Thomas Christopher Tilton
- Based in
- San Francisco
- On San Francisco permits
- Jun 2013 to Nov 2023
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 4 never finaled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2023 | Completed final sign-off Apr 2024 | 125 Cerritos Av | remove and replace in same location tub, toilet, vanity sink and tile shower, demo and replace tile floor and wainscoating, remove exposed galvanized pipe and replace with copperDetails
remove and replace in same location tub, toilet, vanity sink and tile shower, demo and replace tile floor and wainscoating, remove exposed galvanized pipe and replace with copper | $7,000 |
| Apr 21, 2023 | Completed final sign-off Nov 2023 | 320 Bocana St | repair in like kind entry stairs less than 50%, at front of house.Details
repair in like kind entry stairs less than 50%, at front of house. | $3,000 |
| Dec 19, 2022 | Completed final sign-off Apr 2023 | 1557 Treat Av | replace kitchen cabinets, appliance, and flooring. ugrade extg electrical. one kitchen remodel, non structural.Details
replace kitchen cabinets, appliance, and flooring. ugrade extg electrical. one kitchen remodel, non structural. | $18,000 |
| Sep 22, 2022 | Completed final sign-off Apr 2023 | 1557 Treat Av | one bathr remodel: install new plumbing and electrical fixtures in existing locations. demo existing shower, add shower control to existing bath. add recessed lights in ceiling. relocate existing exhaust fan if necessary.Details
one bathr remodel: install new plumbing and electrical fixtures in existing locations. demo existing shower, add shower control to existing bath. add recessed lights in ceiling. relocate existing exhaust fan if necessary. | $8,000 |
| Apr 27, 2022 | Completed final sign-off Jun 2022 | 2712 Sutter St | repair in like kind entry stairs (work less than 50%).Details
repair in like kind entry stairs (work less than 50%). | $12,000 |
| Jul 3, 2019 | Completed final sign-off Dec 2019 | 1559 Treat Av | remove and replace kitchen counters and cabinets. in kind remodel on the 2nd floor, no moving of doors or walls.Details
remove and replace kitchen counters and cabinets. in kind remodel on the 2nd floor, no moving of doors or walls. | $10,000 |
| Feb 20, 2018 | Never finaled issued Feb 2018, no final | 2712 Sutter St | street spaceDetails
street space | |
| Nov 2, 2017 | Completed final sign-off Apr 2018 | 2712 Sutter St | structural revision to pa# 201706220139. replace existing footings/posts.Details
structural revision to pa# 201706220139. replace existing footings/posts. | $7,500 |
| Jun 22, 2017 | Completed final sign-off Apr 2018 | 2712 Sutter St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4: soft sotry mitigation, addition of plywood sheathing, anchor bolts, holdowns, shear clips and grade beams.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4: soft sotry mitigation, addition of plywood sheathing, anchor bolts, holdowns, shear clips and grade beams. | $56,000 |
| Mar 14, 2017 | Completed final sign-off Apr 2017 | 1556 Cayuga Av | repair front entry stairs, treads, risers. work to be in-kind.repair waterproof & any damaged framingDetails
repair front entry stairs, treads, risers. work to be in-kind.repair waterproof & any damaged framing | $10,000 |
| Oct 21, 2016 | Never finaled issued Oct 2018, no final | 791 23rd Av | add a storage room (144 sqft total) and bathroom inside the storage room, to be attached to (and entered from) the (e) garage on the ground floor.Details
add a storage room (144 sqft total) and bathroom inside the storage room, to be attached to (and entered from) the (e) garage on the ground floor. | $15,000 |
| Sep 20, 2016 | Completed final sign-off Nov 2016 | 1559 Treat Av | demo (e) bath shower, vanity and toilet, install step in shower, new vanity, toilet. demo (e) tile floor, install new tile.Details
demo (e) bath shower, vanity and toilet, install step in shower, new vanity, toilet. demo (e) tile floor, install new tile. | $15,000 |
| Sep 19, 2016 | Completed final sign-off Nov 2016 | 251 Bonview St | repair in like kind, waterproofing for entry stairs, demo existing brick treads/risers, repair dryrot if existing, rewaterproofing and install terrazzo treads/riserDetails
repair in like kind, waterproofing for entry stairs, demo existing brick treads/risers, repair dryrot if existing, rewaterproofing and install terrazzo treads/riser | $9,000 |
| Aug 19, 2016 | Completed final sign-off Nov 2016 | 1049 Dolores St | repair in-kind entry walkways & courtyard: demo (e) finished terrazo, repair & water proofing, repair any damanged floor frame as neccessary. repair water proofing of basement lightwell windows, install new floor tile & finished surfaces. paint repaired areas, not visible from street.Details
repair in-kind entry walkways & courtyard: demo (e) finished terrazo, repair & water proofing, repair any damanged floor frame as neccessary. repair water proofing of basement lightwell windows, install new floor tile & finished surfaces. paint repaired areas, not visible from street. | $35,000 |
| Aug 26, 2015 | Never finaled issued Aug 2015, no final | 1217 27th Av | repair in like kind entry stairs andDetails
repair in like kind entry stairs and | $25,000 |
| Apr 23, 2015 | Completed final sign-off Jul 2015 | 1557 Treat Av | convert (e) storage space to new bathroom on the ground floor of a 2 unit bld. new 1-hour partitions separating (e) garage from (n) bathroon. elect and plumb in the area of workDetails
convert (e) storage space to new bathroom on the ground floor of a 2 unit bld. new 1-hour partitions separating (e) garage from (n) bathroon. elect and plumb in the area of work | $8,000 |
| May 2, 2014 | Completed final sign-off Feb 2016 | 139 Belvedere St | remove existing stucco to original redwood siding finish for street front side. restore victorian facade based on design in paint shadows and physical evidence under stucco. repair siding as needed.Details
remove existing stucco to original redwood siding finish for street front side. restore victorian facade based on design in paint shadows and physical evidence under stucco. repair siding as needed. | $75,000 |
| Jan 29, 2014 | Completed final sign-off Jul 2014 | 625 Divisadero St | #6 - remodel existing unit with changes to existing framing, plumbing + electrical. repair/replace drywall, flooring + paint, add insulation where necessary, install plumbing/electrical fixture + appliances.(also known as unit #18 per hoa)Details
#6 - remodel existing unit with changes to existing framing, plumbing + electrical. repair/replace drywall, flooring + paint, add insulation where necessary, install plumbing/electrical fixture + appliances.(also known as unit #18 per hoa) | $25,000 |
| Jun 13, 2013 | Never finaled issued Jun 2013, no final | 1835 Franklin St | remodel master bath - guest bath in #1002. master: retile shower, rebuld shower pan, install new plumb& elec fixtures & cabinets. relocate laundry to bathroom. guest bath: retile r&r tubs, & shower valve, install new plumb & elec fixutres & cabinets for out walls to accomodate new plumbing fixtureDetails
remodel master bath - guest bath in #1002. master: retile shower, rebuld shower pan, install new plumb& elec fixtures & cabinets. relocate laundry to bathroom. guest bath: retile r&r tubs, & shower valve, install new plumb & elec fixutres & cabinets for out walls to accomodate new plumbing fixture | $20,000 |