Back to kitchen remodel contractors
Alpha Construction Co *Stop Issusing*
- Based in
- San Francisco
- On San Francisco permits
- Sep 2007 to Jul 2026
- Last 24 months
- 15 permits filed
97 permits since 2000: 71 completed, 1 in progress, 10 never finaled, 15 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 4 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 8 completed, 3 never finaled, 2 expired or cancelled. Typically 20 days from filing to permit and 314 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2021 | Expired or cancelled cancelled Feb 2022 | 226 Claremont Bl | kitchen & bathroom repair, upgrade electrical & plumbing. reinstall kitchen cabinets.Details
kitchen & bathroom repair, upgrade electrical & plumbing. reinstall kitchen cabinets. | $6,500 |
| Jan 19, 2021 | Completed final sign-off May 2021 | 30 Bernice St | the kitchen was put back to storage in response to nov# 201946046, kitchen appliance removed, cabinets removed, bathroom fixture replaced in-kind, shower door changedDetails
the kitchen was put back to storage in response to nov# 201946046, kitchen appliance removed, cabinets removed, bathroom fixture replaced in-kind, shower door changed | $8,000 |
| May 17, 2018 | Completed final sign-off Dec 2018 | 19 Homestead St | kitchen & bathroom remodel, repair damaged sheetrock, reifinish hardwood floor, comply w/nov #201859812 to repair front stair, less than 50%; comply w/201859831; no structural work, no wall modificationDetails
kitchen & bathroom remodel, repair damaged sheetrock, reifinish hardwood floor, comply w/nov #201859812 to repair front stair, less than 50%; comply w/201859831; no structural work, no wall modification | $25,000 |
| Dec 14, 2017 | Completed final sign-off Aug 2019 | 1651 Kirkwood Av | to comply with nov 201724721: repair stairs, fire proofing in garage, vents at garage, repair siding. remodeling & repairs at (e) kitchen & bathrm, including kitchen cabinets, flooring & wall repairs. repair drains & vents piping at kitchen & bathrm to bring to code to abate nov 201724992 & 20174971Details
to comply with nov 201724721: repair stairs, fire proofing in garage, vents at garage, repair siding. remodeling & repairs at (e) kitchen & bathrm, including kitchen cabinets, flooring & wall repairs. repair drains & vents piping at kitchen & bathrm to bring to code to abate nov 201724992 & 20174971 | $15,000 |
| Jul 6, 2017 | Completed final sign-off Aug 2018 | 1449 38th Av | remodel (e)kitchen, remove break from wall. relocate toilets to main bath on 2nd fl. remodel bath. add new master bedrm to 2nd fl. remove door at top of (e)interior stair. stair to remain. develop ground fl access rooms: 2 bedrms, family/dens, one bath, utility & laundry, 850sq ft. add new deckDetails
remodel (e)kitchen, remove break from wall. relocate toilets to main bath on 2nd fl. remodel bath. add new master bedrm to 2nd fl. remove door at top of (e)interior stair. stair to remain. develop ground fl access rooms: 2 bedrms, family/dens, one bath, utility & laundry, 850sq ft. add new deck | $95,720 |
| Jan 9, 2017 | Never finaled issued Jun 2017, no final | 165 Marview Wy | general interior remodeling including sheet rock replacement and (3) bathrooms and a kitchen remodel at 1st and 2nd floors.Details
general interior remodeling including sheet rock replacement and (3) bathrooms and a kitchen remodel at 1st and 2nd floors. | $30,000 |
| Oct 13, 2016 | Never finaled issued Aug 2017, no final | 139 Capistrano Av | horizontal extension. add sq ft area to main fl, lower level, change to (4) bedroom, reconfigure (e) layout, remodel kitchen, dining rm, family rm, (2) bathrooms, add master bedrm, master bath, add laundry rm. add rear deck, electrical main. upgrade, plumbing work, (n) stairsDetails
horizontal extension. add sq ft area to main fl, lower level, change to (4) bedroom, reconfigure (e) layout, remodel kitchen, dining rm, family rm, (2) bathrooms, add master bedrm, master bath, add laundry rm. add rear deck, electrical main. upgrade, plumbing work, (n) stairs | $300,000 |
| Dec 24, 2015 | Expired or cancelled expired May 2022 | 1136 Hampshire St | comply with nov# 201577881 & 201581851, legalize basement unit. restore fire damaged residence; new baths & toilet, new kitchen, new roof, re-wire portion of electrical, re-plumbing portion of (e) & (n) baths & toilet. legalize basement improvements. expanding over porch; grid. horizontal addition.Details
comply with nov# 201577881 & 201581851, legalize basement unit. restore fire damaged residence; new baths & toilet, new kitchen, new roof, re-wire portion of electrical, re-plumbing portion of (e) & (n) baths & toilet. legalize basement improvements. expanding over porch; grid. horizontal addition. | $204,000 |
| Apr 22, 2015 | Never finaled issued May 2015, no final | 74 06th St | renovation of 1st fl,basement,inerior finishes:2 accessible bathrs,addl kitchen,add laundry&mailboxes for tenant use, replace front auto sliding door system, remodel front/rear lobby,managers office,breakroom,ad storage see 1008.1.4.3 cbcDetails
renovation of 1st fl,basement,inerior finishes:2 accessible bathrs,addl kitchen,add laundry&mailboxes for tenant use, replace front auto sliding door system, remodel front/rear lobby,managers office,breakroom,ad storage see 1008.1.4.3 cbc | $210,000 |
| Apr 24, 2014 | Completed final sign-off Aug 2014 | 138 Hyde St | renovation of unist #15 & 23 to replace kitchen cabinets, sheet rock, light fixtures, plumbing fixtures, paint kitchen area 30 sq ft for each unitDetails
renovation of unist #15 & 23 to replace kitchen cabinets, sheet rock, light fixtures, plumbing fixtures, paint kitchen area 30 sq ft for each unit | $12,500 |
| Jul 16, 2013 | Completed final sign-off Apr 2021 | 7 Progress St | to abate complaint #201063186 & new kitchen. construct new deck at interior opening, new infill underneath (e) deck to extend. new walls & window over (e) deck to extend master bedroom constructed with no permit.Details
to abate complaint #201063186 & new kitchen. construct new deck at interior opening, new infill underneath (e) deck to extend. new walls & window over (e) deck to extend master bedroom constructed with no permit. | $15,000 |
| Aug 15, 2008 | Completed final sign-off Jul 2011 | 1124 Stanyan St | revision to pa#200806194808 to 1st flr to provide a new exercise rm w/a full bath;constr new stairs to connect all floors;on 2nd flr relocate kitchen & family rm. foundation upgrade & framing changes.replace front windows w/insulated glass window in kind. replace windows @ rear of 2nd floor.Details
revision to pa#200806194808 to 1st flr to provide a new exercise rm w/a full bath;constr new stairs to connect all floors;on 2nd flr relocate kitchen & family rm. foundation upgrade & framing changes.replace front windows w/insulated glass window in kind. replace windows @ rear of 2nd floor. | $80,000 |
| Apr 7, 2008 | Completed final sign-off Dec 2008 | 87 Virgil St | remodel kitchen and bathroom in units #2 and #3. permit to comply with n.o.v. 200850051.Details
remodel kitchen and bathroom in units #2 and #3. permit to comply with n.o.v. 200850051. | $20,000 |