Stephen Verner
- Listed as
- architect, designer
- Firm
- Verner Architects
- Based in
- Oakland
- On San Francisco permits
- Jul 2015 to Sep 2026
35 permits since 2000 (architect on 34 permits, designer on 1 permit): 23 completed, 4 in progress, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 119 16th Av | rev 202211166671:1 bath removed from 1/f. rear ext @ g/f reduced to 12'5". excavate portion of l/l for increased clg ht @1/f living spaces, +/-22" at br1+p br 1". mass at 4/f addtn reducted. frnt setback maintained, pulled in 10' @rear.Details
rev 202211166671:1 bath removed from 1/f. rear ext @ g/f reduced to 12'5". excavate portion of l/l for increased clg ht @1/f living spaces, +/-22" at br1+p br 1". mass at 4/f addtn reducted. frnt setback maintained, pulled in 10' @rear. | ||
| Jul 8, 2026 | In progress issued Jul 2026 | 1896 Pacific Av | Citidev Inc. | repair (e) solarium overhead glass. retain (e) roof & solarium structure. repair (e) exterior door ar rec. room. remove (e) tile and topping slab at terrace, retain (e) structural slab.install (n) insulation. waterproofing, drainage & pavers ib pedestal system, tie to drainage system.Details
repair (e) solarium overhead glass. retain (e) roof & solarium structure. repair (e) exterior door ar rec. room. remove (e) tile and topping slab at terrace, retain (e) structural slab.install (n) insulation. waterproofing, drainage & pavers ib pedestal system, tie to drainage system. | $50,000 |
| Mar 17, 2026 | In progress issued Mar 2026 | 1139 Lake St | lightwell infill w/ four story elevator to improve building accessibility. no increase to bldg height. new common stair & vestibule serving all 3 dwelling units. new stair (interior) at upper most unit.Details
lightwell infill w/ four story elevator to improve building accessibility. no increase to bldg height. new common stair & vestibule serving all 3 dwelling units. new stair (interior) at upper most unit. | $300,000 | |
| May 15, 2025 | Completed final sign-off Jun 2026 | 1767 Green St | Ggd Inc. | revision to pa #2024-0806-7997 (n) unconditioned storage at (n) crawl space. (n) retaining wall in rear yard. relocate (n) water heaters and heat pumps within crawl space.Details
revision to pa #2024-0806-7997 (n) unconditioned storage at (n) crawl space. (n) retaining wall in rear yard. relocate (n) water heaters and heat pumps within crawl space. | |
| Nov 19, 2024 | In progress issued Apr 2025 | 209 Henry St | 0303 Construction Inc. | interior remodel w/2 story rear horizontal addition exempt from 311 pursuant to sec.311.b.3. convert 1183sf of (e) garage space to conditioned living +1 garage car. (n)skylights. windows at rear and side. (n) radiant heating,water heater,electrical. excavate 20", 2new baths@1st flDetails
interior remodel w/2 story rear horizontal addition exempt from 311 pursuant to sec.311.b.3. convert 1183sf of (e) garage space to conditioned living +1 garage car. (n)skylights. windows at rear and side. (n) radiant heating,water heater,electrical. excavate 20", 2new baths@1st fl | $695,000 |
| Aug 6, 2024 | Completed final sign-off Jun 2026 | 1767 Green St | Ggd Inc. | 2 story addition and infill at open light well w/2 story addition at rear. infill under (e) 2nd fl. add one full bath at 1st fl. unit (n) deck at 2nd fl. w/ egress stair. renovate 2nd fl. unit (n) site and retaining walls at rear yardDetails
2 story addition and infill at open light well w/2 story addition at rear. infill under (e) 2nd fl. add one full bath at 1st fl. unit (n) deck at 2nd fl. w/ egress stair. renovate 2nd fl. unit (n) site and retaining walls at rear yard | $300,000 |
| Jun 10, 2024 | Completed final sign-off May 2025 | 1326 Guerrero St | Mccormack Construction | rev 202304216181- reduction of structural opening at rear elevation, addition of shotcrete @lightwells. legalize (e) front roof deck over garage, replace (e) railings with code complaint railingsDetails
rev 202304216181- reduction of structural opening at rear elevation, addition of shotcrete @lightwells. legalize (e) front roof deck over garage, replace (e) railings with code complaint railings | |
| May 31, 2024 | Expired or cancelled expired May 2026 | 3662 Clay St | Clayton Timbrell & Co | revision 202402065307: revision to interior stair framing & n) skylight, demo e) winddow at stair wall & add additional windows. new additional 9 sf at breakfast nookDetails
revision 202402065307: revision to interior stair framing & n) skylight, demo e) winddow at stair wall & add additional windows. new additional 9 sf at breakfast nook | $50,000 |
| Feb 6, 2024 | Completed final sign-off Sep 2026 | 3662 Clay St | Clayton Timbrell & Co | garage - replace (e) garage door in-kind. basement - demo & replace bay windows in kind; (n) hvac; demo sleect finishes & millwork; 1st fl - demo & replace bay windows in kind; remodel kitchen & diningrm; 20 sf infill/addition @ kitchen; (n) windows@ main stair; 2nd fl - remodel @ primary suite,Details
garage - replace (e) garage door in-kind. basement - demo & replace bay windows in kind; (n) hvac; demo sleect finishes & millwork; 1st fl - demo & replace bay windows in kind; remodel kitchen & diningrm; 20 sf infill/addition @ kitchen; (n) windows@ main stair; 2nd fl - remodel @ primary suite, | $635,000 |
| Nov 16, 2023 | Completed final sign-off May 2025 | 1326 Guerrero St | Mccormack Construction | exterior work only - facade restoration. (e) windows to remain.Details
exterior work only - facade restoration. (e) windows to remain. | $108,000 |
| Sep 20, 2023 | Completed final sign-off Feb 2026 | 127 26th Av | 0303 Construction Inc. | moving rear yard retaining wall to full width of bldg. for additional mech'l equipment. rev to addendum. add new 36" handrail, new hot tub install on grade below deck.Details
moving rear yard retaining wall to full width of bldg. for additional mech'l equipment. rev to addendum. add new 36" handrail, new hot tub install on grade below deck. | $385,000 |
| Apr 21, 2023 | Completed final sign-off May 2025 | 1326 Guerrero St | Mccormack Construction | replace(e)brick foundation w/(n) concrete. garage+roof structural upgrade, level house@ rear. full crawlspace digout for(1)additional parking space, install interior stair from garage to main house. n basement w/ n bedroom suite. reno to kitchen & primary suite 2nd flr bath, replace 1 full. shoring.Details
replace(e)brick foundation w/(n) concrete. garage+roof structural upgrade, level house@ rear. full crawlspace digout for(1)additional parking space, install interior stair from garage to main house. n basement w/ n bedroom suite. reno to kitchen & primary suite 2nd flr bath, replace 1 full. shoring. | $510,000 |
| Mar 16, 2023 | Completed final sign-off Oct 2024 | 1124 Moraga St | Daaron Builders | interior remodel w/ minor 136sf infill addition at 1/f, exempt from 311 pursuant to zab-014 "fill in". new skylights, new windows at sides and rear, new pl window, pursuant to ab-009. new bath at 2/f, new heat pump conditioning. new solar by owner. (e) hw to remain.Details
interior remodel w/ minor 136sf infill addition at 1/f, exempt from 311 pursuant to zab-014 "fill in". new skylights, new windows at sides and rear, new pl window, pursuant to ab-009. new bath at 2/f, new heat pump conditioning. new solar by owner. (e) hw to remain. | $250,000 |
| Jan 31, 2023 | Completed final sign-off Apr 2024 | 919 Sanchez St | Gill Construction | steel trellis over previously permitted at grade deck, ref pa# 202009265055. 60 sqft open trellis 8'-0" ht above gradeDetails
steel trellis over previously permitted at grade deck, ref pa# 202009265055. 60 sqft open trellis 8'-0" ht above grade | $7,580 |
| Jan 23, 2023 | Expired or cancelled withdrawn Jul 2024 | 1767 Green St | 2-story infill at open lightwell along west property line. 1-story infill under (e) 2nd fl at rear. partial renovation 1st fl unit, add 1 full bath. deck at 2nd fl with egress stair.Details
2-story infill at open lightwell along west property line. 1-story infill under (e) 2nd fl at rear. partial renovation 1st fl unit, add 1 full bath. deck at 2nd fl with egress stair. | $189,000 | |
| Oct 14, 2022 | Completed final sign-off Mar 2023 | 101 Henry Adams St | C C I Commercial Construction & Improv | ste 144: construct new ada bathroom in sf design center riggs showroomDetails
ste 144: construct new ada bathroom in sf design center riggs showroom | $20,000 |
| Jul 28, 2022 | Never finaled issued Aug 2022, no final | 1157 Post St | Clayton Timbrell & Co | tenant improvement. interior scope finiahes, partitions & finisheings only. ada upfrade at 20% of project budget includes bathrooms on main level, signage, drinking fountain. no work done to exterior under this permit. no new work for mep, maintenance only.Details
tenant improvement. interior scope finiahes, partitions & finisheings only. ada upfrade at 20% of project budget includes bathrooms on main level, signage, drinking fountain. no work done to exterior under this permit. no new work for mep, maintenance only. | $180,949 |
| Feb 10, 2022 | Never finaled issued Feb 2022, no final | 3565 Clay St | Clayton Timbrell & Co | (n) windows at front third floor to match (e) wood, true divided lites. (n) doors at rear. interior remodel, (n) fixtures & finishes with (n) interior partitions at 1st fl. (n) water feature, tub & finishes at rear yard.Details
(n) windows at front third floor to match (e) wood, true divided lites. (n) doors at rear. interior remodel, (n) fixtures & finishes with (n) interior partitions at 1st fl. (n) water feature, tub & finishes at rear yard. | $200,000 |
| Jan 4, 2022 | Expired or cancelled withdrawn Apr 2023 | 1326 Guerrero St | replace(e)brick foundation w/(n) concrete. elective garage+roof structural upgrade, level house@ rear. partial crawlspace digout(approx 43 cu yds)for(1)additional parking space(total2)install interior stair from garage to main house. renovations to kitchen+primary suit, replace(1)half bath @ 1st fl.Details
replace(e)brick foundation w/(n) concrete. elective garage+roof structural upgrade, level house@ rear. partial crawlspace digout(approx 43 cu yds)for(1)additional parking space(total2)install interior stair from garage to main house. renovations to kitchen+primary suit, replace(1)half bath @ 1st fl. | $535,000 | |
| Dec 10, 2021 | Completed final sign-off Mar 2023 | 101 Henry Adams St | mechanical system, t24 only. correction to bpa#202109309528, building occupancy not a-2 restaurant, occupancy is m. occupancy only use for cooking,demo only.Details
mechanical system, t24 only. correction to bpa#202109309528, building occupancy not a-2 restaurant, occupancy is m. occupancy only use for cooking,demo only. | $20,000 | |
| Aug 4, 2021 | Completed final sign-off Feb 2026 | 127 26th Av | 0303 Construction Inc. | horizontal expansion >10' at rear, ar ground, 1st, + 2nd floors. vertical expansion >7' at rear, to create partial 3rd floor + roof deck w/ height variance for max 33" abv height envelope. renovate (e) 1st + 2nd floors, adding (1) full bath. (n) rearyard deck + stair. excavation at ground flrDetails
horizontal expansion >10' at rear, ar ground, 1st, + 2nd floors. vertical expansion >7' at rear, to create partial 3rd floor + roof deck w/ height variance for max 33" abv height envelope. renovate (e) 1st + 2nd floors, adding (1) full bath. (n) rearyard deck + stair. excavation at ground flr | $385,000 |
| May 25, 2021 | Never finaled filed May 2021, never issued | 1858 10th Av | renovate (e) 1st & 2nd floors, convert portion of (e) garage into living space, infill (e) tradesman's path & lightwell, horizontal expansion at rear, 3'-10" ht increase @ rearDetails
renovate (e) 1st & 2nd floors, convert portion of (e) garage into living space, infill (e) tradesman's path & lightwell, horizontal expansion at rear, 3'-10" ht increase @ rear | $195,000 | |
| Jan 11, 2021 | Completed final sign-off Nov 2022 | 610 El Camino Del Mar | revision to pa #201804257347 - change of existing rear solarium from glazing to tile roof to match existing roofs. no change to roof form/building envelope. not visible from public right of wayDetails
revision to pa #201804257347 - change of existing rear solarium from glazing to tile roof to match existing roofs. no change to roof form/building envelope. not visible from public right of way | $45,000 | |
| Feb 19, 2020 | Never finaled issued Jun 2020, no final | 610 El Camino Del Mar | per boa appeal no. 19-007 dated 12/17/2009, grants the appeal and orders that the denial of the subject permit by the dbi is overruled.Details
per boa appeal no. 19-007 dated 12/17/2009, grants the appeal and orders that the denial of the subject permit by the dbi is overruled. | ||
| Sep 30, 2019 | Completed final sign-off May 2022 | 275 09th Av | Cuan Construction | revision to 201906133338. full exact replacement of rear 3 story addition with new construction due to poor condition of e structureDetails
revision to 201906133338. full exact replacement of rear 3 story addition with new construction due to poor condition of e structure | |
| Jun 13, 2019 | Completed final sign-off May 2022 | 275 09th Av | Cuan Construction | limited excavation at 1st floor to convert storage to living with 1 full bath & 1 bedroom. infill lightwell at 2nd & 3rd floors. renovate kitchen add 1/2 bath & rear deck at 2nd. add full bath & laundry at 3rd fl. reroof at rear, 3 new skylights. replace wndows and furnace wnd to match extg at frontDetails
limited excavation at 1st floor to convert storage to living with 1 full bath & 1 bedroom. infill lightwell at 2nd & 3rd floors. renovate kitchen add 1/2 bath & rear deck at 2nd. add full bath & laundry at 3rd fl. reroof at rear, 3 new skylights. replace wndows and furnace wnd to match extg at front | $250,000 |
| Apr 5, 2019 | Completed final sign-off Jun 2021 | 2288 Broadway | Clayton Timbrell & Co | renovation of kitchen & 3 bathrooms, addition of power rm , new lighting, electrical, plumbing fixtures, modification of (e) heating system, replace (e) single pane window & doors w/ inslated units to matchDetails
renovation of kitchen & 3 bathrooms, addition of power rm , new lighting, electrical, plumbing fixtures, modification of (e) heating system, replace (e) single pane window & doors w/ inslated units to match | $209,000 |
| Apr 25, 2018 | Completed final sign-off Nov 2022 | 610 El Camino Del Mar | extension of (e) terrace & railing @ main living fl to replace a portion of (e) solarium roof. no alterations to front of house.Details
extension of (e) terrace & railing @ main living fl to replace a portion of (e) solarium roof. no alterations to front of house. | $77,000 | |
| Feb 20, 2018 | Never finaled issued Aug 2019, no final | 2147 Lake St | 1st flr: addition @ rear & west side, interior remodel. 2nd flr: addition @ rear & west side, int. remodel, rebuild bay window & stair to front door. 3rd flr: addition @ rear & both sides, int. remodel, (n) roof.Details
1st flr: addition @ rear & west side, interior remodel. 2nd flr: addition @ rear & west side, int. remodel, rebuild bay window & stair to front door. 3rd flr: addition @ rear & both sides, int. remodel, (n) roof. | $360,000 | |
| May 1, 2017 | Completed final sign-off Jun 2017 | 297 Magellan Av | Gill Construction | remove e rear wd deck. replace with new conc patio including integral planter and bench. replace adjacent fenceDetails
remove e rear wd deck. replace with new conc patio including integral planter and bench. replace adjacent fence | $25,000 |
| Apr 19, 2017 | Completed final sign-off Jul 2020 | 2647 Pierce St | Larkspur Builder | basement: expand to full bath, minor floor plan changes to enclose mud room & storage room, (n) window & exterior door. 2/f: replace (e) skylight & add door @ rear deck, minor interior remodel, replace fireplace. no work on 1/f & 3/f, no work visable from street.Details
basement: expand to full bath, minor floor plan changes to enclose mud room & storage room, (n) window & exterior door. 2/f: replace (e) skylight & add door @ rear deck, minor interior remodel, replace fireplace. no work on 1/f & 3/f, no work visable from street. | $135,000 |
| Jan 17, 2017 | Completed final sign-off Jun 2018 | 1219 19th St | Daaron Builders | lower level bathroom renovation, addition of (n) mudroom. upper level bath & kitchen removation. (n) windows & doors @ select locations. legalize bathroom and bedroom on 1st floor and convert (e) study room to master bedroom on 2nd floor.Details
lower level bathroom renovation, addition of (n) mudroom. upper level bath & kitchen removation. (n) windows & doors @ select locations. legalize bathroom and bedroom on 1st floor and convert (e) study room to master bedroom on 2nd floor. | $87,500 |
| May 31, 2016 | Completed final sign-off Sep 2017 | 140 Pacheco St | Gill Construction | 1st flr: expand conditioned space into garage. create new bedroom suite. select window & door replacements. 2nd flr: kitchen & bathroom renovations with window replacementsDetails
1st flr: expand conditioned space into garage. create new bedroom suite. select window & door replacements. 2nd flr: kitchen & bathroom renovations with window replacements | $75,000 |
| Feb 26, 2016 | Completed final sign-off May 2019 | 44 Delmar St | Gill Construction, S F Bay Construction Inc | original pa# 2007/12/28/1463, #2012/12/17/6327, extended by pa# 2016/02/04/8794. changes to original permit: 2nd floor: reconfigure dimensions of horizontal addition. 3rd floor: new horizon addition. 1st floor no change. room count unchange.Details
original pa# 2007/12/28/1463, #2012/12/17/6327, extended by pa# 2016/02/04/8794. changes to original permit: 2nd floor: reconfigure dimensions of horizontal addition. 3rd floor: new horizon addition. 1st floor no change. room count unchange. | $75,000 |
| Jul 24, 2015 | Completed final sign-off Jul 2020 | 2647 Pierce St | Larkspur Builder | basement,1st fl,2nd fl: no work. 3rd fl: interior remodeling & minor infill additions at rear corners of building. roof: (n) dormer @ front minimal visibility from street, (n) roof deck @ rear.Details
basement,1st fl,2nd fl: no work. 3rd fl: interior remodeling & minor infill additions at rear corners of building. roof: (n) dormer @ front minimal visibility from street, (n) roof deck @ rear. | $295,000 |