Badger Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2009 to Apr 2024
- Last 24 months
- 0 permits filed
44 permits since 2000: 42 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2024 | Completed final sign-off Sep 2024 | 2101 Hayes St | revision to pa# 2018-1203-7313 residential soft story replace lines of plywood shear with mitek hardy panels at grid 4 & b. remove new foundation at grid 3 (residential)Details
revision to pa# 2018-1203-7313 residential soft story replace lines of plywood shear with mitek hardy panels at grid 4 & b. remove new foundation at grid 3 (residential) | |
| Apr 25, 2024 | Completed final sign-off Sep 2024 | 2101 Hayes St | revision to 201812037312. replace line of plywood shear with mitek hardy panels at grid 4 and grid 8. remove new foundation at grid 3. (commerical)Details
revision to 201812037312. replace line of plywood shear with mitek hardy panels at grid 4 and grid 8. remove new foundation at grid 3. (commerical) | |
| Mar 19, 2024 | Completed final sign-off Jul 2024 | 465 Oak St | voluntary strengthening per ab-094. remove (e) rear facing windowDetails
voluntary strengthening per ab-094. remove (e) rear facing window | $25,000 |
| Sep 7, 2023 | Completed final sign-off Dec 2023 | 204 Divisadero St | replace approx 60'0" of brick foundation with reinforced concrete and voluntary seismic upgrade at the first floor.Details
replace approx 60'0" of brick foundation with reinforced concrete and voluntary seismic upgrade at the first floor. | $20,000 |
| Oct 28, 2022 | Completed final sign-off Jan 2023 | 178 Anderson St | two rear yard retaining wall replacement (under deck and under porch). no rear yard excavation. cap existing foundation (approx. 7ft).Details
two rear yard retaining wall replacement (under deck and under porch). no rear yard excavation. cap existing foundation (approx. 7ft). | $25,000 |
| Mar 29, 2021 | Completed final sign-off Nov 2022 | 772 27th St | replacement of rear yard retaining walls.Details
replacement of rear yard retaining walls. | $10,000 |
| Dec 21, 2020 | Completed final sign-off Feb 2021 | 1906 Hyde St | rev to pa2017111439: replace concrete wall with moment frame and reuse moment frame.Details
rev to pa2017111439: replace concrete wall with moment frame and reuse moment frame. | |
| Jul 3, 2019 | Completed final sign-off Dec 2019 | 2055 Hyde St | strengthening of walls at garage storage level of (e) 2-unit, 3-story building. addition of stell moment frame, plywood sheating, anchor bolts, hold-downs and shear clipsDetails
strengthening of walls at garage storage level of (e) 2-unit, 3-story building. addition of stell moment frame, plywood sheating, anchor bolts, hold-downs and shear clips | $48,000 |
| Apr 30, 2018 | Never finaled issued Apr 2018, no final | 2459 Larkin St | street spaceDetails
street space | |
| Dec 5, 2017 | Never finaled issued Dec 2017, no final | 388 05th St | street spaceDetails
street space | |
| Oct 4, 2017 | Completed final sign-off Mar 2020 | 1030 Lake St | soft story retrofit per sfebc hapter 4d. engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc hapter 4d. engineering criteria 2016 cebc appendix a-4. | $67,000 |
| Sep 11, 2017 | Completed final sign-off Jun 2018 | 2459 Larkin St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, addition of plywood shear walls, anchor bolts, hold down and shear clips at garage/crawls space. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, addition of plywood shear walls, anchor bolts, hold down and shear clips at garage/crawls space. n/a ordinance #155-13 | $80,000 |
| Aug 30, 2017 | Completed final sign-off Jun 2019 | 115 Graystone Tr | compliance with mandatory seismic retrofit program per 2016 iebc app a4.Details
compliance with mandatory seismic retrofit program per 2016 iebc app a4. | $40,000 |
| Aug 30, 2017 | Completed final sign-off Feb 2019 | 1059 Clement St | compliance w/ mandatory soft story retrofit program, cebc 2016 app. a-4. sfebc 2016 chp. 4d.Details
compliance w/ mandatory soft story retrofit program, cebc 2016 app. a-4. sfebc 2016 chp. 4d. | $80,000 |
| Aug 30, 2017 | Completed final sign-off Mar 2019 | 110 Terra Vista Av | compliance w/ mandatory soft story retrofit program per 2016 sfebc sec. 4d 2016 cebc apex a-4Details
compliance w/ mandatory soft story retrofit program per 2016 sfebc sec. 4d 2016 cebc apex a-4 | $25,000 |
| Aug 30, 2017 | Completed final sign-off Jul 2019 | 800 Corbett Av | compliance w/ mandatory soft story retrofit program, cebc 2016 app. a-4. sfebc 2016 chp. 4d.Details
compliance w/ mandatory soft story retrofit program, cebc 2016 app. a-4. sfebc 2016 chp. 4d. | $50,000 |
| Nov 9, 2016 | Completed final sign-off Mar 2017 | 1490 Chestnut St | the strengthening of the walls at the garage/storage level, including additoin of plywood sheating, anchor bolts, holddowns, shear clips, & collectors.Details
the strengthening of the walls at the garage/storage level, including additoin of plywood sheating, anchor bolts, holddowns, shear clips, & collectors. | $30,000 |
| Nov 7, 2016 | Completed final sign-off Nov 2017 | 180 Clifford Tr | compliance with mandatory soft story retrofit program iebc 2012 app a4.Details
compliance with mandatory soft story retrofit program iebc 2012 app a4. | $55,000 |
| Aug 26, 2016 | Completed final sign-off Sep 2016 | 657 47th Av | revision to application 201603303507, install a new hardy panel & grade beam where the proposed shear wall conflicted with (e) ducting.Details
revision to application 201603303507, install a new hardy panel & grade beam where the proposed shear wall conflicted with (e) ducting. | $3,500 |
| Aug 25, 2016 | Completed final sign-off Feb 2018 | 388 05th St | compliance with mandatory soft story retrofit program, iebc 2012 app a-4. ** maher: n/a **Details
compliance with mandatory soft story retrofit program, iebc 2012 app a-4. ** maher: n/a ** | $50,000 |
| Jun 3, 2016 | Completed final sign-off Jul 2016 | 236 Douglass St | revision to ref pa 201601157243: steel moment frame related now plywood subdiaphragm with blocking addedDetails
revision to ref pa 201601157243: steel moment frame related now plywood subdiaphragm with blocking added | $5,000 |
| Apr 15, 2016 | Completed final sign-off May 2016 | 2250 Van Ness Av | revision to pa 2015-1216-5311 provide (2) new foundations, (2) (n) simpson strong walls. relocate plywood shearwall. provide concrete cap design per iebc chapter a-4Details
revision to pa 2015-1216-5311 provide (2) new foundations, (2) (n) simpson strong walls. relocate plywood shearwall. provide concrete cap design per iebc chapter a-4 | $5,000 |
| Mar 30, 2016 | Completed final sign-off Sep 2016 | 657 47th Av | soft story - strengthening of the walls at the garage/utility level and lower residential unit level of the () 3 story bld. the specific stregthening includes the addition of plywood sheathing anchor bbolts, holddown and shear clips. iebc app chapter a4Details
soft story - strengthening of the walls at the garage/utility level and lower residential unit level of the () 3 story bld. the specific stregthening includes the addition of plywood sheathing anchor bbolts, holddown and shear clips. iebc app chapter a4 | $48,000 |
| Jan 15, 2016 | Completed final sign-off Jul 2016 | 236 Douglass St | ground floor: retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 for adding steel moment frames sheathing and new foundation. n/a for maherDetails
ground floor: retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 for adding steel moment frames sheathing and new foundation. n/a for maher | $80,000 |
| Dec 16, 2015 | Completed final sign-off May 2016 | 2250 Van Ness Av | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $40,000 |
| Oct 26, 2015 | Completed final sign-off Nov 2015 | 1683 24th Av | replace 4 windows, same size in kind from alum to marvin wood. integrity windows.Details
replace 4 windows, same size in kind from alum to marvin wood. integrity windows. | $1,000 |
| Aug 4, 2015 | Completed final sign-off Mar 2016 | 300 Green St | soft story mitigation , addition of steel moment frame at garage opening, plywood shearwalls, holddowns, anchors, shear clips per iebc chapter a4Details
soft story mitigation , addition of steel moment frame at garage opening, plywood shearwalls, holddowns, anchors, shear clips per iebc chapter a4 | $65,000 |
| May 26, 2015 | Completed final sign-off Jun 2015 | 605 Lyon St | revision to pa 2014 0820 4309 - add 16 linea; feet of new foundation to support only a garage roof. to replace the (e) inadequate foundation.Details
revision to pa 2014 0820 4309 - add 16 linea; feet of new foundation to support only a garage roof. to replace the (e) inadequate foundation. | $3,000 |
| Sep 17, 2014 | Completed final sign-off Jul 2015 | 960 Pine St | compliance w/ mandatory soft story seismic retrofit program. sfbc chap 34b/2012 iebc a4Details
compliance w/ mandatory soft story seismic retrofit program. sfbc chap 34b/2012 iebc a4 | $30,000 |
| Aug 20, 2014 | Completed final sign-off Jun 2015 | 605 Lyon St | soft story retrofit per sfbc chapter 34b. 2012 iebc chapter a-4Details
soft story retrofit per sfbc chapter 34b. 2012 iebc chapter a-4 | $80,000 |
| Aug 18, 2014 | Completed final sign-off Mar 2015 | 3435 24th St | strengthening of the walls at the garage/storage level. the specific strengthening includes the addition of steel frames at the garage door openins, plywood sheathing, anchor bolts, hold downs & shear clips, strengthening to satisfy the soft story mandatory requirements,2012 iebc appendix a-4.Details
strengthening of the walls at the garage/storage level. the specific strengthening includes the addition of steel frames at the garage door openins, plywood sheathing, anchor bolts, hold downs & shear clips, strengthening to satisfy the soft story mandatory requirements,2012 iebc appendix a-4. | $80,000 |
| Jun 9, 2014 | Completed final sign-off Sep 2014 | 505 Church St | soft story mitigation:strengthening of the walls at the retail and storage level includes one steel frame at the north side retail window opening, shear ply anchor bolts holdowns and shear clips per 2012 iebc appendix a-4. accessibility compliance shall be under seperate t.i. permit per sfbc ab-017.Details
soft story mitigation:strengthening of the walls at the retail and storage level includes one steel frame at the north side retail window opening, shear ply anchor bolts holdowns and shear clips per 2012 iebc appendix a-4. accessibility compliance shall be under seperate t.i. permit per sfbc ab-017. | $92,000 |
| May 23, 2014 | Completed final sign-off Jan 2015 | 1895 Chestnut St | strengthen the garage level per sfbc soft story retrofit (requirements). remove four posts at garage & add a beams. 2012 iebc appendix a-4. n/a maher ordinance 155-13Details
strengthen the garage level per sfbc soft story retrofit (requirements). remove four posts at garage & add a beams. 2012 iebc appendix a-4. n/a maher ordinance 155-13 | $140,000 |
| Jan 28, 2014 | Completed final sign-off Jun 2014 | 3334 Fillmore St | soft story mitigation at garage level. new frames, shear walls, anchor bolts, hold downs and shear clips. sfbc ch34b. iebc a4Details
soft story mitigation at garage level. new frames, shear walls, anchor bolts, hold downs and shear clips. sfbc ch34b. iebc a4 | $110,000 |
| Jan 28, 2014 | Completed final sign-off Jun 2014 | 3344 Fillmore St | soft story mitigation at garage level. new frames, shear walls, anchor bolts, hold downs, shear clips. sfbc 34b. iebc a4Details
soft story mitigation at garage level. new frames, shear walls, anchor bolts, hold downs, shear clips. sfbc 34b. iebc a4 | $110,000 |
| Oct 25, 2013 | Completed final sign-off Feb 2014 | 84 Buena Vista Tr | install a 23' length of concrete sister wall. inboard of an extg distressed landscaping retaining wall.Details
install a 23' length of concrete sister wall. inboard of an extg distressed landscaping retaining wall. | $14,000 |
| Apr 3, 2013 | Completed final sign-off Apr 2013 | 1160 Pine St | cap 16 l.f. of rear foundation along western property line as per district inspector due to dryrot w/(n) 3 x sill plate w/ 5/8" 0 x 32" o.c. a.b. min. dowel cap into (e) footing with #4 @16" o.c. rebar 7" embed epoxyDetails
cap 16 l.f. of rear foundation along western property line as per district inspector due to dryrot w/(n) 3 x sill plate w/ 5/8" 0 x 32" o.c. a.b. min. dowel cap into (e) footing with #4 @16" o.c. rebar 7" embed epoxy | $2,500 |
| Jul 27, 2012 | Completed final sign-off Feb 2013 | 349 Cherry St | revision to app#201203266846. revision to extg permit, use shotcrete for retaining walls.Details
revision to app#201203266846. revision to extg permit, use shotcrete for retaining walls. | |
| Jun 20, 2012 | Completed final sign-off May 2014 | 1160 Pine St | seismic strengthening at ground floor levelDetails
seismic strengthening at ground floor level | $50,000 |
| Mar 26, 2012 | Completed final sign-off Feb 2013 | 349 Cherry St | structural 104 ft strengthening including rebuilding the deck in kind (remove (e) cmu walls @ deck).Details
structural 104 ft strengthening including rebuilding the deck in kind (remove (e) cmu walls @ deck). | $100,000 |
| Feb 2, 2011 | Completed final sign-off Apr 2011 | 134 Chenery St | partial foundation replacement and lower level strengthening (bracing at cripple walls. )Details
partial foundation replacement and lower level strengthening (bracing at cripple walls. ) | $49,000 |
| Oct 26, 2010 | Completed final sign-off Jun 2011 | 1745 Jones St | stair repair & partial foundation replacement @ front of building.Details
stair repair & partial foundation replacement @ front of building. | $30,000 |
| Feb 16, 2010 | Completed final sign-off Jun 2010 | 2221 Scott St | addition of new 2nd story deck with unconditioned storage room below deck. ref app 200705090762Details
addition of new 2nd story deck with unconditioned storage room below deck. ref app 200705090762 | $15,000 |
| Oct 26, 2009 | Completed final sign-off Jun 2010 | 775 18th Av | voluntary strengthening of (e) foundation on ground floor, non-habitable spaceDetails
voluntary strengthening of (e) foundation on ground floor, non-habitable space | $15,000 |