Alpha Construction Co *Stop Issusing*
- Based in
- San Francisco
- On San Francisco permits
- Sep 2007 to Jul 2026
- Last 24 months
- 15 permits filed
97 permits since 2000: 71 completed, 1 in progress, 10 never finaled, 15 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 4 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 5 completed, 1 never finaled. Typically 58 days from filing to permit and 350 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2026 | Completed final sign-off Jul 2026 | 900 Kansas St | repairs existing stairs and deck front of bldg, less than 50% repairs.Details
repairs existing stairs and deck front of bldg, less than 50% repairs. | $2,000 |
| Jul 6, 2017 | Completed final sign-off Aug 2018 | 1449 38th Av | remodel (e)kitchen, remove break from wall. relocate toilets to main bath on 2nd fl. remodel bath. add new master bedrm to 2nd fl. remove door at top of (e)interior stair. stair to remain. develop ground fl access rooms: 2 bedrms, family/dens, one bath, utility & laundry, 850sq ft. add new deckDetails
remodel (e)kitchen, remove break from wall. relocate toilets to main bath on 2nd fl. remodel bath. add new master bedrm to 2nd fl. remove door at top of (e)interior stair. stair to remain. develop ground fl access rooms: 2 bedrms, family/dens, one bath, utility & laundry, 850sq ft. add new deck | $95,720 |
| May 12, 2017 | Completed final sign-off Jun 2017 | 2490 17th Av | construction of new wood deck and stairs at back. installation of one sliding door and one wood door at backDetails
construction of new wood deck and stairs at back. installation of one sliding door and one wood door at back | $5,500 |
| Oct 13, 2016 | Never finaled issued Aug 2017, no final | 139 Capistrano Av | horizontal extension. add sq ft area to main fl, lower level, change to (4) bedroom, reconfigure (e) layout, remodel kitchen, dining rm, family rm, (2) bathrooms, add master bedrm, master bath, add laundry rm. add rear deck, electrical main. upgrade, plumbing work, (n) stairsDetails
horizontal extension. add sq ft area to main fl, lower level, change to (4) bedroom, reconfigure (e) layout, remodel kitchen, dining rm, family rm, (2) bathrooms, add master bedrm, master bath, add laundry rm. add rear deck, electrical main. upgrade, plumbing work, (n) stairs | $300,000 |
| Jul 16, 2013 | Completed final sign-off Apr 2021 | 7 Progress St | to abate complaint #201063186 & new kitchen. construct new deck at interior opening, new infill underneath (e) deck to extend. new walls & window over (e) deck to extend master bedroom constructed with no permit.Details
to abate complaint #201063186 & new kitchen. construct new deck at interior opening, new infill underneath (e) deck to extend. new walls & window over (e) deck to extend master bedroom constructed with no permit. | $15,000 |
| Sep 27, 2007 | Completed final sign-off Dec 2008 | 2526 Francisco St | site permit. horizontal addition of master bedroom and bathroom on 3rd fl (partial 3rd fl)m horizontal addition of family room , bedroom and bathroom on ground floor. new rear deck.Details
site permit. horizontal addition of master bedroom and bathroom on 3rd fl (partial 3rd fl)m horizontal addition of family room , bedroom and bathroom on ground floor. new rear deck. | $300,000 |