-off Jun 2006 | 1560 Greenwich St | remodeling complete kitchen and bathroom, new electrical, new hot & cold water, top unit no structural workDetails
remodeling complete kitchen and bathroom, new electrical, new hot & cold water, top unit no structural work | $15,000 |
| Jan 3, 2006 | Completed final sign-off May 2006 | 69 Encanto Av | remodel kitchen and 2 baths. change cabinets, electrical, tile, plumbingDetails
remodel kitchen and 2 baths. change cabinets, electrical, tile, plumbing | $30,000 |
| Mar 14, 2005 | Completed final sign-off Jun 2005 | 2012 Broadway | remodel complete kitchen w/new electricity, plumbing , sheetrock ,tile flr cabs & countertops. all wDetails
remodel complete kitchen w/new electricity, plumbing , sheetrock ,tile flr cabs & countertops. all w | $20,000 |
| Jul 16, 2004 | Completed final sign-off Jan 2005 | 1027 Russia Av | kitchen remodel and fire damage on left out side wall on proerty line 26'x10' approx.Details
kitchen remodel and fire damage on left out side wall on proerty line 26'x10' approx. | $40,000 |