Back to bathroom remodel contractors
Alpha Construction Co *Stop Issusing*
- Based in
- San Francisco
- On San Francisco permits
- Sep 2007 to Jul 2026
- Last 24 months
- 15 permits filed
97 permits since 2000: 71 completed, 1 in progress, 10 never finaled, 15 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 4 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 13 completed, 4 never finaled, 6 expired or cancelled. Typically 8 days from filing to permit and 253 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 1, 2023 | Expired or cancelled expired Feb 2026 | 785 Columbus Av | residential soft story seismic upgrade & ada bathroom addition. soft story retrofit/sfebc chapter 4d engineering criteria, 2016 cebc appendix a-4Details
residential soft story seismic upgrade & ada bathroom addition. soft story retrofit/sfebc chapter 4d engineering criteria, 2016 cebc appendix a-4 | $50,000 |
| Nov 1, 2023 | Expired or cancelled expired Feb 2026 | 785 Columbus Av | commercial soft story seismic upgrade & ada bathroom addition. soft story retrofit/sfebc chapter 4d engineering criteria, 2016 cebc appendix a-4Details
commercial soft story seismic upgrade & ada bathroom addition. soft story retrofit/sfebc chapter 4d engineering criteria, 2016 cebc appendix a-4 | $45,000 |
| Apr 27, 2021 | Completed final sign-off Nov 2021 | 11 College Tr | new master bedroom at back of ground level(garage area) including one full bathroom.Details
new master bedroom at back of ground level(garage area) including one full bathroom. | $65,000 |
| Jan 28, 2021 | Expired or cancelled cancelled Feb 2022 | 226 Claremont Bl | kitchen & bathroom repair, upgrade electrical & plumbing. reinstall kitchen cabinets.Details
kitchen & bathroom repair, upgrade electrical & plumbing. reinstall kitchen cabinets. | $6,500 |
| Jan 19, 2021 | Completed final sign-off May 2021 | 30 Bernice St | the kitchen was put back to storage in response to nov# 201946046, kitchen appliance removed, cabinets removed, bathroom fixture replaced in-kind, shower door changedDetails
the kitchen was put back to storage in response to nov# 201946046, kitchen appliance removed, cabinets removed, bathroom fixture replaced in-kind, shower door changed | $8,000 |
| Sep 6, 2018 | Completed final sign-off Aug 2020 | 1785 San Jose Av | interior remodel and legalizing of first flr bedroom, master bath and walk-in closets, voluntary seismic retrofit at first flrDetails
interior remodel and legalizing of first flr bedroom, master bath and walk-in closets, voluntary seismic retrofit at first flr | $97,000 |
| Aug 28, 2018 | Completed final sign-off Jan 2019 | 19 Homestead St | new bathroom at 2nd fl (top floor). - new fixtures: tub, shower valve, toilet, sink.Details
new bathroom at 2nd fl (top floor). - new fixtures: tub, shower valve, toilet, sink. | $11,000 |
| May 17, 2018 | Completed final sign-off Dec 2018 | 19 Homestead St | kitchen & bathroom remodel, repair damaged sheetrock, reifinish hardwood floor, comply w/nov #201859812 to repair front stair, less than 50%; comply w/201859831; no structural work, no wall modificationDetails
kitchen & bathroom remodel, repair damaged sheetrock, reifinish hardwood floor, comply w/nov #201859812 to repair front stair, less than 50%; comply w/201859831; no structural work, no wall modification | $25,000 |
| Jul 6, 2017 | Completed final sign-off Aug 2018 | 1449 38th Av | remodel (e)kitchen, remove break from wall. relocate toilets to main bath on 2nd fl. remodel bath. add new master bedrm to 2nd fl. remove door at top of (e)interior stair. stair to remain. develop ground fl access rooms: 2 bedrms, family/dens, one bath, utility & laundry, 850sq ft. add new deckDetails
remodel (e)kitchen, remove break from wall. relocate toilets to main bath on 2nd fl. remodel bath. add new master bedrm to 2nd fl. remove door at top of (e)interior stair. stair to remain. develop ground fl access rooms: 2 bedrms, family/dens, one bath, utility & laundry, 850sq ft. add new deck | $95,720 |
| May 24, 2017 | Never finaled issued May 2017, no final | 124 Waverly Pl | remodel 4 common use bathrooms, replace tile on floor and walls, replace shower pan, repair wall, wood frame, replace plumbing fixture and paint. (bathrooms serve units not covered for accessibility requirements). no change in openings and wall layout.Details
remodel 4 common use bathrooms, replace tile on floor and walls, replace shower pan, repair wall, wood frame, replace plumbing fixture and paint. (bathrooms serve units not covered for accessibility requirements). no change in openings and wall layout. | $16,000 |
| Jan 9, 2017 | Never finaled issued Jun 2017, no final | 165 Marview Wy | general interior remodeling including sheet rock replacement and (3) bathrooms and a kitchen remodel at 1st and 2nd floors.Details
general interior remodeling including sheet rock replacement and (3) bathrooms and a kitchen remodel at 1st and 2nd floors. | $30,000 |
| Dec 12, 2016 | Completed final sign-off Oct 2017 | 1550 Plymouth Av | convert (e) storage space to living space. excavate to create living space. all (n) living space is on 1st floor. add laundry, full bath, half bath, media room, game room and bedroomDetails
convert (e) storage space to living space. excavate to create living space. all (n) living space is on 1st floor. add laundry, full bath, half bath, media room, game room and bedroom | $90,000 |
| Oct 13, 2016 | Never finaled issued Aug 2017, no final | 139 Capistrano Av | horizontal extension. add sq ft area to main fl, lower level, change to (4) bedroom, reconfigure (e) layout, remodel kitchen, dining rm, family rm, (2) bathrooms, add master bedrm, master bath, add laundry rm. add rear deck, electrical main. upgrade, plumbing work, (n) stairsDetails
horizontal extension. add sq ft area to main fl, lower level, change to (4) bedroom, reconfigure (e) layout, remodel kitchen, dining rm, family rm, (2) bathrooms, add master bedrm, master bath, add laundry rm. add rear deck, electrical main. upgrade, plumbing work, (n) stairs | $300,000 |
| Dec 24, 2015 | Expired or cancelled expired May 2022 | 1136 Hampshire St | comply with nov# 201577881 & 201581851, legalize basement unit. restore fire damaged residence; new baths & toilet, new kitchen, new roof, re-wire portion of electrical, re-plumbing portion of (e) & (n) baths & toilet. legalize basement improvements. expanding over porch; grid. horizontal addition.Details
comply with nov# 201577881 & 201581851, legalize basement unit. restore fire damaged residence; new baths & toilet, new kitchen, new roof, re-wire portion of electrical, re-plumbing portion of (e) & (n) baths & toilet. legalize basement improvements. expanding over porch; grid. horizontal addition. | $204,000 |
| Apr 8, 2014 | Expired or cancelled expired Dec 2015 | 445 Ofarrell St | repair or renail subfloor around toilet of bathroom to abate item #6 of nov #201449593Details
repair or renail subfloor around toilet of bathroom to abate item #6 of nov #201449593 | $600 |
| Mar 13, 2014 | Never finaled issued Mar 2014, no final | 360 Hyde St | sheet rock repair at hallway on 3rd floor and ceiling bathroom in room #501 to comply with nov# 201451661, item #9.Details
sheet rock repair at hallway on 3rd floor and ceiling bathroom in room #501 to comply with nov# 201451661, item #9. | $400 |
| Mar 5, 2014 | Completed final sign-off Mar 2014 | 130 Eddy St | install (n) window in bathroom for room #400. measurement 20"x30" to comply with nov# 201398561, item #3. note: if window is 60" or less above drain, needs to be "safety" glazed.Details
install (n) window in bathroom for room #400. measurement 20"x30" to comply with nov# 201398561, item #3. note: if window is 60" or less above drain, needs to be "safety" glazed. | $300 |
| Jul 5, 2013 | Completed final sign-off Mar 2014 | 1637 Pierce St | commercial t.i-interior remodeling, new ada bathrooms, wood frame, sheetrock, paint, flooring & steel frame work. voluntary structural strenghtening.Details
commercial t.i-interior remodeling, new ada bathrooms, wood frame, sheetrock, paint, flooring & steel frame work. voluntary structural strenghtening. | $75,000 |
| Sep 4, 2008 | Completed final sign-off Apr 2009 | 3300 Clay St | work @ unit# 1 only. comply with nov# 200683015. repair & remodel 2 existing bathrooms. no structural work. no new lighting.Details
work @ unit# 1 only. comply with nov# 200683015. repair & remodel 2 existing bathrooms. no structural work. no new lighting. | $5,500 |
| Aug 15, 2008 | Completed final sign-off Jul 2011 | 1124 Stanyan St | revision to pa#200806194808 to 1st flr to provide a new exercise rm w/a full bath;constr new stairs to connect all floors;on 2nd flr relocate kitchen & family rm. foundation upgrade & framing changes.replace front windows w/insulated glass window in kind. replace windows @ rear of 2nd floor.Details
revision to pa#200806194808 to 1st flr to provide a new exercise rm w/a full bath;constr new stairs to connect all floors;on 2nd flr relocate kitchen & family rm. foundation upgrade & framing changes.replace front windows w/insulated glass window in kind. replace windows @ rear of 2nd floor. | $80,000 |
| Apr 7, 2008 | Completed final sign-off Dec 2008 | 87 Virgil St | remodel kitchen and bathroom in units #2 and #3. permit to comply with n.o.v. 200850051.Details
remodel kitchen and bathroom in units #2 and #3. permit to comply with n.o.v. 200850051. | $20,000 |
| Apr 7, 2008 | Expired or cancelled expired Feb 2011 | 1214 Polk St | repair all damaged shower partitions throught as needed. replace toilet as needed. repair ceramic tiles as needed & replace (e) lighting damaged to comply. all work in residential units only. 3 bathrooms only. repair.Details
repair all damaged shower partitions throught as needed. replace toilet as needed. repair ceramic tiles as needed & replace (e) lighting damaged to comply. all work in residential units only. 3 bathrooms only. repair. | $19,362 |
| Sep 27, 2007 | Completed final sign-off Dec 2008 | 2526 Francisco St | site permit. horizontal addition of master bedroom and bathroom on 3rd fl (partial 3rd fl)m horizontal addition of family room , bedroom and bathroom on ground floor. new rear deck.Details
site permit. horizontal addition of master bedroom and bathroom on 3rd fl (partial 3rd fl)m horizontal addition of family room , bedroom and bathroom on ground floor. new rear deck. | $300,000 |