Golden Bay Contractor
- Based in
- Novato
- On San Francisco permits
- Apr 2016 to Oct 2026
- Last 24 months
- 10 permits filed
19 permits since 2000: 8 completed, 9 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 1 completed, 2 in progress. Typically 9 days from filing to permit and 443 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2026 | In progress issued Aug 2026 | 330 Collingwood St | to comply with nov 202659707. repair rear stairs less than 50% and replace glazing for 2 windows, repair scupper/downspout and protruding conduit. all work not visible from the street.Details
to comply with nov 202659707. repair rear stairs less than 50% and replace glazing for 2 windows, repair scupper/downspout and protruding conduit. all work not visible from the street. | $1,200 |
| May 6, 2026 | In progress issued May 2026 | 130 Collins St | remodel 3 bathrooms like for like includes plumbing, elec, drywall and tile work. reconditioning of existing stairs to downstairs area including framing and new flooringDetails
remodel 3 bathrooms like for like includes plumbing, elec, drywall and tile work. reconditioning of existing stairs to downstairs area including framing and new flooring | $64,300 |
| Jul 25, 2016 | Completed final sign-off Feb 2019 | 1333 08th Av | lower unit, addition by removing side exit stair and convert to interior space. main (2) fl add new master bath, new plumbing and elec,enclose stair, 2 new bedrooms, 1 living room, at garage levelDetails
lower unit, addition by removing side exit stair and convert to interior space. main (2) fl add new master bath, new plumbing and elec,enclose stair, 2 new bedrooms, 1 living room, at garage level | $106,000 |