Block 0251, lot 018
1030 Hyde St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 5
- Rooms
- 6 bedrooms, 6 bathrooms
- Building
- 4,046 sq ft
- Lot
- 1,498 sq ft
- Zoning
- RC4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2018 | Completed final sign-off Oct 2018 | 1030 Hyde St | change in use from limited restaurant to restaurant.Details
change in use from limited restaurant to restaurant. | ||
| Dec 7, 2012 | Completed final sign-off Jun 2013 | 1030 Hyde St | Alsterlind Construction Inc. | renovation of extg commercial space to include new store front curtain wall to replace extg, new commercial baking kitchen with type 2 hood, new equipment, food prep/service area. seating area, interior lighting, plmg and electrical work.Details
renovation of extg commercial space to include new store front curtain wall to replace extg, new commercial baking kitchen with type 2 hood, new equipment, food prep/service area. seating area, interior lighting, plmg and electrical work. | $134,000 |
| May 25, 2012 | Completed final sign-off Aug 2012 | 1030 Hyde St | Crime Watch Security Sys Llc | installation of a manual fire alarm and sprinkler including; facp, pull station, smoke detector, notification devices & monitor modules.Details
installation of a manual fire alarm and sprinkler including; facp, pull station, smoke detector, notification devices & monitor modules. | $3,800 |
| Feb 10, 2012 | Completed final sign-off Aug 2012 | 1032 Hyde St | Star Plumbing & Fire Const Co. | install new fire sprinkler system per nfpa 13 throughout the building. total 59 heads.Details
install new fire sprinkler system per nfpa 13 throughout the building. total 59 heads. | $30,000 |
| Dec 13, 2011 | Completed final sign-off Dec 2012 | 1032 Hyde St | Area Development Inc. | redoing front stucco for entire height of building.Details
redoing front stucco for entire height of building. | $15,000 |
| Nov 8, 2011 | Completed final sign-off Dec 2012 | 1030 Hyde St | Area Development Inc. | proposed modification to approved app#201109195018. modification framing plan.Details
proposed modification to approved app#201109195018. modification framing plan. | |
| Sep 28, 2011 | Never finaled issued Sep 2011, no final | 1030 Hyde St | street spaceDetails
street space | ||
| Sep 27, 2011 | Completed final sign-off Dec 2012 | 1030 Hyde St | Area Development Inc. | exploratory demo 500 sq.ft. of sheetrock per leel apartment levels only. all apart with no structural work.Details
exploratory demo 500 sq.ft. of sheetrock per leel apartment levels only. all apart with no structural work. | $10,000 |
| Sep 19, 2011 | Completed final sign-off Dec 2012 | 1030 Hyde St | Area Development Inc. | proposed interior remodeling of 4 units, proposed foundation repalcement & seismic upgrade. infill lightwell @ south face, extend lightwell on north face to 2nd floor, reconfiguration of (e) floor plan @ 2nd & 3rd floor.Details
proposed interior remodeling of 4 units, proposed foundation repalcement & seismic upgrade. infill lightwell @ south face, extend lightwell on north face to 2nd floor, reconfiguration of (e) floor plan @ 2nd & 3rd floor. | $350,000 |
| Oct 5, 2004 | Expired or cancelled expired Jan 2006 | 1030 Hyde St | Amer. Canvas & Awning | manufacture & install one tradatiional shape awning on front of office.Details
manufacture & install one tradatiional shape awning on front of office. | $1,650 |
| Oct 5, 2004 | Completed final sign-off Dec 2004 | 1030 Hyde St | Amer. Canvas & Awning | erect painted.Details
erect painted. | |
| Sep 19, 2000 | Completed final sign-off Feb 2001 | 1032 Hyde St | install tub around walls to existing bathtub & painting thru out entire apt #5Details
install tub around walls to existing bathtub & painting thru out entire apt #5 | $5,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.