Back to kitchen remodel contractors
Alsterlind Construction Inc.
- Based in
- Novato
- On San Francisco permits
- Jul 2006 to Feb 2026
- Last 24 months
- 7 permits filed
119 permits since 2000: 91 completed, 1 in progress, 20 never finaled, 7 expired or cancelled.
Of the 20 never-finaled permits, 1 is 3 to 5 years old, 8 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
26 kitchen remodel permits: 23 completed, 3 never finaled. Typically 40 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2025 | Completed final sign-off Jul 2025 | 451 Gough St | interior demolition of (e) partial height bar, millwork, finishes, some kitchen equipment ab017- deferred construction permitDetails
interior demolition of (e) partial height bar, millwork, finishes, some kitchen equipment ab017- deferred construction permit | $10,000 |
| Jan 27, 2025 | Completed final sign-off Jul 2025 | 451 Gough St | g/f t.i. restaurant renovation:n) non structural partition to enclose kitchen, millwork partition for private dining rm, bar reconfifuration. refinish walls & paint in dining & bathooms, replace e) fixtures. new kitchen equipement at bar & some in back of house. no exterior workDetails
g/f t.i. restaurant renovation:n) non structural partition to enclose kitchen, millwork partition for private dining rm, bar reconfifuration. refinish walls & paint in dining & bathooms, replace e) fixtures. new kitchen equipement at bar & some in back of house. no exterior work | $300,000 |
| Dec 21, 2022 | Completed final sign-off Aug 2023 | 701 Haight St | interior renovation of an (e) restaurant/bar. new millwork and furniture added, including new bars, booths, tables. bathrooms modified, and new interior partitions for the new kitchen area.Details
interior renovation of an (e) restaurant/bar. new millwork and furniture added, including new bars, booths, tables. bathrooms modified, and new interior partitions for the new kitchen area. | $150,000 |
| Oct 21, 2022 | Completed final sign-off Feb 2025 | 550 03rd St | removal of (e) non-bearing walls, new accessible kitchenette, unisex restrooms & shower.Details
removal of (e) non-bearing walls, new accessible kitchenette, unisex restrooms & shower. | $93,000 |
| Sep 15, 2022 | Completed final sign-off Jul 2023 | 2016 Fillmore St | prop h: (e) restaurant - light remodel of (e) kitchen and install (n) wine bar. new finishes and lighting throughout. structural work limited to dry rot mitigation.Details
prop h: (e) restaurant - light remodel of (e) kitchen and install (n) wine bar. new finishes and lighting throughout. structural work limited to dry rot mitigation. | $140,000 |
| Nov 7, 2019 | Completed final sign-off Jun 2020 | 393 West Portal Av | interior demo of existing kitchen equipment, finishes, fixtures, & wall where indicated for future commercial tiDetails
interior demo of existing kitchen equipment, finishes, fixtures, & wall where indicated for future commercial ti | $70,000 |
| Nov 7, 2019 | Completed final sign-off Nov 2020 | 393 West Portal Av | ti to (e) rest to accom a new full svc rest. work to incl n windows & n entry door, interior partitions, finishes, access upgrades to (e) unisex restrooms. rev to b.o.h. kitchen, mech, electrical, & plumbing to supp reconfigured space. operating as prev class b. co2, hood supp, sign under sep permitDetails
ti to (e) rest to accom a new full svc rest. work to incl n windows & n entry door, interior partitions, finishes, access upgrades to (e) unisex restrooms. rev to b.o.h. kitchen, mech, electrical, & plumbing to supp reconfigured space. operating as prev class b. co2, hood supp, sign under sep permit | $515,000 |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 2323 Van Ness Av | (e) restaurant kitchen remodel including replacing most equipment, but not moving walls, disabled access upgrade of main buiding entrance, disabled access upgrade of 2 ground floor restrooms including converting rooms to one all-gender disabled accessible and one all gender non accesibleDetails
(e) restaurant kitchen remodel including replacing most equipment, but not moving walls, disabled access upgrade of main buiding entrance, disabled access upgrade of 2 ground floor restrooms including converting rooms to one all-gender disabled accessible and one all gender non accesible | $62,800 |
| Nov 27, 2018 | Completed final sign-off Mar 2019 | 816 Folsom St | replace most existing food prep equipment in kind at e restaurant. repair e quarry tile fl and base and e frp wall covering in kitchen area per health walk through comments. no walls, windows, doors, lighting in scope. n/a for maher.Details
replace most existing food prep equipment in kind at e restaurant. repair e quarry tile fl and base and e frp wall covering in kitchen area per health walk through comments. no walls, windows, doors, lighting in scope. n/a for maher. | $100,000 |
| Jun 28, 2018 | Completed final sign-off May 2019 | 2535 03rd St | mep only. food production to include kitchen hood, plumbing, power plan. previous approved architectural appln #201803234453Details
mep only. food production to include kitchen hood, plumbing, power plan. previous approved architectural appln #201803234453 | $80,000 |
| Jun 14, 2018 | Completed final sign-off Nov 2018 | 1148 Mission St | minor tenant improvement to existing full service restaurant. work to include minor framing & finish alteration, installation of additional refrigeration equipment, kitchen to remain as is - no change of occupancy. maher naDetails
minor tenant improvement to existing full service restaurant. work to include minor framing & finish alteration, installation of additional refrigeration equipment, kitchen to remain as is - no change of occupancy. maher na | $30,000 |
| Nov 20, 2017 | Completed final sign-off Dec 2018 | 900 North Point St | interior remodel of (e) restaurant (n) finishes in dining room and bar. (e) kitchen, bar and restroom to remain. fire alarm & sprinklers under sep permit. maher naDetails
interior remodel of (e) restaurant (n) finishes in dining room and bar. (e) kitchen, bar and restroom to remain. fire alarm & sprinklers under sep permit. maher na | $500,000 |
| Sep 21, 2017 | Completed final sign-off Apr 2018 | 710 Montgomery St | no change in use, no envelope change. interior kitchen & dining room remodel, relocate bar, new finishes at (e) ada restroom. exterior paint. maher naDetails
no change in use, no envelope change. interior kitchen & dining room remodel, relocate bar, new finishes at (e) ada restroom. exterior paint. maher na | $100,000 |
| Aug 16, 2017 | Completed final sign-off Jan 2019 | 1030 Washington St | commercial space renovation for new cafe at gr fl. new kitchen, 2296 sq ft space.Details
commercial space renovation for new cafe at gr fl. new kitchen, 2296 sq ft space. | $20,500 |
| Mar 20, 2015 | Completed final sign-off Sep 2015 | 8 Mint Pz | renovation of an extg restaurant on the grnd fl. & mezn level of an extg 8 story bldg includes new non bearing walls, furniture, finishes & bar . minor demo of extg walls. extg ada restrm, stair elevator to remain under #200407269825. no work at exterior, kitchen,& bsmnt. n/a for maherDetails
renovation of an extg restaurant on the grnd fl. & mezn level of an extg 8 story bldg includes new non bearing walls, furniture, finishes & bar . minor demo of extg walls. extg ada restrm, stair elevator to remain under #200407269825. no work at exterior, kitchen,& bsmnt. n/a for maher | $120,000 |
| Jun 30, 2014 | Completed final sign-off May 2016 | 888 Brannan St | t.i. for (n) restaurant at ground floor. work includes (n) kitchen, partitions, fixtures, finishes, equipment, lighting, mechanical. no exterior work. fire protection under separate permit. maher n/aDetails
t.i. for (n) restaurant at ground floor. work includes (n) kitchen, partitions, fixtures, finishes, equipment, lighting, mechanical. no exterior work. fire protection under separate permit. maher n/a | $750,000 |
| Dec 11, 2013 | Completed final sign-off Dec 2014 | 1525 Fillmore St | g/f & 2/f- tenant improvement for one full service restaurant. work to include bathrooms, ada entry, kitchen/ bar, prep table at 2nd fl. (2) new stairs. change of use from m occupancy/ retail clothing store to a occupancy restaurant. bldg will be fully sprinkled/under separate permitDetails
g/f & 2/f- tenant improvement for one full service restaurant. work to include bathrooms, ada entry, kitchen/ bar, prep table at 2nd fl. (2) new stairs. change of use from m occupancy/ retail clothing store to a occupancy restaurant. bldg will be fully sprinkled/under separate permit | $350,000 |
| Mar 27, 2013 | Completed final sign-off Jan 2014 | 718 Irving St | build out kitchen, ada compliant bathroom, cosmetic alteration, removal of ceiling. change of use form retail to limited restaurant.Details
build out kitchen, ada compliant bathroom, cosmetic alteration, removal of ceiling. change of use form retail to limited restaurant. | $100,000 |
| Dec 7, 2012 | Completed final sign-off Jun 2013 | 1030 Hyde St | renovation of extg commercial space to include new store front curtain wall to replace extg, new commercial baking kitchen with type 2 hood, new equipment, food prep/service area. seating area, interior lighting, plmg and electrical work.Details
renovation of extg commercial space to include new store front curtain wall to replace extg, new commercial baking kitchen with type 2 hood, new equipment, food prep/service area. seating area, interior lighting, plmg and electrical work. | $134,000 |
| Nov 16, 2012 | Completed final sign-off Oct 2013 | 3228 Sacramento St | ti-new restaurant.incl interior & exterior to grd fl commercial space with no expansion of exist bldg envelope. kitchen, office space & storage spaces also incl. change of occupancy from m to a-2Details
ti-new restaurant.incl interior & exterior to grd fl commercial space with no expansion of exist bldg envelope. kitchen, office space & storage spaces also incl. change of occupancy from m to a-2 | $625,000 |
| Jun 29, 2012 | Completed final sign-off Aug 2013 | 198 Gough St | remodel approx 780 sq. ft. ground floor retail space to full service restaurant. include new kitchen, ada bathroom, eating area. include basement storage.Details
remodel approx 780 sq. ft. ground floor retail space to full service restaurant. include new kitchen, ada bathroom, eating area. include basement storage. | $150,000 |
| May 4, 2012 | Never finaled issued May 2012, no final | 1527 Fillmore St | new tenant improvement build out including new commercial kitchen. prep areas, seating area, interior lighting, plmbg, electrical work, new ada bathroom. ref app #201105025142 (s)Details
new tenant improvement build out including new commercial kitchen. prep areas, seating area, interior lighting, plmbg, electrical work, new ada bathroom. ref app #201105025142 (s) | $187,000 |
| Oct 12, 2011 | Completed final sign-off Mar 2012 | 135 04th St | fc07: tenant improvement of newly remodeled space into quick service retaurant/kiosk. work involves adding new commercial kitchen and new food prep service areaDetails
fc07: tenant improvement of newly remodeled space into quick service retaurant/kiosk. work involves adding new commercial kitchen and new food prep service area | $300,000 |
| Jun 21, 2011 | Never finaled issued Jul 2011, no final | 1529 Fillmore St | tenant improvement to renovate existing b restaurant. relocate existing ada bathrm, kitchen remodel, new exit corridor from restaurant. replace in kind storefront. no change of use, sep hvac, elc, plumb.Details
tenant improvement to renovate existing b restaurant. relocate existing ada bathrm, kitchen remodel, new exit corridor from restaurant. replace in kind storefront. no change of use, sep hvac, elc, plumb. | $150,000 |
| Mar 18, 2011 | Never finaled issued Apr 2011, no final | 1661 Tennessee St | 3rd floor. revision to app#201012237268. mechanical permit only on by others for catering kitchen. (type i hood) installation.Details
3rd floor. revision to app#201012237268. mechanical permit only on by others for catering kitchen. (type i hood) installation. | $10,000 |
| Sep 9, 2010 | Completed final sign-off May 2011 | 557 Valencia St | new restaurant ti: demo office and wait station. reconfigure bar to accomodate larger area of stool seating. reconstruction of facade to accomodate relocated entry. kitchen prep and dishroom area reconfiguration. lighting changes. interior finish updatesDetails
new restaurant ti: demo office and wait station. reconfigure bar to accomodate larger area of stool seating. reconstruction of facade to accomodate relocated entry. kitchen prep and dishroom area reconfiguration. lighting changes. interior finish updates | $275,000 |