Back to kitchen remodel contractors
Thomas Christopher Tilton
- Based in
- San Francisco
- On San Francisco permits
- Jun 2013 to Nov 2023
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 4 never finaled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2022 | Completed final sign-off Apr 2023 | 1557 Treat Av | replace kitchen cabinets, appliance, and flooring. ugrade extg electrical. one kitchen remodel, non structural.Details
replace kitchen cabinets, appliance, and flooring. ugrade extg electrical. one kitchen remodel, non structural. | $18,000 |
| Jul 3, 2019 | Completed final sign-off Dec 2019 | 1559 Treat Av | remove and replace kitchen counters and cabinets. in kind remodel on the 2nd floor, no moving of doors or walls.Details
remove and replace kitchen counters and cabinets. in kind remodel on the 2nd floor, no moving of doors or walls. | $10,000 |