Block 6504, lot 037
19 Homestead St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 3
- Rooms
- 4 bathrooms
- Building
- 2,632 sq ft
- Lot
- 3,136 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2018 | Completed final sign-off Jan 2019 | 19 Homestead St | Alpha Construction Co *Stop Issusing* | new bathroom at 2nd fl (top floor). - new fixtures: tub, shower valve, toilet, sink.Details
new bathroom at 2nd fl (top floor). - new fixtures: tub, shower valve, toilet, sink. | $11,000 |
| Jul 16, 2018 | Completed final sign-off Jul 2018 | 19 Homestead St | Golden State Windows Inc | replace 5 windows in the back of the house with vinyl cascade; 5 window total. u-factor 0.32max or better. in-kind replacement.Details
replace 5 windows in the back of the house with vinyl cascade; 5 window total. u-factor 0.32max or better. in-kind replacement. | $6,000 |
| May 17, 2018 | Completed final sign-off Dec 2018 | 19 Homestead St | Alpha Construction Co *Stop Issusing* | kitchen & bathroom remodel, repair damaged sheetrock, reifinish hardwood floor, comply w/nov #201859812 to repair front stair, less than 50%; comply w/201859831; no structural work, no wall modificationDetails
kitchen & bathroom remodel, repair damaged sheetrock, reifinish hardwood floor, comply w/nov #201859812 to repair front stair, less than 50%; comply w/201859831; no structural work, no wall modification | $25,000 |
| Mar 25, 2010 | Completed final sign-off Apr 2010 | 19 Homestead St | Saba J Inc/Dba Reliance Construction | weather proofing the north east corner of unit 19b 10'x 10' size. mold remediation at rear room 19b from closet, base boards filling the gaps and spaces between joists on north side of the room eliminating the source of penetrating moisture into rear room.Details
weather proofing the north east corner of unit 19b 10'x 10' size. mold remediation at rear room 19b from closet, base boards filling the gaps and spaces between joists on north side of the room eliminating the source of penetrating moisture into rear room. | $2,000 |
| May 23, 2005 | Never finaled issued May 2005, no final | 19 Homestead St | R B Roofing Co Inc | reroofingDetails
reroofing | $11,500 |
| Aug 11, 2004 | Completed final sign-off Aug 2004 | 19 Homestead St | Ames-Billingsley, Inc. | install 3 replacement windows-not visible from the streetDetails
install 3 replacement windows-not visible from the street | $3,911 |
| Jun 9, 2003 | Completed final sign-off Nov 2003 | 19 Homestead St | replace existing front entry stairs to house (dry rot) in kind no alteration in size or configuratnDetails
replace existing front entry stairs to house (dry rot) in kind no alteration in size or configuratn | $1,000 | |
| Jan 27, 2003 | Never finaled issued Jan 2003, no final | 19 Homestead St | less than 50 percent-repair any dry rot as inspected front stairway & porch safety rails, comply w/hDetails
less than 50 percent-repair any dry rot as inspected front stairway & porch safety rails, comply w/h | $2,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.