Block 3564, lot 031
51 Prosper St
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 2
- Units
- 5
- Rooms
- 5 bathrooms
- Building
- 2,704 sq ft
- Lot
- 1,999 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 15, 2025 | Completed final sign-off Jul 2025 | 51 Prosper St | Gil Construction & Assoc Inc. | revision to pa # 2024-0313-7677. replace 6x 12 beam with psl beam spanning between existing reinforced concrete grade beam.Details
revision to pa # 2024-0313-7677. replace 6x 12 beam with psl beam spanning between existing reinforced concrete grade beam. | |
| Mar 13, 2024 | Completed final sign-off Jul 2025 | 51 Prosper St | Gil Construction & Assoc Inc. | add staircase between apt 2 living room & apt 5 laundry area. remove (e) kitchen in apt 2 and convert to (n) bedroomDetails
add staircase between apt 2 living room & apt 5 laundry area. remove (e) kitchen in apt 2 and convert to (n) bedroom | $15,000 |
| Jul 12, 2023 | Completed final sign-off Jul 2023 | 51 Prosper St | Golden Bay Contractor | units #3 and #4: run dedicated circuit to (n) oven @ 240v. open walls, frame, drywall and paint. unit #3 only: replace faucet and gd.Details
units #3 and #4: run dedicated circuit to (n) oven @ 240v. open walls, frame, drywall and paint. unit #3 only: replace faucet and gd. | $5,500 |
| Jul 5, 2022 | Completed final sign-off Feb 2023 | 51 Prosper St | Golden Bay Contractor | upgrade main electrical panel for entire building/ new 400 amp remodel unit #4 bathroom and kitchen and complete remodel work for #3 kitchen and bathroom work.Details
upgrade main electrical panel for entire building/ new 400 amp remodel unit #4 bathroom and kitchen and complete remodel work for #3 kitchen and bathroom work. | $50,000 |
| Mar 16, 2015 | Completed final sign-off Jun 2015 | 51 Prosper St | Gil Construction & Assoc Inc. | comply with mandatory soft story sfbc 34c 2012 iebc app a4Details
comply with mandatory soft story sfbc 34c 2012 iebc app a4 | $7,300 |
| Feb 7, 2014 | Never finaled issued Feb 2014, no final | 51 Prosper St | street spaceDetails
street space | ||
| Dec 16, 2013 | Never finaled issued Dec 2013, no final | 51 Prosper St | street spaceDetails
street space | ||
| Nov 18, 2013 | Completed final sign-off Aug 2014 | 51 Prosper St | Gil Construction & Assoc Inc. | replace existing sleefered floor and slab at rear unit of ground floor partial foundation replacement. revision to appl #2013.08.14.4255 -new shear walls, holddowns at rear 1/2 of bldg per plans.Details
replace existing sleefered floor and slab at rear unit of ground floor partial foundation replacement. revision to appl #2013.08.14.4255 -new shear walls, holddowns at rear 1/2 of bldg per plans. | $7,200 |
| Sep 30, 2013 | Completed final sign-off Aug 2014 | 51 Prosper St | Gil Construction & Assoc Inc. | additional sporadic termite damage 25'x12' on south side replace siding with harde plank.Details
additional sporadic termite damage 25'x12' on south side replace siding with harde plank. | $15,000 |
| Aug 14, 2013 | Completed final sign-off Aug 2014 | 51 Prosper St | Gil Construction & Assoc Inc. | replace existing sleepered floor & slab at rear unit of ground floor, partial foundation replacement.Details
replace existing sleepered floor & slab at rear unit of ground floor, partial foundation replacement. | $48,000 |
| Jul 19, 2013 | Completed final sign-off Jul 2013 | 51 Prosper St | replace heavy single panel garage door with modern sectional one with automatic opener for disabled access.Details
replace heavy single panel garage door with modern sectional one with automatic opener for disabled access. | $2,000 | |
| Jul 19, 2010 | Completed final sign-off Sep 2010 | 51 Prosper St | apt #5 -code correction of violation notice #201041634: convert portion of existing garage into entry vestibule. add new door at exterior wall to access existing exit pathway.Details
apt #5 -code correction of violation notice #201041634: convert portion of existing garage into entry vestibule. add new door at exterior wall to access existing exit pathway. | $4,700 | |
| Feb 21, 2008 | Completed final sign-off Mar 2008 | 51 Prosper St | to correct his nov# 200844731, item# 2. replace damage wood on back stairs, less than 50% of stairs.Details
to correct his nov# 200844731, item# 2. replace damage wood on back stairs, less than 50% of stairs. | $2,500 | |
| Mar 22, 2006 | Completed final sign-off Mar 2006 | 51 Prosper St | American Roofing Co. | reroofing.Details
reroofing. | $6,500 |
| Sep 1, 2005 | Never finaled issued Sep 2005, no final | 51 Prosper St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gil Construction & Assoc Inc. (6), Golden Bay Contractor (2), American Roofing Co.
- Engineers
- Donald David (4)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.