Manny Gonzalez
- Listed as
- authorized agent-others, contractor
- Firm
- Bay Metro Corporation
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Sep 2026
167 permits since 2000 (contractor on 167 permits, authorized agent-others on 2 permits): 152 completed, 3 in progress, 7 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 167.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2026 | In progress issued Sep 2026 | 2418 Fulton St | Bay Metro Corporation | repair fire damage to front exterior elevation. replace 2 windows in 2420 bedroom and replace trim. replace 1 window in lower storage room, replace window trim. replace side alleyway door, paint exterior front. windows and door in kind.Details
repair fire damage to front exterior elevation. replace 2 windows in 2420 bedroom and replace trim. replace 1 window in lower storage room, replace window trim. replace side alleyway door, paint exterior front. windows and door in kind. | $20,000 |
| Jul 13, 2026 | In progress issued Jul 2026 | 485 Arlington St | Bay Metro Corporation | unit a: kitchen remodel, replace drywall on walls and ceiling, rewire and update plumbing, new cabinets, tiles, floors, counter tops, new sink. no removal of wallsDetails
unit a: kitchen remodel, replace drywall on walls and ceiling, rewire and update plumbing, new cabinets, tiles, floors, counter tops, new sink. no removal of walls | $30,000 |
| May 18, 2026 | Completed final sign-off Aug 2026 | 1426 25th Av | Bay Metro Corporation | repair 8' x 10' section of (e) siding at rear elevation & property line due to fire damage. repair affected wall framing at damaged wall. patch effected section of roof, about 6' x8'. replace drywall in rear bedroom & celling drywall in 2nd bedroom & partial hallway. rewire affected bedroom.Details
repair 8' x 10' section of (e) siding at rear elevation & property line due to fire damage. repair affected wall framing at damaged wall. patch effected section of roof, about 6' x8'. replace drywall in rear bedroom & celling drywall in 2nd bedroom & partial hallway. rewire affected bedroom. | $40,000 |
| Apr 14, 2026 | In progress issued Apr 2026 | 255 Niagara Av | Bay Metro Corporation | to comply with nov 202548134. repair fire and water damage on main lower levels. repair affected framing in rear bedroom and bathroom. kitchen and bathroom remodel in-kind, like for like. replace rear window, siding, roof in-kind at damaged area. all new repair to match existing conditions.Details
to comply with nov 202548134. repair fire and water damage on main lower levels. repair affected framing in rear bedroom and bathroom. kitchen and bathroom remodel in-kind, like for like. replace rear window, siding, roof in-kind at damaged area. all new repair to match existing conditions. | $200,000 |
| Mar 5, 2026 | Completed final sign-off Jun 2026 | 364 Country Club Dr | Bay Metro Corporation | remodel main bathroom, replace tub, shower, sink 7 toilet, new fixtures, tile in existing locations, new exhaust fan & light fixturesDetails
remodel main bathroom, replace tub, shower, sink 7 toilet, new fixtures, tile in existing locations, new exhaust fan & light fixtures | $25,000 |
| Nov 13, 2025 | Completed final sign-off Mar 2026 | 364 Country Club Dr | Bay Metro Corporation | bathroom remodel, replace toilet, shower fixtures and sink in existing location. replace drywall & tile. install new exhaust fan & light fixture. like for like.Details
bathroom remodel, replace toilet, shower fixtures and sink in existing location. replace drywall & tile. install new exhaust fan & light fixture. like for like. | $15,000 |
| Aug 7, 2025 | Completed final sign-off Mar 2026 | 1406 35th Av | Bay Metro Corporation | comply w/ nov 202534773 - repairs to (2) units due to fire damage. replace (2) furnaces & water heaters in garage, install drywall in storage rm. lower unit:rewire, new light fixtures, new drywall in affected kitchen, living rm, & bathrm. new plumbing fixtures in kitchen & bathroom. no walls removalDetails
comply w/ nov 202534773 - repairs to (2) units due to fire damage. replace (2) furnaces & water heaters in garage, install drywall in storage rm. lower unit:rewire, new light fixtures, new drywall in affected kitchen, living rm, & bathrm. new plumbing fixtures in kitchen & bathroom. no walls removal | $55,000 |
| Aug 5, 2025 | Completed final sign-off Apr 2026 | 630 47th Av | Bay Metro Corporation | repairs to main level and lower level due to water damage. patch drywall on both levels. replace tile in bathroom on main level. replace walk in shower in lower level, reinstall 3 toilets, 2 vanity sinks. replace countertops in kitchen, re-install sink and appliances. no change in layout. see permitDetails
repairs to main level and lower level due to water damage. patch drywall on both levels. replace tile in bathroom on main level. replace walk in shower in lower level, reinstall 3 toilets, 2 vanity sinks. replace countertops in kitchen, re-install sink and appliances. no change in layout. see permit | $52,000 |
| Jun 20, 2025 | Completed final sign-off Oct 2025 | 121 Shields St | Bay Metro Corporation | repair interior finishes on main level due to water damage. new drywall in living, dining rooms, bathroom,hallway, partial kitchen. new plumbing fixtures in bathroom,toilet,sink, bathtub same location. new electrical wiring in bathroom. replace countertops & sink in kitchen. no layout changes.Details
repair interior finishes on main level due to water damage. new drywall in living, dining rooms, bathroom,hallway, partial kitchen. new plumbing fixtures in bathroom,toilet,sink, bathtub same location. new electrical wiring in bathroom. replace countertops & sink in kitchen. no layout changes. | $30,000 |
| May 16, 2025 | Completed final sign-off Jul 2025 | 30 Sanchez St | Bay Metro Corporation | remove and replace front exterior window sashes at (5) openings on upper level to match existing wood kind.Details
remove and replace front exterior window sashes at (5) openings on upper level to match existing wood kind. | $10,000 |
| Feb 28, 2025 | Completed final sign-off Jul 2025 | 760 Darien Wy | Bay Metro Corporation | kitchen remodel (n) cabinets, tile, floor, plumbing, electrical and reinstall (n) sink, bar sink, appliances in the same location. replace 3 (n) windows facing side of house not visible from streetDetails
kitchen remodel (n) cabinets, tile, floor, plumbing, electrical and reinstall (n) sink, bar sink, appliances in the same location. replace 3 (n) windows facing side of house not visible from street | $25,000 |
| Feb 28, 2025 | Completed final sign-off May 2025 | 374 27th Av | Bay Metro Corporation | repair 12sf of drywall in kitchen due to water damage. reinstall 3 (e) kitchen cabinets, replace hardwood flooring in kitchenDetails
repair 12sf of drywall in kitchen due to water damage. reinstall 3 (e) kitchen cabinets, replace hardwood flooring in kitchen | $7,000 |
| Dec 19, 2024 | Completed final sign-off Feb 2025 | 1384 08th Av | Bay Metro Corporation | fire damage to water closet. no structural damage. need new drywall, repair wiring in bathroom, window replacement (not street visible), new toilet and plumbing in half bath only.Details
fire damage to water closet. no structural damage. need new drywall, repair wiring in bathroom, window replacement (not street visible), new toilet and plumbing in half bath only. | $10,000 |
| Sep 12, 2024 | Completed final sign-off Nov 2024 | 1651 38th Av | Bay Metro Corporation | repair 3' x 8' section of exterior wall framing at closet due to fire damage. replace drywall and insulation on ceiling & portial walls in bedroom. in kind repair use 5/8" type x at pl wall.Details
repair 3' x 8' section of exterior wall framing at closet due to fire damage. replace drywall and insulation on ceiling & portial walls in bedroom. in kind repair use 5/8" type x at pl wall. | $20,000 |
| Aug 22, 2024 | Completed final sign-off Jan 2025 | 262 Mangels Av | Bay Metro Corporation | to comply with nov 20313134 for housing insp. replace 3 windows on ground fl. and bedrooms repair the water damaged kitchen sink cabinet, remove mold/mildew in cabinet, lean ceiling ventilation fan replace cover on screen demo stairs in back yardDetails
to comply with nov 20313134 for housing insp. replace 3 windows on ground fl. and bedrooms repair the water damaged kitchen sink cabinet, remove mold/mildew in cabinet, lean ceiling ventilation fan replace cover on screen demo stairs in back yard | $10,000 |
| Aug 22, 2024 | Completed final sign-off Jan 2025 | 262 Mangels Av | Bay Metro Corporation | to comply with nov 202313645 for pid reinstall garage furnace and venting by code, reinstall tank water heater and venting by code, reinstall ground level laundry and bathrooom fixtures. efficiency shall meet 2022 cenc. provide combustion air per cmc ch.7. gas vent per cmc802.6 & sfmc 802.6.2.Details
to comply with nov 202313645 for pid reinstall garage furnace and venting by code, reinstall tank water heater and venting by code, reinstall ground level laundry and bathrooom fixtures. efficiency shall meet 2022 cenc. provide combustion air per cmc ch.7. gas vent per cmc802.6 & sfmc 802.6.2. | $15,000 |
| May 24, 2024 | Completed final sign-off Sep 2024 | 2823 35th Av | Bay Metro Corporation | bathroom remodel: replace shower & fixture at (e) location, remove bathtub & non bearing wall between water closet, replace sink & toilet, rewire electrical & replace lighting in bathroom, new tile & drywall in bathroom.Details
bathroom remodel: replace shower & fixture at (e) location, remove bathtub & non bearing wall between water closet, replace sink & toilet, rewire electrical & replace lighting in bathroom, new tile & drywall in bathroom. | $35,000 |
| May 1, 2024 | Completed final sign-off Sep 2024 | 735 Madrid St | Bay Metro Corporation | full bathroom remodel - new shower pan, new faucets, toilet, vanity sink, new fan, new drywall and tile in (e) locations. non structural.Details
full bathroom remodel - new shower pan, new faucets, toilet, vanity sink, new fan, new drywall and tile in (e) locations. non structural. | $25,000 |
| Mar 22, 2024 | Completed final sign-off Apr 2025 | 537 Vermont St | Bay Metro Corporation | to comply w nov 202311653. restoration for existing single family damaged by fire. roof and ext wall in rear needs to be rapiared. int is gutted and needs to be rebuilt like for like with new electrical, plumbing and gyp walls. new windows in existing openings, new appliances & fixtures. new bath.Details
to comply w nov 202311653. restoration for existing single family damaged by fire. roof and ext wall in rear needs to be rapiared. int is gutted and needs to be rebuilt like for like with new electrical, plumbing and gyp walls. new windows in existing openings, new appliances & fixtures. new bath. | $20,000 |
| Mar 11, 2024 | Completed final sign-off Aug 2024 | 760 Darien Wy | Bay Metro Corporation | remodel bathroom. rewire lighting and new exhaust fan. new shoer pan, install new tub, toilet, sink, and shower fixtures at existing locations. install new window facing side exterior at existing location. replace drywall at walls and ceiling. approx 96 sq ft , no moving wallsDetails
remodel bathroom. rewire lighting and new exhaust fan. new shoer pan, install new tub, toilet, sink, and shower fixtures at existing locations. install new window facing side exterior at existing location. replace drywall at walls and ceiling. approx 96 sq ft , no moving walls | $22,000 |
| Sep 15, 2023 | Completed final sign-off Oct 2023 | 169 Peabody St | Bay Metro Corporation | replace drywall and insulation on ceilings throughout main level due to abatement about 900 sq ft.Details
replace drywall and insulation on ceilings throughout main level due to abatement about 900 sq ft. | $10,000 |
| Sep 5, 2023 | Never finaled issued Sep 2023, no final | 535 Burnett Av | Bay Metro Corporation | #3: bathroom remodel due to water damage in same location, new shower pan, new vanity, toilet & tile. new fixtures. new fan & lights.Details
#3: bathroom remodel due to water damage in same location, new shower pan, new vanity, toilet & tile. new fixtures. new fan & lights. | $25,000 |
| Aug 2, 2023 | Completed final sign-off Aug 2024 | 2074 42nd Av | Bay Metro Corporation | comply with nov#202303129.replace all interior finishes to match existing layout due to fire damage.repair affected raming & stucco @ front & ride wall per structural plans due to fire damage.replace 2 front windows to match(e),replace roof to match existing.Details
comply with nov#202303129.replace all interior finishes to match existing layout due to fire damage.repair affected raming & stucco @ front & ride wall per structural plans due to fire damage.replace 2 front windows to match(e),replace roof to match existing. | $200,000 |
| Jul 24, 2023 | Completed final sign-off Nov 2023 | 273 28th St | Bay Metro Corporation | water damage to kitchen cabinets, repair drywall in kitchen, dining, lower family room & bedroom, reinstall sink, facet. approx 350 sqft of drywall replacement- no structural work no framing modificationDetails
water damage to kitchen cabinets, repair drywall in kitchen, dining, lower family room & bedroom, reinstall sink, facet. approx 350 sqft of drywall replacement- no structural work no framing modification | $30,000 |
| Jun 7, 2023 | Completed final sign-off Nov 2023 | 1339 22nd Av | Bay Metro Corporation | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $40,000 |
| Mar 22, 2023 | Completed final sign-off May 2023 | 2685 23rd Av | Bay Metro Corporation | to comply w/bid nov#202304664 dated 3/5/2023, repair (e) nonstructural wall between garage/family room due to vehicle impact. repair plumbing for laundry & sing, affected (e) electrical outlets/switchDetails
to comply w/bid nov#202304664 dated 3/5/2023, repair (e) nonstructural wall between garage/family room due to vehicle impact. repair plumbing for laundry & sing, affected (e) electrical outlets/switch | $20,000 |
| Mar 6, 2023 | Completed final sign-off May 2023 | 475 Jersey St | Bay Metro Corporation | remodel bathroom on main level. replace bathtub, relocate sink, remove shower, replace drywall & tile.Details
remodel bathroom on main level. replace bathtub, relocate sink, remove shower, replace drywall & tile. | $25,000 |
| Aug 4, 2022 | Completed final sign-off Apr 2023 | 2011 Powell St | Bay Metro Corporation | replace drywall in kitchen do to water damage . install new kitchen cabinets, sinks, appliancesDetails
replace drywall in kitchen do to water damage . install new kitchen cabinets, sinks, appliances | $35,000 |
| Jun 29, 2022 | Never finaled issued Jun 2022, no final | 1023 Church St | Bay Metro Corporation | unit #1: rewire kitchen. replace kitchen cabinets & drywall. new appliances. in kind. no removal of wallsDetails
unit #1: rewire kitchen. replace kitchen cabinets & drywall. new appliances. in kind. no removal of walls | $15,000 |
| May 24, 2022 | Completed final sign-off Oct 2022 | 535 Spruce St | Bay Metro Corporation | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $20,000 |
| Apr 1, 2022 | Completed final sign-off May 2022 | 1001 Pine St | Bay Metro Corporation | unit 203: replace bathtub, shower faucet, and vanity sink at existing location. new tile and painting walls and floor.Details
unit 203: replace bathtub, shower faucet, and vanity sink at existing location. new tile and painting walls and floor. | $15,000 |
| Feb 18, 2022 | Completed final sign-off Mar 2022 | 1743 46th Av | Bay Metro Corporation | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $12,000 |
| Dec 20, 2021 | Completed final sign-off Mar 2022 | 1220 Jones St | Bay Metro Corporation | apt 401: water damage. repair of sheetrock in bedroom, hallway & guest bathroom. replace fixturs in 2 bathrooms. replace counter & sink in master bathroom. bathroom remodel inkind.Details
apt 401: water damage. repair of sheetrock in bedroom, hallway & guest bathroom. replace fixturs in 2 bathrooms. replace counter & sink in master bathroom. bathroom remodel inkind. | $25,000 |
| Nov 24, 2021 | Completed final sign-off Jan 2022 | 1099 23rd St | Bay Metro Corporation | #4 -remodel bathroom in-kind. replace bathrub, shower valve & tile bathrub surround & floor. replace vanity & toilet. no removal of wallsDetails
#4 -remodel bathroom in-kind. replace bathrub, shower valve & tile bathrub surround & floor. replace vanity & toilet. no removal of walls | $18,000 |
| Nov 18, 2021 | Completed final sign-off Jan 2023 | 342 Miramar Av | B. Uniacke Construction, Bay Metro Corporation | remodel kitchen & (e) master bathroom in-kind. remodel guest bathroom and add shower (relocate non-structural wall between closet)Details
remodel kitchen & (e) master bathroom in-kind. remodel guest bathroom and add shower (relocate non-structural wall between closet) | $55,000 |
| Aug 4, 2021 | Completed final sign-off Jan 2022 | 2218 44th Av | Bay Metro Corporation | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $25,000 |
| Jan 12, 2021 | Completed final sign-off Jan 2021 | 305 Harkness Av | Bay Metro Corporation | repair 4'x8'section if wood siding at rear exterior due to fire damage, no structural repairsDetails
repair 4'x8'section if wood siding at rear exterior due to fire damage, no structural repairs | $6,000 |
| Jan 12, 2021 | Completed final sign-off Mar 2021 | 323 Harkness Av | Bay Metro Corporation | install rough framing, electrical and plumbing connection, for replacement gas fireplace at (e) wood fireplaces location, size box 84"-w, 96"h, 26'deepDetails
install rough framing, electrical and plumbing connection, for replacement gas fireplace at (e) wood fireplaces location, size box 84"-w, 96"h, 26'deep | $7,000 |
| Dec 15, 2020 | Completed final sign-off Jun 2021 | 535 Spruce St | Bay Metro Corporation | remodel 2 bathrooms, same layout as existing. install new subpanel in garage.Details
remodel 2 bathrooms, same layout as existing. install new subpanel in garage. | $35,000 |
| Nov 23, 2020 | Completed final sign-off Oct 2021 | 33 Collingwood St | Bay Metro Corporation | interior remodel including 2 bathrooms and a laundry closet. new fixtures and finishes throughout. adjust/relocate some interior wall and fixture locations.Details
interior remodel including 2 bathrooms and a laundry closet. new fixtures and finishes throughout. adjust/relocate some interior wall and fixture locations. | $60,000 |
| Aug 4, 2020 | Never finaled issued Aug 2020, no final | 1262 Jackson St | Bay Metro Corporation | street spaceDetails
street space | |
| Aug 4, 2020 | Completed final sign-off Oct 2020 | 1862 Ellis St | Bay Metro Corporation | apt c: replace (e) kitchen (10x10) cabinets in (e) locations, relocate gas shut-fff, replace kitchen sink.Details
apt c: replace (e) kitchen (10x10) cabinets in (e) locations, relocate gas shut-fff, replace kitchen sink. | $15,000 |
| Jul 21, 2020 | Completed final sign-off Mar 2021 | 1262 Jackson St | Bay Metro Corporation | kitchen (10x10) & bathroom (5x6) & 1/2 bathroom remodel, new electrical subpanel, new iwring from kitchen and bathroom, new cabinets, new plumbing, new fixtures, new drywall in working arean, new toilets in bathroom & water closet, new lighting.Details
kitchen (10x10) & bathroom (5x6) & 1/2 bathroom remodel, new electrical subpanel, new iwring from kitchen and bathroom, new cabinets, new plumbing, new fixtures, new drywall in working arean, new toilets in bathroom & water closet, new lighting. | $49,000 |
| Jul 7, 2020 | Never finaled issued Jul 2020, no final | 269 27th St | Bay Metro Corporation | street spaceDetails
street space | |
| Jul 6, 2020 | Completed final sign-off Sep 2020 | 490 34th Av | Bay Metro Corporation | apt 302 aka apt 7: kitchen remodel (5x10), new electrical panel, new cabinets new applicants, new countertop.Details
apt 302 aka apt 7: kitchen remodel (5x10), new electrical panel, new cabinets new applicants, new countertop. | $20,000 |
| Mar 4, 2020 | Completed final sign-off Jan 2021 | 269 27th St | Bay Metro Corporation | comply with 201990961 repair interior fire damage. non structural repairs. replace drywall throughout. rewire affected electrical wiring. replace kitchen and bath cabinets, tile, fixtures. replace furnace and ducting water heater. new windows to match existing front dual clad or woodDetails
comply with 201990961 repair interior fire damage. non structural repairs. replace drywall throughout. rewire affected electrical wiring. replace kitchen and bath cabinets, tile, fixtures. replace furnace and ducting water heater. new windows to match existing front dual clad or wood | $80,000 |
| Jan 6, 2020 | Completed final sign-off Jun 2020 | 490 34th Av | Bay Metro Corporation | repair drywall in bath, entry hallway and closet due to water damage. replace shower surround, sink, vanity and toiletDetails
repair drywall in bath, entry hallway and closet due to water damage. replace shower surround, sink, vanity and toilet | $18,000 |
| Jan 6, 2020 | Completed final sign-off May 2020 | 1322 48th Av | Bay Metro Corporation | remodel bath 35 sq f replace shoer surround, toilet, sink in e locations, new echaust fan, light fixtures in bath. replace elec panel in garageDetails
remodel bath 35 sq f replace shoer surround, toilet, sink in e locations, new echaust fan, light fixtures in bath. replace elec panel in garage | $25,000 |
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 1574 32nd Av | Bay Metro Corporation | revision to pa 2019-0809-8454 frame & install 3 new skylightsDetails
revision to pa 2019-0809-8454 frame & install 3 new skylights | |
| Sep 17, 2019 | Completed final sign-off Feb 2020 | 135 Monterey Bl | Bay Metro Corporation | repair water damage to partial affected drywall upper and lower level, replace kitchen cabinets, shower tile, replace upstair bathtub surround tile, replace bathrub in lower level reinstall plumbing fixtures. no change on walls.Details
repair water damage to partial affected drywall upper and lower level, replace kitchen cabinets, shower tile, replace upstair bathtub surround tile, replace bathrub in lower level reinstall plumbing fixtures. no change on walls. | $20,000 |
| Aug 9, 2019 | Completed final sign-off May 2020 | 1574 32nd Av | Bay Metro Corporation | fire damage repair, replace 3 rafters, 6 joist, roof sheathing portion in master bedroom, repair new drywall, new windows (face back yard), portion siding replacement on back, new floor, paint, reinstall 2 bathrooms, & kitchen cabinets & appliancesDetails
fire damage repair, replace 3 rafters, 6 joist, roof sheathing portion in master bedroom, repair new drywall, new windows (face back yard), portion siding replacement on back, new floor, paint, reinstall 2 bathrooms, & kitchen cabinets & appliances | $85,000 |
| Jul 31, 2019 | Completed final sign-off Oct 2019 | 1339 22nd Av | Bay Metro Corporation | repair damage to front exterior stucco due to auto damage. repair in kindDetails
repair damage to front exterior stucco due to auto damage. repair in kind | $15,000 |
| Jun 4, 2019 | Completed final sign-off Jul 2019 | 52 Wabash Tr | Bay Metro Corporation | limited stair framing repair and stucco replacement to match existing texture (not smooth) due to auto crash. no other work. stud replacement will be limited to no more than 3 studs in-kind replacement, otherwise, drawings is required to show the extension of repair work, finish to match existing.Details
limited stair framing repair and stucco replacement to match existing texture (not smooth) due to auto crash. no other work. stud replacement will be limited to no more than 3 studs in-kind replacement, otherwise, drawings is required to show the extension of repair work, finish to match existing. | $13,000 |
| May 21, 2019 | Completed final sign-off Dec 2019 | 1310 Funston Av | Bay Metro Corporation | to comply with nov 201800181 fire damage repair, new: drywall, all windows (front windows to be alum-clad,inter-wood), flooring, paint. roof repair stucco & siding reapir as is. add full bathroom downstairs and entertain,ent roomDetails
to comply with nov 201800181 fire damage repair, new: drywall, all windows (front windows to be alum-clad,inter-wood), flooring, paint. roof repair stucco & siding reapir as is. add full bathroom downstairs and entertain,ent room | $70,000 |
| Apr 4, 2019 | Completed final sign-off Aug 2019 | 1030 Noe St | Bay Metro Corporation | repair partial drywall in kitchen due to water damage, install new cabinets, new sink & faucet, garbage disposal & dishwasher at existing locations.Details
repair partial drywall in kitchen due to water damage, install new cabinets, new sink & faucet, garbage disposal & dishwasher at existing locations. | $12,000 |
| Jan 7, 2019 | Completed final sign-off Apr 2019 | 2212 15th Av | Bay Metro Corporation | remodel kitchen: new cabinets, new appliances, new tile work, new plumbing and elcetrical. new insalation and drywall. 12x15=180 sq ft.Details
remodel kitchen: new cabinets, new appliances, new tile work, new plumbing and elcetrical. new insalation and drywall. 12x15=180 sq ft. | $30,000 |
| Dec 3, 2018 | Completed final sign-off Mar 2019 | 1259 Oak St | Bay Metro Corporation | apt 4: remodel (e) bathroom: new shower ,van ity, fan, toilet, and tile. new fixtures.Details
apt 4: remodel (e) bathroom: new shower ,van ity, fan, toilet, and tile. new fixtures. | $18,000 |
| Nov 13, 2018 | Completed final sign-off Dec 2018 | 2212 15th Av | Bay Metro Corporation | lightwell patio repair 3'x10', waterproofing and roofing, drain and venting replacingDetails
lightwell patio repair 3'x10', waterproofing and roofing, drain and venting replacing | $10,000 |
| Oct 24, 2018 | Completed final sign-off Dec 2018 | 55 Southwood Dr | Bay Metro Corporation | remodel existing bathroom, replace in same location. drywall, tile, tub, toilet, sink, exhaust fan. 5.5'x8'Details
remodel existing bathroom, replace in same location. drywall, tile, tub, toilet, sink, exhaust fan. 5.5'x8' | $20,000 |
| Oct 3, 2018 | Completed final sign-off Apr 2019 | 426 Moscow St | Bay Metro Corporation | replace drywall and cabinets in kitchen. relocate gas line for oven. remodel kitchen (80 sqft)Details
replace drywall and cabinets in kitchen. relocate gas line for oven. remodel kitchen (80 sqft) | $25,000 |
| Aug 28, 2018 | Completed final sign-off Dec 2018 | 333 Ortega St | Bay Metro Corporation | replace drywall in lower utility room, approx 160 sq. ft., 5/8 fire tap x gyp:bd; remove/replace furnace & heater ducting due to smoke damage, repair electrical wiring in lower utility room, remove/replace hot water heaterDetails
replace drywall in lower utility room, approx 160 sq. ft., 5/8 fire tap x gyp:bd; remove/replace furnace & heater ducting due to smoke damage, repair electrical wiring in lower utility room, remove/replace hot water heater | $20,000 |
| Aug 20, 2018 | Completed final sign-off Oct 2018 | 72 28th St | Bay Metro Corporation | fire damage repair, new siding back wall about 100 sq. ft., wood back porch repair about 40 sq. ft., repair back fence aout 10 l.ft.; work not visible from streetDetails
fire damage repair, new siding back wall about 100 sq. ft., wood back porch repair about 40 sq. ft., repair back fence aout 10 l.ft.; work not visible from street | $15,000 |
| Aug 15, 2018 | Completed final sign-off Dec 2018 | 3509 16th St | Bay Metro Corporation | bathroom remodel: new shower, new sink, toilet, new tile surrounding and new fixtures.Details
bathroom remodel: new shower, new sink, toilet, new tile surrounding and new fixtures. | $18,000 |
| May 17, 2018 | Completed final sign-off Aug 2018 | 2455 33rd Av | Bay Metro Corporation | remodel (e) bathroom: new tub, tilet, sink, fixtures, new tile, upgrade plumbing & electrical.Details
remodel (e) bathroom: new tub, tilet, sink, fixtures, new tile, upgrade plumbing & electrical. | $25,000 |
| Apr 6, 2018 | Completed final sign-off Jul 2018 | 970 Duncan St | Bay Metro Corporation | kitchen remodel new cabinets in same location 7x7 sizeDetails
kitchen remodel new cabinets in same location 7x7 size | $16,000 |
| Mar 27, 2018 | Completed final sign-off May 2018 | 1363 Goettingen St | Bay Metro Corporation | to comply with nov 201848401. car accident, impact into house. small damage repair framing, stucco & siding, entry gate repair.Details
to comply with nov 201848401. car accident, impact into house. small damage repair framing, stucco & siding, entry gate repair. | $15,000 |
| Dec 27, 2017 | Completed final sign-off May 2018 | 458 09th Av | Bay Metro Corporation | unit e: fire damaged. new drywall, hardwood floor, electrical, plumbing, aint. no bathroom, siding repair about 70 sq ft, partial roof repair. no structural damaged, framing.Details
unit e: fire damaged. new drywall, hardwood floor, electrical, plumbing, aint. no bathroom, siding repair about 70 sq ft, partial roof repair. no structural damaged, framing. | $40,000 |
| Nov 14, 2017 | Completed final sign-off Mar 2018 | 713 San Bruno Av | Bay Metro Corporation | lower unit bathroom remodel - relocate tub & vanity, new fixtures & tile.Details
lower unit bathroom remodel - relocate tub & vanity, new fixtures & tile. | $25,000 |
| Oct 13, 2017 | Completed final sign-off Jan 2018 | 55 Rutledge St | Bay Metro Corporation | one bathroom remodel, new tub, shower fixtures, vanity, sink, faucet. reinstall toilet in (e) location. new drywall, tile, light fixturesDetails
one bathroom remodel, new tub, shower fixtures, vanity, sink, faucet. reinstall toilet in (e) location. new drywall, tile, light fixtures | $25,000 |
| Aug 31, 2017 | Completed final sign-off Nov 2017 | 1242 Sanchez St | Bay Metro Corporation | remodel bathroom: new tub, vanity, sink, lighting,shower fixtures, toilet. lighting in w/c. new tile walls & floor.Details
remodel bathroom: new tub, vanity, sink, lighting,shower fixtures, toilet. lighting in w/c. new tile walls & floor. | $22,000 |
| Aug 31, 2017 | Completed final sign-off Dec 2017 | 1587 34th Av | Bay Metro Corporation | replace tile and mortar on exterior lightwell patio courtyard. new waterprofing and tile.Details
replace tile and mortar on exterior lightwell patio courtyard. new waterprofing and tile. | $10,000 |
| Jul 21, 2017 | Completed final sign-off Oct 2017 | 95 Red Rock Wy | Bay Metro Corporation | repair partial drywall in kitchen and bath due to water damage. reinstall existing cabinets, new kitchen sink, faucet, reinstall bath sinkDetails
repair partial drywall in kitchen and bath due to water damage. reinstall existing cabinets, new kitchen sink, faucet, reinstall bath sink | $5,000 |
| Jun 2, 2017 | Completed final sign-off Dec 2017 | 119 Randall St | Bay Metro Corporation | replace front windows with wood, double-hung windows, visible from street. replace rear bedrooms & kitchen aluminium windows with vincyle (10); u-factor 0.fire damange repair: replace interior drywall throughout upper level, rewire interior electriccal, replace kitchen cabinets, sink, faucet & d/w.Details
replace front windows with wood, double-hung windows, visible from street. replace rear bedrooms & kitchen aluminium windows with vincyle (10); u-factor 0.fire damange repair: replace interior drywall throughout upper level, rewire interior electriccal, replace kitchen cabinets, sink, faucet & d/w. | $45,000 |
| Jun 2, 2017 | Completed final sign-off Dec 2017 | 22 Seal Rock Dr | Bay Metro Corporation | bathroom remodel area to 2 bathrooms. construct closet at bedroom, kitchen remodel(new cabinets, range, sink, hood) new sink in laundry area and drain repair.Details
bathroom remodel area to 2 bathrooms. construct closet at bedroom, kitchen remodel(new cabinets, range, sink, hood) new sink in laundry area and drain repair. | $50,000 |
| May 17, 2017 | Completed final sign-off Aug 2017 | 22 Seal Rock Dr | Bay Metro Corporation | replace 10 windows (3 in front), (7 at back).Details
replace 10 windows (3 in front), (7 at back). | $9,000 |
| May 16, 2017 | Completed final sign-off Sep 2017 | 850 Corbett Av | Bay Metro Corporation | replace drywall in dining room, 150 sq. ft and kitchen due to water damage, 100 sq. ft. replace kitchen cabinets, re-install sink, dishwasher, range. washer and dryer to existing plumbing. all work to match previous (e) layout. no moving of framing, doors or windows.Details
replace drywall in dining room, 150 sq. ft and kitchen due to water damage, 100 sq. ft. replace kitchen cabinets, re-install sink, dishwasher, range. washer and dryer to existing plumbing. all work to match previous (e) layout. no moving of framing, doors or windows. | $25,000 |
| Apr 13, 2017 | Completed final sign-off Oct 2017 | 426 Linden St | Bay Metro Corporation | replace kitchen cabinets, sink, rewire electrical per code; replace bathroom fixtures, relocate sink, rewire electrical per code; (e) floor plan to remain as is.Details
replace kitchen cabinets, sink, rewire electrical per code; replace bathroom fixtures, relocate sink, rewire electrical per code; (e) floor plan to remain as is. | $35,000 |
| Apr 13, 2017 | Completed final sign-off Jun 2017 | 2240 19th St | Bay Metro Corporation | replace kitchen cabinets, sink, rewire electrical per code, (e) floor lan to remain as is.Details
replace kitchen cabinets, sink, rewire electrical per code, (e) floor lan to remain as is. | $25,000 |
| Mar 31, 2017 | Completed final sign-off Aug 2017 | 55 Rutledge St | Bay Metro Corporation | drywall repair after water damage in kitchen and bathroom, repair in-kind. remodel kitchen and 1 1/2 bathsDetails
drywall repair after water damage in kitchen and bathroom, repair in-kind. remodel kitchen and 1 1/2 baths | $40,000 |
| Sep 20, 2016 | Completed final sign-off Dec 2016 | 190 Montana St | Bay Metro Corporation | replace drywall in rear bedroom, replace sliding door in bedroom due to smoke damageDetails
replace drywall in rear bedroom, replace sliding door in bedroom due to smoke damage | $10,000 |
| Jul 26, 2016 | Completed final sign-off Oct 2016 | 300 Sanchez St | Bay Metro Corporation | construct partition walls at reception area. remodel toilet room to full ada complianceDetails
construct partition walls at reception area. remodel toilet room to full ada compliance | $60,000 |
| Jun 30, 2016 | Completed final sign-off Aug 2016 | 135 Scott St | Bay Metro Corporation | bathroom remodel in (e) location. replace tub for shower pan. work in 135 scott st. onlyDetails
bathroom remodel in (e) location. replace tub for shower pan. work in 135 scott st. only | $15,000 |
| Jun 23, 2016 | Completed final sign-off Oct 2016 | 1326 Utah St | Bay Metro Corporation | reivision to permit # 201603243011. installation 6 windows on back side house,not visible from the streetDetails
reivision to permit # 201603243011. installation 6 windows on back side house,not visible from the street | $7,000 |
| May 2, 2016 | Completed final sign-off Sep 2016 | 1721 Clement St | Bay Metro Corporation | exterior 2/f stair landing at rear repair.Details
exterior 2/f stair landing at rear repair. | $9,000 |
| Mar 24, 2016 | Completed final sign-off Nov 2016 | 1326 Utah St | Bay Metro Corporation | remove an (e) bearing wall on 3rd floor unit between kitchen & living room, bvetween dining & living room; remodel 2 bathrooms and kitchen in same location and new drywall for unit, new laundry room.Details
remove an (e) bearing wall on 3rd floor unit between kitchen & living room, bvetween dining & living room; remodel 2 bathrooms and kitchen in same location and new drywall for unit, new laundry room. | $8,000 |
| Feb 19, 2016 | Completed final sign-off Apr 2016 | 50 Southwood Dr | Bay Metro Corporation | bathroom remodel: new tub, valve, vanity, toilet, new tile in (e) location.Details
bathroom remodel: new tub, valve, vanity, toilet, new tile in (e) location. | $16,000 |
| Feb 1, 2016 | Completed final sign-off Mar 2016 | 2286 26th Av | Bay Metro Corporation | stucco repair & framing repair due to vehicle impact damage,new garage door, 12 sqf in kind repair, replacement in "like-kind'. repair of damage only.Details
stucco repair & framing repair due to vehicle impact damage,new garage door, 12 sqf in kind repair, replacement in "like-kind'. repair of damage only. | $7,000 |
| Jan 15, 2016 | Completed final sign-off Feb 2016 | 50 Southwood Dr | Bay Metro Corporation | add new water closet in existing closetDetails
add new water closet in existing closet | $3,000 |
| Dec 30, 2015 | Completed final sign-off Mar 2016 | 129 Hugo St | Bay Metro Corporation | kitchen remodel, no new framing , new cabinets, electrical update plumming update , new appliances.Details
kitchen remodel, no new framing , new cabinets, electrical update plumming update , new appliances. | $17,000 |
| Dec 10, 2015 | Completed final sign-off Jan 2016 | 4136 Folsom St | Bay Metro Corporation | in-kind stucco repair and metal gate repair at front facade due to damagae from auto accidentDetails
in-kind stucco repair and metal gate repair at front facade due to damagae from auto accident | $5,000 |
| Nov 19, 2015 | Completed final sign-off Dec 2015 | 795 08th Av | Bay Metro Corporation | unit 302: replace kitchen cabinets due to water damage, same size, same location.Details
unit 302: replace kitchen cabinets due to water damage, same size, same location. | $6,000 |
| Oct 28, 2015 | Completed final sign-off Feb 2016 | 1721 Clement St | Bay Metro Corporation | fire damage repair 9e) siding about 80sq ft, framing 2 joists, 4 studs, demo and re-install dyrwall. all job in garage area. demo drywall, kitchen & bathroom unit #2 (smoke damage) unit 31. demo bathroom drywll (smoke damage. reinstall inkindDetails
fire damage repair 9e) siding about 80sq ft, framing 2 joists, 4 studs, demo and re-install dyrwall. all job in garage area. demo drywall, kitchen & bathroom unit #2 (smoke damage) unit 31. demo bathroom drywll (smoke damage. reinstall inkind | $50,000 |
| Oct 19, 2015 | Completed final sign-off Nov 2015 | 234 Eureka St | Bay Metro Corporation | replace siding and related trim under porch landing out to right side of bldg and at front 2 windows over garage. paint to match existing color. about 130 sf. wood cove siding.Details
replace siding and related trim under porch landing out to right side of bldg and at front 2 windows over garage. paint to match existing color. about 130 sf. wood cove siding. | $5,000 |
| Oct 14, 2015 | Completed final sign-off Dec 2015 | 960 Chenery St | Bay Metro Corporation | replace 7 front windows in clad wood/fiberglassDetails
replace 7 front windows in clad wood/fiberglass | $5,000 |
| Aug 24, 2015 | Completed final sign-off Oct 2015 | 63 Maddux Av | Bay Metro Corporation | replace kitchen cabinets, countertop, new electrical, plumbing. same location. no walls to moved. no structural work.Details
replace kitchen cabinets, countertop, new electrical, plumbing. same location. no walls to moved. no structural work. | $16,000 |
| Jul 15, 2015 | Never finaled issued Jul 2015, no final | 960 Chenery St | Bay Metro Corporation | inkind repair (less than 50% of stucco on back portion of railing and concrete flooring on front porch. no bbns or open pc codeenforcment cases.Details
inkind repair (less than 50% of stucco on back portion of railing and concrete flooring on front porch. no bbns or open pc codeenforcment cases. | $20,000 |
| Jun 22, 2015 | Completed final sign-off Jul 2015 | 28 Hopkins Av | Bay Metro Corporation | dryrot repair about 40sf (sheeting dry rot). new stucco about 100sf in-kind replacement.Details
dryrot repair about 40sf (sheeting dry rot). new stucco about 100sf in-kind replacement. | $7,500 |
| Apr 6, 2015 | Completed final sign-off Oct 2015 | 50 Southwood Dr | Bay Metro Corporation | revision to app#201501266627. demo closet, move door opening different location, move oven and hood different location.Details
revision to app#201501266627. demo closet, move door opening different location, move oven and hood different location. | $7,000 |
| Jan 26, 2015 | Completed final sign-off Oct 2015 | 50 Southwood Dr | Bay Metro Corporation | kitchen remodel, new cabinets, new appliances; same location, no walls moved, removed or added. all layouts to remain unchanged.Details
kitchen remodel, new cabinets, new appliances; same location, no walls moved, removed or added. all layouts to remain unchanged. | $20,000 |
| Jan 9, 2015 | Completed final sign-off Mar 2015 | 1242 Sanchez St | Bay Metro Corporation | remove & replace kitchen cabinets, ceiling drwall & light fixtures in kitchen. layout to remain as existing.Details
remove & replace kitchen cabinets, ceiling drwall & light fixtures in kitchen. layout to remain as existing. | $20,000 |