Block 6075, lot 002
426 Moscow St
- City’s use
- Single Family Residential
- Built
- 1927
- Stories
- 2
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,450 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 19, 2018 | Never finaled issued Dec 2018, no final | 426 Moscow St | street spaceDetails
street space | ||
| Oct 24, 2018 | Never finaled issued Oct 2018, no final | 426 Moscow St | street spaceDetails
street space | ||
| Oct 3, 2018 | Completed final sign-off Apr 2019 | 426 Moscow St | Bay Metro Corporation | replace drywall and cabinets in kitchen. relocate gas line for oven. remodel kitchen (80 sqft)Details
replace drywall and cabinets in kitchen. relocate gas line for oven. remodel kitchen (80 sqft) | $25,000 |
| Oct 29, 2009 | Completed final sign-off Feb 2010 | 426 Moscow St | Dolan Construction | demo interior wall board. install anew shower fixtures, new sink, toilet, exhaust vent, tile floor and tus surraund walls. (work in bathroom only).Details
demo interior wall board. install anew shower fixtures, new sink, toilet, exhaust vent, tile floor and tus surraund walls. (work in bathroom only). | $9,000 |
| Oct 16, 2009 | Never finaled issued Oct 2009, no final | 426 Moscow St | Dolan Construction | demo all interior wall board/remove existing shower stall, toilet, sink, add new shower pan, move toilet and sink to new location. new light switches, exhaust vent. install new toilet, new glass shower door, new file, new lighting, new plumbing fixtures, new tile and paintingDetails
demo all interior wall board/remove existing shower stall, toilet, sink, add new shower pan, move toilet and sink to new location. new light switches, exhaust vent. install new toilet, new glass shower door, new file, new lighting, new plumbing fixtures, new tile and painting | $18,500 |
| May 9, 2005 | Completed final sign-off May 2005 | 426 Moscow St | Bay Area Overhead Door Co. | replace garage doorDetails
replace garage door | $1,400 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dolan Construction (2), Bay Area Overhead Door Co., Bay Metro Corporation
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.