Block 3189, lot 010
50 Southwood Dr
- City’s use
- Single Family Residential
- Built
- 1921
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 1,296 sq ft
- Lot
- 3,066 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 21, 2016 | Completed final sign-off Apr 2016 | 50 Southwood Dr | replace garage door inkind with steel door with windowss.Details
replace garage door inkind with steel door with windowss. | $1,700 | |
| Feb 19, 2016 | Completed final sign-off Apr 2016 | 50 Southwood Dr | Bay Metro Corporation | bathroom remodel: new tub, valve, vanity, toilet, new tile in (e) location.Details
bathroom remodel: new tub, valve, vanity, toilet, new tile in (e) location. | $16,000 |
| Jan 15, 2016 | Completed final sign-off Feb 2016 | 50 Southwood Dr | Bay Metro Corporation | add new water closet in existing closetDetails
add new water closet in existing closet | $3,000 |
| Oct 26, 2015 | Never finaled issued Oct 2015, no final | 50 Southwood Dr | street space permitDetails
street space permit | ||
| Apr 6, 2015 | Completed final sign-off Oct 2015 | 50 Southwood Dr | Bay Metro Corporation | revision to app#201501266627. demo closet, move door opening different location, move oven and hood different location.Details
revision to app#201501266627. demo closet, move door opening different location, move oven and hood different location. | $7,000 |
| Jan 26, 2015 | Completed final sign-off Oct 2015 | 50 Southwood Dr | Bay Metro Corporation | kitchen remodel, new cabinets, new appliances; same location, no walls moved, removed or added. all layouts to remain unchanged.Details
kitchen remodel, new cabinets, new appliances; same location, no walls moved, removed or added. all layouts to remain unchanged. | $20,000 |
| Apr 2, 2012 | Completed final sign-off Oct 2012 | 50 Southwood Dr | Sean Rattigan Construction | adding approx. 40 threaded 5/8" rods with epoxy and 1/4 x 3 x 3 square washers to sill plates in foundation, voluntary strengthing min. embedrod 7" min. 2 pcs.Details
adding approx. 40 threaded 5/8" rods with epoxy and 1/4 x 3 x 3 square washers to sill plates in foundation, voluntary strengthing min. embedrod 7" min. 2 pcs. | $3,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay Metro Corporation (4), Sean Rattigan Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.