Thomas Christopher Tilton
- Based in
- San Francisco
- On San Francisco permits
- Jun 2013 to Nov 2023
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 4 never finaled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 2 never finaled. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2022 | Completed final sign-off Apr 2023 | 1557 Treat Av | one bathr remodel: install new plumbing and electrical fixtures in existing locations. demo existing shower, add shower control to existing bath. add recessed lights in ceiling. relocate existing exhaust fan if necessary.Details
one bathr remodel: install new plumbing and electrical fixtures in existing locations. demo existing shower, add shower control to existing bath. add recessed lights in ceiling. relocate existing exhaust fan if necessary. | $8,000 |
| Oct 21, 2016 | Never finaled issued Oct 2018, no final | 791 23rd Av | add a storage room (144 sqft total) and bathroom inside the storage room, to be attached to (and entered from) the (e) garage on the ground floor.Details
add a storage room (144 sqft total) and bathroom inside the storage room, to be attached to (and entered from) the (e) garage on the ground floor. | $15,000 |
| Sep 20, 2016 | Completed final sign-off Nov 2016 | 1559 Treat Av | demo (e) bath shower, vanity and toilet, install step in shower, new vanity, toilet. demo (e) tile floor, install new tile.Details
demo (e) bath shower, vanity and toilet, install step in shower, new vanity, toilet. demo (e) tile floor, install new tile. | $15,000 |
| Apr 23, 2015 | Completed final sign-off Jul 2015 | 1557 Treat Av | convert (e) storage space to new bathroom on the ground floor of a 2 unit bld. new 1-hour partitions separating (e) garage from (n) bathroon. elect and plumb in the area of workDetails
convert (e) storage space to new bathroom on the ground floor of a 2 unit bld. new 1-hour partitions separating (e) garage from (n) bathroon. elect and plumb in the area of work | $8,000 |
| Jun 13, 2013 | Never finaled issued Jun 2013, no final | 1835 Franklin St | remodel master bath - guest bath in #1002. master: retile shower, rebuld shower pan, install new plumb& elec fixtures & cabinets. relocate laundry to bathroom. guest bath: retile r&r tubs, & shower valve, install new plumb & elec fixutres & cabinets for out walls to accomodate new plumbing fixtureDetails
remodel master bath - guest bath in #1002. master: retile shower, rebuld shower pan, install new plumb& elec fixtures & cabinets. relocate laundry to bathroom. guest bath: retile r&r tubs, & shower valve, install new plumb & elec fixutres & cabinets for out walls to accomodate new plumbing fixture | $20,000 |