Golden Bay Contractor
- Based in
- Novato
- On San Francisco permits
- Apr 2016 to Oct 2026
- Last 24 months
- 10 permits filed
19 permits since 2000: 8 completed, 9 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2026 | In progress issued Oct 2026 | 315 Topeka Av | revision to pa#202511129408: laundry updated plumbing and electrical outlet.Details
revision to pa#202511129408: laundry updated plumbing and electrical outlet. | $5,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 330 Collingwood St | remodel 2 bathrooms, like-for-like including new vanities, lighting, tilework and plumbing fixtures; remove (e) floor finish and install new flooringDetails
remodel 2 bathrooms, like-for-like including new vanities, lighting, tilework and plumbing fixtures; remove (e) floor finish and install new flooring | $52,000 |
| Aug 13, 2026 | In progress issued Aug 2026 | 328 Collingwood St | remodel 2 bathrooms, like-for-like including new vanities, lighting, tilework and plumbing fixtures; install new guardrail & ballusters @ 3rd level roof deck. no structural modifications; remove (e) floor finish and install new flooringDetails
remodel 2 bathrooms, like-for-like including new vanities, lighting, tilework and plumbing fixtures; install new guardrail & ballusters @ 3rd level roof deck. no structural modifications; remove (e) floor finish and install new flooring | $52,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 330 Collingwood St | to comply with nov 202659707. repair rear stairs less than 50% and replace glazing for 2 windows, repair scupper/downspout and protruding conduit. all work not visible from the street.Details
to comply with nov 202659707. repair rear stairs less than 50% and replace glazing for 2 windows, repair scupper/downspout and protruding conduit. all work not visible from the street. | $1,200 |
| Jun 23, 2026 | In progress issued Jul 2026 | 130 Collins St | revision to pa# 202605060790: for lower level layout; upper remodel workDetails
revision to pa# 202605060790: for lower level layout; upper remodel work | $42,000 |
| May 6, 2026 | In progress issued May 2026 | 130 Collins St | remodel 3 bathrooms like for like includes plumbing, elec, drywall and tile work. reconditioning of existing stairs to downstairs area including framing and new flooringDetails
remodel 3 bathrooms like for like includes plumbing, elec, drywall and tile work. reconditioning of existing stairs to downstairs area including framing and new flooring | $64,300 |
| Mar 10, 2026 | In progress issued Mar 2026 | 1500 Francisco St | unit 5: kitchen and bathroom remodel. relocate gas for stove. remove walls. relocate sink, new canlights kitchen & bathroom. bathroom layout as is. new fixtures and finishes.Details
unit 5: kitchen and bathroom remodel. relocate gas for stove. remove walls. relocate sink, new canlights kitchen & bathroom. bathroom layout as is. new fixtures and finishes. | $58,000 |
| Mar 5, 2026 | In progress issued Mar 2026 | 216 Dorland St | bathroom remodel; remove non-load bearling wall; relocate tub, add standing shower, relocate toilet & vanity & new recessed lightsDetails
bathroom remodel; remove non-load bearling wall; relocate tub, add standing shower, relocate toilet & vanity & new recessed lights | $15,000 |
| Feb 11, 2026 | Completed final sign-off Apr 2026 | 1500 Francisco St | unit 3-kitchen remodel: demo no load bearing wall, replace cabinets, new plumbing and electrical fixtures.Details
unit 3-kitchen remodel: demo no load bearing wall, replace cabinets, new plumbing and electrical fixtures. | $18,000 |
| Nov 12, 2025 | In progress issued Dec 2025 | 315 Topeka Av | to comply with nov 202543370 to include no (n) construction outside (e) footprint, add 1 bathroom at lower floor and remodel bathroom at upper floor. remove illegal kitchen at lower floor and add wet bar, replace 2 windows upstairs within the same opening facing front of property and rear.Details
to comply with nov 202543370 to include no (n) construction outside (e) footprint, add 1 bathroom at lower floor and remodel bathroom at upper floor. remove illegal kitchen at lower floor and add wet bar, replace 2 windows upstairs within the same opening facing front of property and rear. | $60,000 |
| Aug 30, 2023 | Completed final sign-off May 2024 | 38 Brentwood Av | replace approximately 20 lineal feet of foundation supporting one elevated floor and one roof. work on the back storyDetails
replace approximately 20 lineal feet of foundation supporting one elevated floor and one roof. work on the back story | $6,500 |
| Jul 12, 2023 | Completed final sign-off Jul 2023 | 51 Prosper St | units #3 and #4: run dedicated circuit to (n) oven @ 240v. open walls, frame, drywall and paint. unit #3 only: replace faucet and gd.Details
units #3 and #4: run dedicated circuit to (n) oven @ 240v. open walls, frame, drywall and paint. unit #3 only: replace faucet and gd. | $5,500 |
| Jun 22, 2023 | Completed final sign-off Sep 2023 | 1862 Mcallister St | bathroom remodel like for like - to replace valves and fixtures. replace electrical and plumbing in existing laundry room. no structural work, no floor layout changes, no wall layout changes.Details
bathroom remodel like for like - to replace valves and fixtures. replace electrical and plumbing in existing laundry room. no structural work, no floor layout changes, no wall layout changes. | $45,000 |
| Oct 25, 2022 | Completed final sign-off Sep 2023 | 1368 York St | kitchen and bath remodel per plans. remove (e) fireplace.Details
kitchen and bath remodel per plans. remove (e) fireplace. | $50,000 |
| Jul 5, 2022 | Completed final sign-off Feb 2023 | 51 Prosper St | upgrade main electrical panel for entire building/ new 400 amp remodel unit #4 bathroom and kitchen and complete remodel work for #3 kitchen and bathroom work.Details
upgrade main electrical panel for entire building/ new 400 amp remodel unit #4 bathroom and kitchen and complete remodel work for #3 kitchen and bathroom work. | $50,000 |
| Jul 25, 2016 | Completed final sign-off Feb 2019 | 1333 08th Av | lower unit, addition by removing side exit stair and convert to interior space. main (2) fl add new master bath, new plumbing and elec,enclose stair, 2 new bedrooms, 1 living room, at garage levelDetails
lower unit, addition by removing side exit stair and convert to interior space. main (2) fl add new master bath, new plumbing and elec,enclose stair, 2 new bedrooms, 1 living room, at garage level | $106,000 |
| Jun 1, 2016 | Completed final sign-off May 2017 | 1333 08th Av | emergency concrete work on basement per soils engineer detail includes slab and earthquake retrofit work. also, include removal of upper area walls and installation of new lvl beam. removal of downstairs bathroom, create walk in closet.Details
emergency concrete work on basement per soils engineer detail includes slab and earthquake retrofit work. also, include removal of upper area walls and installation of new lvl beam. removal of downstairs bathroom, create walk in closet. | $6,500 |
| May 9, 2016 | Expired or cancelled cancelled Jan 2026 | 1333 08th Av | remove some walls on main floor in extg bedroom and hollway. convert into one great room and new bathroom. remove slab in lower floor bedroom and living room and convert it into living space from 7'2" to 8'Details
remove some walls on main floor in extg bedroom and hollway. convert into one great room and new bathroom. remove slab in lower floor bedroom and living room and convert it into living space from 7'2" to 8' | $45,000 |
| Apr 26, 2016 | Never finaled issued Apr 2016, no final | 1333 08th Av | electrical, paint, drywall and flooring. remove all finishes and replace drywall to accomodate new electrical. replace galvanized pipe to copper.Details
electrical, paint, drywall and flooring. remove all finishes and replace drywall to accomodate new electrical. replace galvanized pipe to copper. | $20,000 |