Back to kitchen remodel contractors
Golden Bay Contractor
- Based in
- Novato
- On San Francisco permits
- Apr 2016 to Oct 2026
- Last 24 months
- 10 permits filed
19 permits since 2000: 8 completed, 9 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 2 in progress. Typically 13 days from filing to permit and 217 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 10, 2026 | In progress issued Mar 2026 | 1500 Francisco St | unit 5: kitchen and bathroom remodel. relocate gas for stove. remove walls. relocate sink, new canlights kitchen & bathroom. bathroom layout as is. new fixtures and finishes.Details
unit 5: kitchen and bathroom remodel. relocate gas for stove. remove walls. relocate sink, new canlights kitchen & bathroom. bathroom layout as is. new fixtures and finishes. | $58,000 |
| Feb 11, 2026 | Completed final sign-off Apr 2026 | 1500 Francisco St | unit 3-kitchen remodel: demo no load bearing wall, replace cabinets, new plumbing and electrical fixtures.Details
unit 3-kitchen remodel: demo no load bearing wall, replace cabinets, new plumbing and electrical fixtures. | $18,000 |
| Nov 12, 2025 | In progress issued Dec 2025 | 315 Topeka Av | to comply with nov 202543370 to include no (n) construction outside (e) footprint, add 1 bathroom at lower floor and remodel bathroom at upper floor. remove illegal kitchen at lower floor and add wet bar, replace 2 windows upstairs within the same opening facing front of property and rear.Details
to comply with nov 202543370 to include no (n) construction outside (e) footprint, add 1 bathroom at lower floor and remodel bathroom at upper floor. remove illegal kitchen at lower floor and add wet bar, replace 2 windows upstairs within the same opening facing front of property and rear. | $60,000 |
| Oct 25, 2022 | Completed final sign-off Sep 2023 | 1368 York St | kitchen and bath remodel per plans. remove (e) fireplace.Details
kitchen and bath remodel per plans. remove (e) fireplace. | $50,000 |
| Jul 5, 2022 | Completed final sign-off Feb 2023 | 51 Prosper St | upgrade main electrical panel for entire building/ new 400 amp remodel unit #4 bathroom and kitchen and complete remodel work for #3 kitchen and bathroom work.Details
upgrade main electrical panel for entire building/ new 400 amp remodel unit #4 bathroom and kitchen and complete remodel work for #3 kitchen and bathroom work. | $50,000 |