Monte Stott
- Listed as
- architect, attorney, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Monte Stott & Assoc Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Sep 2026
308 permits since 2000 (engineer on 257 permits, architect on 36 permits, authorized agent-others on 12 permits, designer on 6 permits, attorney on 2 permits, pmt consultant/expediter on 2 permits): 236 completed, 11 in progress, 26 never finaled, 35 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 308.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 393 Crestmont Dr | Lindquist Custom Construction Inc | 2/f: removal of existing fire place and associated partition walls, one bearing wall between kitchen and dining, and the addition of new post and beam. no kitchen/bathroom remodel.Details
2/f: removal of existing fire place and associated partition walls, one bearing wall between kitchen and dining, and the addition of new post and beam. no kitchen/bathroom remodel. | $32,000 |
| Aug 17, 2026 | In progress issued Sep 2026 | 1842 Lake St | Urban Crew Construction Inc | voluntary strengthen existing roof deck framing with several new beams and headers and additional joists and clips. no foundation upgrade as new members are replacing existing at the same locationDetails
voluntary strengthen existing roof deck framing with several new beams and headers and additional joists and clips. no foundation upgrade as new members are replacing existing at the same location | $80,000 |
| Jun 8, 2026 | In progress issued Jun 2026 | 538 Vallejo St | Lindquist Custom Construction Inc | relocate existing kitchen, replace all appliances with electric appliancesDetails
relocate existing kitchen, replace all appliances with electric appliances | $10,000 |
| Jun 4, 2026 | In progress filed Jun 2026, not yet issued | 2255 North Point St | new construction of detached adu in rear yard. 2-story, 1 residential unit, type v-b.Details
new construction of detached adu in rear yard. 2-story, 1 residential unit, type v-b. | $210,000 | |
| Apr 16, 2026 | Completed final sign-off Aug 2026 | 54 Pearl St | Rua Woods Construction Inc | revision to pa# 202603107229: expansion of (e) bedroom closet.Details
revision to pa# 202603107229: expansion of (e) bedroom closet. | $2,000 |
| Apr 8, 2026 | Completed final sign-off May 2026 | 167 21st Av | Markoff Structural Pest Control, Gil Construction & Assoc Inc. | install 2 hardy frame panels & a grade beam @ the rear wall @ the parking level. damage to (e) steel beam was discovered and noted in markoff pest reportDetails
install 2 hardy frame panels & a grade beam @ the rear wall @ the parking level. damage to (e) steel beam was discovered and noted in markoff pest report | $20,000 |
| Dec 19, 2025 | Completed final sign-off Jun 2026 | 1220 Russia Av | Macs Sf | dry rot repair of walls at crawl space/storage level at existing two-story single family. repair includes copping at existing foundation at approx. 26'-8'' total length. as well as one new isolated footing under an existing beam.Details
dry rot repair of walls at crawl space/storage level at existing two-story single family. repair includes copping at existing foundation at approx. 26'-8'' total length. as well as one new isolated footing under an existing beam. | $8,000 |
| Dec 16, 2025 | Completed final sign-off May 2026 | 260 Faxon Av | Rua Woods Construction Inc | kitchen remodel. new skylight. replace existing window. new cabinets and counters.Details
kitchen remodel. new skylight. replace existing window. new cabinets and counters. | $45,000 |
| Nov 24, 2025 | In progress issued Dec 2025 | 55 Palm Av | A D C, Inc | revision to pa# 202108236903: delete proposed 2nd floor deck and adjacent 1 hour wall at nw end of (e) building. replace in kind 2 (e) metal balconies at west end of 2/f. add 1 (n) metal balcony to match (e) balconies at nw end of 2/f.Details
revision to pa# 202108236903: delete proposed 2nd floor deck and adjacent 1 hour wall at nw end of (e) building. replace in kind 2 (e) metal balconies at west end of 2/f. add 1 (n) metal balcony to match (e) balconies at nw end of 2/f. | $1,000 |
| Nov 6, 2025 | In progress issued Nov 2025 | 1291 Sanchez St | voluntary strengthening of garage level, including partial foundation replacement. new ply shear walls. anchor bolts. hold downs, and shear clips.Details
voluntary strengthening of garage level, including partial foundation replacement. new ply shear walls. anchor bolts. hold downs, and shear clips. | $66,707 | |
| Aug 11, 2025 | Completed final sign-off May 2026 | 603 San Jose Av | C K Construction, Ckg Building Construction | bathroom remodel with 8 sf lightwell infillDetails
bathroom remodel with 8 sf lightwell infill | $20,000 |
| Aug 11, 2025 | In progress issued Sep 2025 | 1360 Montgomery St | Aidan Collins & Sons Inc | unit 10: kitchen and bath remodel. new washer and ventless dryer. no change to structural. no change to existing envelope.Details
unit 10: kitchen and bath remodel. new washer and ventless dryer. no change to structural. no change to existing envelope. | $65,000 |
| Jul 23, 2025 | Completed final sign-off Jan 2026 | 1566 Guerrero St | repair of (e) retiaing wall located at the back of the lot of a 3 story aptDetails
repair of (e) retiaing wall located at the back of the lot of a 3 story apt | $5,000 | |
| Jun 23, 2025 | Completed final sign-off Mar 2026 | 1134 Stanyan St | O'shea Co. Home Grown Construction | voluntary strengthening at garage/storage level. replace (e) 6x6 post with new 3"0 sch 40 pipe column. install approx. 65 lineal feet of plywood shear wall at garage/storage level cripple walls (no calculations)Details
voluntary strengthening at garage/storage level. replace (e) 6x6 post with new 3"0 sch 40 pipe column. install approx. 65 lineal feet of plywood shear wall at garage/storage level cripple walls (no calculations) | $26,800 |
| Jun 5, 2025 | Completed final sign-off Oct 2025 | 1247 Waller St | Electra Plumbing & Const | voluntary strenghthening of the walls at the lowest level including the addition of plywood sheathing, anchor bolts, hold downs, and shear clips. as well as apprx 12 linear ft of (n) grade beam foundation.Details
voluntary strenghthening of the walls at the lowest level including the addition of plywood sheathing, anchor bolts, hold downs, and shear clips. as well as apprx 12 linear ft of (n) grade beam foundation. | $10,000 |
| May 29, 2025 | Completed final sign-off Nov 2025 | 1176 Shotwell St | O'shea Co. Home Grown Construction | revision to pa# 202502210774: additional replacement of approx 12 ln ft of foundation.Details
revision to pa# 202502210774: additional replacement of approx 12 ln ft of foundation. | $1,000 |
| May 27, 2025 | In progress issued Jun 2025 | 173 Evelyn Wy | Markoff Structural Pest Control | front porch and stair replacement in kind. termite report# 24507Details
front porch and stair replacement in kind. termite report# 24507 | $30,000 |
| May 21, 2025 | Completed final sign-off Mar 2026 | 532 Baker St | Lindquist Custom Construction Inc | voluntary strengthening of the beam at the garage level. bathroom expansion of (e) bathroom to include new shower.Details
voluntary strengthening of the beam at the garage level. bathroom expansion of (e) bathroom to include new shower. | $20,000 |
| Mar 28, 2025 | In progress issued Apr 2025 | 1275 Stanyan St | Seismic Retrofitters Inc. | partial foundation replacement and the addition of plywood shear walls and shear clips at storage level wallsDetails
partial foundation replacement and the addition of plywood shear walls and shear clips at storage level walls | $80,000 |
| Mar 20, 2025 | Completed final sign-off May 2025 | 1915 15th Av | Markoff Structural Pest Control | revision to the existing permit#202310037952. reduce scope of work, eliminate one post and footing, and change to beam dimensions.Details
revision to the existing permit#202310037952. reduce scope of work, eliminate one post and footing, and change to beam dimensions. | |
| Mar 17, 2025 | Completed final sign-off Jun 2025 | 268 Surrey St | O'shea Co. Home Grown Construction | replacement of (e) deck in-kindDetails
replacement of (e) deck in-kind | $10,000 |
| Mar 13, 2025 | Completed final sign-off Jan 2026 | 1835 Leavenworth St | Counterforce Inc. | (common areas only) replace one dry rotted deck beam. replace a portion of another dry rotted deck beam. less than 50%Details
(common areas only) replace one dry rotted deck beam. replace a portion of another dry rotted deck beam. less than 50% | $28,000 |
| Feb 21, 2025 | Completed final sign-off Nov 2025 | 1176 Shotwell St | O'shea Co. Home Grown Construction | strengthen the framing @ the sagging front bayDetails
strengthen the framing @ the sagging front bay | $8,000 |
| Feb 19, 2025 | Completed final sign-off Mar 2025 | 219 18th Av | Counterforce Inc. | 2nd/fl: remove two dry rotted posts supporting the rear on the 2nd floor "pop out" and install a new perimeter footing and wood framed shear walls below the "pop out" install masonite shingles at new and paint to match existing. area to remain unconditioned storageDetails
2nd/fl: remove two dry rotted posts supporting the rear on the 2nd floor "pop out" and install a new perimeter footing and wood framed shear walls below the "pop out" install masonite shingles at new and paint to match existing. area to remain unconditioned storage | $16,000 |
| Oct 21, 2024 | Completed final sign-off Dec 2024 | 377 Clipper St | Perez Construction Llc. | install 19 lineal feet of new french drain that discharge into existing catch basin which drains to city sewerDetails
install 19 lineal feet of new french drain that discharge into existing catch basin which drains to city sewer | $14,000 |
| May 20, 2024 | In progress issued Jun 2025 | 475 Chestnut St | Markoff Structural Pest Control | replace existing rear roof deck in kindDetails
replace existing rear roof deck in kind | $30,000 |
| Apr 24, 2024 | Completed final sign-off Jun 2024 | 500 Myra Wy | Markoff Structural Pest Control | replace two story deck and stairs "in kind" slightly narrower - termite and dryrot.Details
replace two story deck and stairs "in kind" slightly narrower - termite and dryrot. | $60,000 |
| Feb 26, 2024 | In progress filed Feb 2024, not yet issued | 421 Paris St | Acl General Construction Inc | in kind replacement of (e) rear deckDetails
in kind replacement of (e) rear deck | $7,500 |
| Feb 21, 2024 | Completed final sign-off Aug 2024 | 723 46th Av | Seismic Retrofitters Inc. | voluntary strengthening of the walls at the garage/storage level including the addition of plywood sheathing, anchor bolts, holddowns, shear clips, as well as eight new posts with associated concrete footings.Details
voluntary strengthening of the walls at the garage/storage level including the addition of plywood sheathing, anchor bolts, holddowns, shear clips, as well as eight new posts with associated concrete footings. | $62,500 |
| Jan 8, 2024 | Completed final sign-off Jul 2024 | 2255 35th Av | Counterforce Inc. | the replacement of 17 lineal feet of the rear foundation.Details
the replacement of 17 lineal feet of the rear foundation. | $16,000 |
| Jan 5, 2024 | Completed final sign-off Dec 2024 | 602 Buchanan St | Lindquist Custom Construction Inc | replace approximately 45 lineal feet of foundation with a new foundation add approximately 15 lineal feet of plywood shear wall in the crawl space cripple wallDetails
replace approximately 45 lineal feet of foundation with a new foundation add approximately 15 lineal feet of plywood shear wall in the crawl space cripple wall | $20,000 |
| Dec 20, 2023 | Completed final sign-off May 2024 | 2856 Steiner St | Seismic Retrofitters Inc. | foundation replacement and garage level seismic strengthening. (ex. st slab to remain)Details
foundation replacement and garage level seismic strengthening. (ex. st slab to remain) | $95,000 |
| Dec 20, 2023 | Completed final sign-off Jun 2025 | 3525 24th St | O'shea Co. Home Grown Construction | removal of (e) bearing wall between (e) kitchen & living rm, addition of (n) bathroom, and kitchen remodel at the top unit at (e) three unitDetails
removal of (e) bearing wall between (e) kitchen & living rm, addition of (n) bathroom, and kitchen remodel at the top unit at (e) three unit | $32,500 |
| Oct 30, 2023 | Completed final sign-off Oct 2024 | 18 Chattanooga St | Forma Construction | revision to pa# 202307071694. correcting the elevator pit details (with drainage and surface drain) and miscellaneous framing details. to replace all structural sheets in reference permit.Details
revision to pa# 202307071694. correcting the elevator pit details (with drainage and surface drain) and miscellaneous framing details. to replace all structural sheets in reference permit. | $5,000 |
| Oct 3, 2023 | Completed final sign-off May 2025 | 1915 15th Av | Markoff Structural Pest Control | extension of (e) second floor deck at the rear of (e) single family dwelling, replace (e) window at rear with new doorDetails
extension of (e) second floor deck at the rear of (e) single family dwelling, replace (e) window at rear with new door | $20,000 |
| Aug 30, 2023 | Completed final sign-off May 2024 | 38 Brentwood Av | Golden Bay Contractor | replace approximately 20 lineal feet of foundation supporting one elevated floor and one roof. work on the back storyDetails
replace approximately 20 lineal feet of foundation supporting one elevated floor and one roof. work on the back story | $6,500 |
| Aug 14, 2023 | Completed final sign-off Nov 2023 | 534 Vallejo St | Lindquist Custom Construction Inc | install new lvl rafters to stiffen the existing roof framing to prevent ponding. not visible from street, no change to slopeDetails
install new lvl rafters to stiffen the existing roof framing to prevent ponding. not visible from street, no change to slope | $40,000 |
| Jul 21, 2023 | Completed final sign-off Feb 2024 | 50 San Pablo Av | Counterforce Inc. | structural: install 6lf of sister foundation. install 35lf of french drain.Details
structural: install 6lf of sister foundation. install 35lf of french drain. | $28,500 |
| May 10, 2023 | Completed final sign-off Aug 2023 | 1024 Hampshire St | O'shea Co. Home Grown Construction | voluntary seismic strengthening of the walls at the garage/storage level. addition of new hfx panel, plywood shear walls, anchor bolts, holdowns, shear clips.Details
voluntary seismic strengthening of the walls at the garage/storage level. addition of new hfx panel, plywood shear walls, anchor bolts, holdowns, shear clips. | $20,000 |
| Apr 18, 2023 | Completed final sign-off Jul 2023 | 562 Lombard St | O'shea Co. Home Grown Construction | install one 36" square concrete pad at (e) rear foundationDetails
install one 36" square concrete pad at (e) rear foundation | $5,000 |
| Apr 18, 2023 | Completed final sign-off Mar 2024 | 4 25th North Av | Forma Construction | replace a rust damaged 2nd floor steel guard rail in kind with new painted metal guradrail to match existing.Details
replace a rust damaged 2nd floor steel guard rail in kind with new painted metal guradrail to match existing. | $30,000 |
| Apr 11, 2023 | Completed final sign-off May 2024 | 2047 Broadway | C K Construction | interior renovation of (e) non-accessible, approx. 500sf studio apt including kitchen, bath remodel, new electrical/plumbing, new windows all within (e) bldg envelope. street facing exterior window modification.Details
interior renovation of (e) non-accessible, approx. 500sf studio apt including kitchen, bath remodel, new electrical/plumbing, new windows all within (e) bldg envelope. street facing exterior window modification. | $30,000 |
| Apr 6, 2023 | Completed final sign-off Aug 2023 | 77 Pleasant St | roof deck replacement in kind. all work will reflect previous pa# 9825369 and 199092. to comply with nov# 202200576Details
roof deck replacement in kind. all work will reflect previous pa# 9825369 and 199092. to comply with nov# 202200576 | $20,000 | |
| Apr 3, 2023 | Completed final sign-off Sep 2023 | 3525 24th St | O'shea Co. Home Grown Construction | repair (e) rear stair and landing "in-kind"Details
repair (e) rear stair and landing "in-kind" | $52,300 |
| Feb 10, 2023 | Completed final sign-off May 2023 | 3525 24th St | O'shea Co. Home Grown Construction | voluntary strengthening of the existing foundation, replace approx. 14t of existing foundation with new foundation.Details
voluntary strengthening of the existing foundation, replace approx. 14t of existing foundation with new foundation. | $5,600 |
| Jul 22, 2022 | Completed final sign-off Oct 2022 | 46 Ramona Av | O'shea Co. Home Grown Construction | replacement of one existing footing at the (e) two unit three story building.Details
replacement of one existing footing at the (e) two unit three story building. | $10,000 |
| Jun 16, 2022 | Never finaled issued Jun 2022, no final | 2965 Clay St | to obtain final inspection for work approved pa #9614202, 9619844, 9620463. all work is complete.Details
to obtain final inspection for work approved pa #9614202, 9619844, 9620463. all work is complete. | ||
| May 25, 2022 | Completed final sign-off Dec 2022 | 1517 Treat Av | S F Garage Company Inc. | voluntary strengthening of the walls at the lowest level garage area, including plywood sheathing, anchor bolts, holdowns, shear cups, and ~24ft of foundation replacement. no exterior workDetails
voluntary strengthening of the walls at the lowest level garage area, including plywood sheathing, anchor bolts, holdowns, shear cups, and ~24ft of foundation replacement. no exterior work | $35,000 |
| Apr 12, 2022 | Completed final sign-off Oct 2023 | 1326 Dolores St | M M I A Inc Dba Keith Fontana Constructi | repair dry rotted entry stair & widen (e) garage. replace ~21' of unreinforced concrete foundation of garage with new reinforced concrete walls and grade beam.Details
repair dry rotted entry stair & widen (e) garage. replace ~21' of unreinforced concrete foundation of garage with new reinforced concrete walls and grade beam. | $75,000 |
| Mar 31, 2022 | Never finaled issued Apr 2022, no final | 473 Hill St | 2 new interior doors at 3rd fl. no change to exterior.Details
2 new interior doors at 3rd fl. no change to exterior. | $2,000 | |
| Mar 22, 2022 | Completed final sign-off Mar 2023 | 3919 22nd St | Rua Woods Construction Inc | remodel to (e) kitchen including new finishes, fixtures & appliances. m.e.p. as required. remove wall between kitchen & dining. install (n) beam & posts. relocate (e) property line window. enlarge door to rear deck. no work visible from street.Details
remodel to (e) kitchen including new finishes, fixtures & appliances. m.e.p. as required. remove wall between kitchen & dining. install (n) beam & posts. relocate (e) property line window. enlarge door to rear deck. no work visible from street. | $50,000 |
| Jan 18, 2022 | Completed final sign-off Aug 2023 | 510 Castenada Av | landscape retaining wall replacement, less than 8 feet height, removing less than 50 cubic yards of dirt.Details
landscape retaining wall replacement, less than 8 feet height, removing less than 50 cubic yards of dirt. | $38,000 | |
| Dec 21, 2021 | Completed final sign-off Jun 2022 | 817 Hayes St | Gf Golden Foundation Co. | replace in kind existing rear stair, demo exiting roof hang to clear red tagDetails
replace in kind existing rear stair, demo exiting roof hang to clear red tag | $16,000 |
| Dec 10, 2021 | Completed final sign-off Apr 2022 | 405 Broderick St | revision to pa#202106222983. relocate shear walls, remove post and install new beam, increase slope of foundation work.Details
revision to pa#202106222983. relocate shear walls, remove post and install new beam, increase slope of foundation work. | $25,000 | |
| Oct 21, 2021 | Completed final sign-off Apr 2022 | 715 Andover St | revision to permit 202012080486. adjust retaining wall height to match existing conditions.Details
revision to permit 202012080486. adjust retaining wall height to match existing conditions. | $12,000 | |
| Jul 15, 2021 | Completed final sign-off Sep 2021 | 27 Homewood Ct | O'shea Co. Home Grown Construction | remove partition wall and add skylight.Details
remove partition wall and add skylight. | |
| Jun 22, 2021 | Completed final sign-off Apr 2022 | 405 Broderick St | voluntary strengthening of walls at the lowest level, partial foundation/retaining wall replacement, addition of plywood shear walls, anchor bolts, holdowns, and shear clips.Details
voluntary strengthening of walls at the lowest level, partial foundation/retaining wall replacement, addition of plywood shear walls, anchor bolts, holdowns, and shear clips. | $72,000 | |
| Jun 16, 2021 | Completed final sign-off Sep 2021 | 3563 Mission St | Qualisopus Construction | repair of existing retaining wall. lower riser of existing concrete stair. new guardrail at rear of buildingDetails
repair of existing retaining wall. lower riser of existing concrete stair. new guardrail at rear of building | $14,500 |
| Jun 11, 2021 | Never finaled issued Jun 2022, no final | 1900 Fell St | Lindquist Custom Construction Inc | voluntary access improvents, accessible entrance at the first fl. along clayton st.Details
voluntary access improvents, accessible entrance at the first fl. along clayton st. | $20,000 |
| Jun 9, 2021 | Completed final sign-off Apr 2022 | 734 Ashbury St | O'shea Co. Home Grown Construction | strengthening of walls @ the garage/storage level, replacement of (e) brick foundation, (2) hardy panels, plywood sheathing, anchor bolt, holdowns, shear clipsDetails
strengthening of walls @ the garage/storage level, replacement of (e) brick foundation, (2) hardy panels, plywood sheathing, anchor bolt, holdowns, shear clips | $85,000 |
| Apr 7, 2021 | Completed final sign-off Jul 2021 | 1127 Russia Av | Counterforce Inc. | voluntary strengthening of walls at the garage level. addition of plywood sheathing, anchor bolts, holdowns, shear clips.Details
voluntary strengthening of walls at the garage level. addition of plywood sheathing, anchor bolts, holdowns, shear clips. | $12,400 |
| Mar 12, 2021 | Completed final sign-off Nov 2021 | 307 Castro St | voluntary strengthening of the garage/ storage level, including hardy frame panels, plywood, anchor bolts, holdowns, clips, as well as partial foundation replacement of ~150 ft.Details
voluntary strengthening of the garage/ storage level, including hardy frame panels, plywood, anchor bolts, holdowns, clips, as well as partial foundation replacement of ~150 ft. | $74,000 | |
| Mar 10, 2021 | Completed final sign-off Mar 2022 | 3300 Clay St | Counterforce Inc. | revision to app#201709137894 for soft story upgrade per cbc 2019, appendix chapter a4Details
revision to app#201709137894 for soft story upgrade per cbc 2019, appendix chapter a4 | |
| Mar 5, 2021 | Completed final sign-off Apr 2022 | 2550 Vallejo St | Stroub Construction | revision to pa# 201912098981. remove post in garage. addition of beams + 3 posts. reduce size of existing mechanical room.Details
revision to pa# 201912098981. remove post in garage. addition of beams + 3 posts. reduce size of existing mechanical room. | $25,000 |
| Dec 8, 2020 | Completed final sign-off Apr 2022 | 715 Andover St | voluntary strengthening of crawlspace level and partial foundation replacement.Details
voluntary strengthening of crawlspace level and partial foundation replacement. | $50,000 | |
| Sep 22, 2020 | Never finaled issued Oct 2020, no final | 828 Francisco St | interior work only. relocate 2 baths, 1 bedroom on 2nd fl. remodel bath at 3rd fl. relocate 1 partition wall at basement.Details
interior work only. relocate 2 baths, 1 bedroom on 2nd fl. remodel bath at 3rd fl. relocate 1 partition wall at basement. | $85,000 | |
| Sep 20, 2020 | Never finaled issued Oct 2020, no final | 2255 North Point St | Counterforce Inc. | rev to pa201806152081: wall strengthening in garage.Details
rev to pa201806152081: wall strengthening in garage. | |
| Sep 19, 2020 | Completed final sign-off Nov 2020 | 139 Charles St | voluntary strengthening of garage/storage level, partial foundation replacement.Details
voluntary strengthening of garage/storage level, partial foundation replacement. | $12,500 | |
| Sep 19, 2020 | Completed final sign-off Apr 2021 | 6133 California St | O'shea Co. Home Grown Construction | widening of garage door (within the existing opening) & voluntary strengthening of the walls at the garage/storage level.Details
widening of garage door (within the existing opening) & voluntary strengthening of the walls at the garage/storage level. | $42,800 |
| Aug 14, 2020 | Completed final sign-off Oct 2024 | 1935 Greenwich St | Jdm Builders Group Inc., J G R Construcion | remodel of (e) 2 units. increase 1st fl conditioned area by 148sf by reducing garage area. new windows & exterior siding. add powder rm to 1st fl & 2 baths to 3rd fl. add sunken patio to rear yard. replace furnaces & water heaters. add 3 skylights at roof.Details
remodel of (e) 2 units. increase 1st fl conditioned area by 148sf by reducing garage area. new windows & exterior siding. add powder rm to 1st fl & 2 baths to 3rd fl. add sunken patio to rear yard. replace furnaces & water heaters. add 3 skylights at roof. | $375,000 |
| Jun 8, 2020 | Completed final sign-off May 2021 | 132 Elsie St | replacement of approximately 20 linear feet of foundation at the northeast side of the existing 2 story single family residence.Details
replacement of approximately 20 linear feet of foundation at the northeast side of the existing 2 story single family residence. | $15,000 | |
| May 29, 2020 | Completed final sign-off Oct 2020 | 2308 Buchanan St | Peninsula Custom Homes Inc | dry rot repair of less than 50% of the cantilever deck framing "in-kind" at the existing deck at the south side of the upper floor. replace the shingles "in-kind" at the front wall at the existing residence to match the existing shingles.Details
dry rot repair of less than 50% of the cantilever deck framing "in-kind" at the existing deck at the south side of the upper floor. replace the shingles "in-kind" at the front wall at the existing residence to match the existing shingles. | $62,000 |
| Feb 7, 2020 | Completed final sign-off Nov 2023 | 2525 Larkin St | Electra Plumbing & Const | strength approx. 480 sq ft of extg overspanned ceiling joists with new lvl joists.Details
strength approx. 480 sq ft of extg overspanned ceiling joists with new lvl joists. | $12,000 |
| Jan 30, 2020 | Completed final sign-off May 2021 | 670 Page St | remodel kitchen and bathrooms.Details
remodel kitchen and bathrooms. | $82,000 | |
| Jan 21, 2020 | Completed final sign-off Dec 2021 | 2160 Green St | Moroso Construction Inc | voluntary strengthening of walls at crawlspace level with plywood sheathing, anchor bolts, and shear clips. front bldg.Details
voluntary strengthening of walls at crawlspace level with plywood sheathing, anchor bolts, and shear clips. front bldg. | $6,200 |
| Dec 9, 2019 | Never finaled issued Jan 2020, no final | 2880 Broadway | Moroso Construction Inc | voluntary strengthening of crawl space, including the addition of plywood sheathing, shear clips epoxy set bolts and strapsDetails
voluntary strengthening of crawl space, including the addition of plywood sheathing, shear clips epoxy set bolts and straps | $20,000 |
| Dec 9, 2019 | Completed final sign-off Apr 2022 | 2550 Vallejo St | Stroub Construction | interior remodel only. no exterior work. install personal elevator for the 3 floors. remove one post in garage, and add a beam. remodel bedroom suite and bathroom.Details
interior remodel only. no exterior work. install personal elevator for the 3 floors. remove one post in garage, and add a beam. remodel bedroom suite and bathroom. | $190,000 |
| Sep 19, 2019 | Completed final sign-off Oct 2020 | 2200 Larkin St | De Brus Construction Inc | the removal of extg partitions,retaining walls below,& the construction of a new retaining wall with 1 hr fire rated walls above. the extg garage will be expanded by approx. 75 sq ft in addition, 10 lineal feet of brick foundatn will be replaced,& nw playwood shear walls, holdowns/clips addedDetails
the removal of extg partitions,retaining walls below,& the construction of a new retaining wall with 1 hr fire rated walls above. the extg garage will be expanded by approx. 75 sq ft in addition, 10 lineal feet of brick foundatn will be replaced,& nw playwood shear walls, holdowns/clips added | $20,000 |
| Sep 17, 2019 | Completed final sign-off Aug 2021 | 266 Curtis St | revision to existing permit # 2019-0510-0333. addition of two new foundation underpinning pads, additional details shoring soil stabilization scheme( new sheets s2 and s3)Details
revision to existing permit # 2019-0510-0333. addition of two new foundation underpinning pads, additional details shoring soil stabilization scheme( new sheets s2 and s3) | $10,000 | |
| Aug 2, 2019 | Completed final sign-off Jul 2020 | 1315 18th St | comply w/ san francisco business entrance program. technical infeasabilityDetails
comply w/ san francisco business entrance program. technical infeasability | $2,000 | |
| Aug 2, 2019 | Completed final sign-off Jul 2020 | 1317 18th St | comply w/ san francisco business entrance program. technical infeasablityDetails
comply w/ san francisco business entrance program. technical infeasablity | $2,000 | |
| Jul 3, 2019 | Completed final sign-off Dec 2019 | 2055 Hyde St | Badger Construction | strengthening of walls at garage storage level of (e) 2-unit, 3-story building. addition of stell moment frame, plywood sheating, anchor bolts, hold-downs and shear clipsDetails
strengthening of walls at garage storage level of (e) 2-unit, 3-story building. addition of stell moment frame, plywood sheating, anchor bolts, hold-downs and shear clips | $48,000 |
| Jun 11, 2019 | Completed final sign-off Oct 2019 | 553 Frederick St | Urban Builder General Contracting Inc | replace cantilevered deck framing at upper floor rear deck. replace deck boards on both rear decks. (work in kind)Details
replace cantilevered deck framing at upper floor rear deck. replace deck boards on both rear decks. (work in kind) | $12,000 |
| May 29, 2019 | Completed final sign-off Apr 2020 | 457 Lombard St | Urban Builder General Contracting Inc | structural calculations & drawings for the replacement of the damaged beam in the garage and ceiling, reconfiguration of garage beam support posts,Details
structural calculations & drawings for the replacement of the damaged beam in the garage and ceiling, reconfiguration of garage beam support posts, | $28,000 |
| May 10, 2019 | Completed final sign-off Aug 2021 | 266 Curtis St | install approximately 40 lineal feet of a new concrete "sister retaining wall at the rear of the (e) buildingDetails
install approximately 40 lineal feet of a new concrete "sister retaining wall at the rear of the (e) building | $20,000 | |
| Apr 15, 2019 | Completed final sign-off Sep 2019 | 43 Jasper Pl | Counterforce Inc. | voluntary strengthening of the lowest level, incl the replacement of approx 54' of foundation, 800 sqft of concrete slab, 81' of (n) ply shear wall, 15' of (n) grade beam, and various shear clips,anchor bolts & holdownsDetails
voluntary strengthening of the lowest level, incl the replacement of approx 54' of foundation, 800 sqft of concrete slab, 81' of (n) ply shear wall, 15' of (n) grade beam, and various shear clips,anchor bolts & holdowns | $48,000 |
| Feb 22, 2019 | Completed final sign-off Aug 2019 | 910 Steiner St | Counterforce Inc. | voluntary strenghening of the lowest level including plywood sheating, anchor bolts, shear clips and (2) grade beamsDetails
voluntary strenghening of the lowest level including plywood sheating, anchor bolts, shear clips and (2) grade beams | $68,000 |
| Jan 15, 2019 | Completed final sign-off Sep 2019 | 44 Williar Av | O'shea Co. Home Grown Construction | removal of extg interior non-load bearing wall and relocation of extg shear wall at the 1st floor level.Details
removal of extg interior non-load bearing wall and relocation of extg shear wall at the 1st floor level. | $10,000 |
| Nov 14, 2018 | Completed final sign-off Oct 2019 | 674 Page St | Talcon Builders | full remodel of kitchen and 1 bathrooms, including electrical, mechanical, plumbing and minor structural. total area of work 358.5 sq ft. no work visible from street. addition of 2nd full bathDetails
full remodel of kitchen and 1 bathrooms, including electrical, mechanical, plumbing and minor structural. total area of work 358.5 sq ft. no work visible from street. addition of 2nd full bath | $125,000 |
| Oct 9, 2018 | Completed final sign-off Jul 2019 | 2 Dorantes Av | Burke Construction | voluntary stregthening of garage/crawlspace level. add ply sheathing at cripple wall. bolt mudsill to foundation. add misc shear clips. maher naDetails
voluntary stregthening of garage/crawlspace level. add ply sheathing at cripple wall. bolt mudsill to foundation. add misc shear clips. maher na | $30,000 |
| Sep 4, 2018 | Never finaled issued Sep 2018, no final | 615 Rhode Island St | new interior staircase and railingDetails
new interior staircase and railing | $10,000 | |
| Jun 25, 2018 | Completed final sign-off Aug 2019 | 330 Guerrero St | soft story upgrade of storage level. new shear walls and anchor bolts and hold downs,new shear clips, new grade beams, upgrade appendix ch a4Details
soft story upgrade of storage level. new shear walls and anchor bolts and hold downs,new shear clips, new grade beams, upgrade appendix ch a4 | $92,000 | |
| Jun 15, 2018 | Completed final sign-off Oct 2020 | 2255 North Point St | Counterforce Inc. | soft story mitigation per 2016 cebc appendix ch a4 including strengthening walls at garage/storage lvel. addition f plywood sheathing, anchor bolts, holdowns, shear clipsDetails
soft story mitigation per 2016 cebc appendix ch a4 including strengthening walls at garage/storage lvel. addition f plywood sheathing, anchor bolts, holdowns, shear clips | $40,000 |
| Apr 27, 2018 | Never finaled issued May 2018, no final | 2864 Broadway | Moroso Construction Inc | repair and voluntary bracing of the extg rear deck at the extg residence.Details
repair and voluntary bracing of the extg rear deck at the extg residence. | $60,000 |
| Mar 5, 2018 | Completed final sign-off Jul 2018 | 465 Hill St | the relocation of (1) stair support post and (1) 3' pipe stanchion. removal of (1) 3' pipe stanchion at garage storage levelDetails
the relocation of (1) stair support post and (1) 3' pipe stanchion. removal of (1) 3' pipe stanchion at garage storage level | $5,000 | |
| Dec 18, 2017 | Never finaled issued Dec 2017, no final | 2864 Broadway | Moroso Construction Inc | revision to app#201709188825. alteration to foundation details to match extg conditions. n/a for maherDetails
revision to app#201709188825. alteration to foundation details to match extg conditions. n/a for maher | |
| Nov 28, 2017 | Completed final sign-off Nov 2019 | 325 Franklin St | M J Construction | revision to 201606296222, add 20 lin ft of new foundatio to replace e inadequate foundation. part of mandatory work.Details
revision to 201606296222, add 20 lin ft of new foundatio to replace e inadequate foundation. part of mandatory work. | $6,000 |
| Nov 2, 2017 | Never finaled issued Nov 2017, no final | 615 Rhode Island St | revision to pa #201612094642 - replace 36' of existing undersized foundation.Details
revision to pa #201612094642 - replace 36' of existing undersized foundation. | $6,000 | |
| Nov 2, 2017 | Completed final sign-off Oct 2019 | 2864 Broadway | Moroso Construction Inc | new wood convenience stairs from basement to grade, fenestration changes @ rear, not visable from public ways, repair dry rot as required, replace interior non-compliant stairs with new compliant stair. basement-relocate kitchen from 1/f,Details
new wood convenience stairs from basement to grade, fenestration changes @ rear, not visable from public ways, repair dry rot as required, replace interior non-compliant stairs with new compliant stair. basement-relocate kitchen from 1/f, | $750,000 |
| Nov 2, 2017 | Completed final sign-off Apr 2018 | 2712 Sutter St | Thomas Christopher Tilton | structural revision to pa# 201706220139. replace existing footings/posts.Details
structural revision to pa# 201706220139. replace existing footings/posts. | $7,500 |