Block 0492, lot 029
3344 Fillmore St
- City’s use
- Multi-Family Residential
- Built
- 1963
- Stories
- 3
- Units
- 15
- Rooms
- 15 bathrooms
- Building
- 11,661 sq ft
- Lot
- 5,672 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2024 | Completed final sign-off Mar 2025 | 3344 Fillmore St | Affinity Construction | unit #102: remodel of kitchen and bathroom like kind, new plumbing fixtures electrical subpanel upgrade, sheetrock, no wall demolition or construction.Details
unit #102: remodel of kitchen and bathroom like kind, new plumbing fixtures electrical subpanel upgrade, sheetrock, no wall demolition or construction. | $55,000 |
| Sep 15, 2023 | Completed final sign-off Nov 2023 | 3344 Fillmore St | Gladiator Construction | unit 101: one kitchen remodel new cabinets counter top. one bath remodel new vanity, plumbing toilet electrical upgrade (subpanel)Details
unit 101: one kitchen remodel new cabinets counter top. one bath remodel new vanity, plumbing toilet electrical upgrade (subpanel) | $35,000 |
| Aug 14, 2023 | Completed final sign-off Oct 2023 | 3344 Fillmore St | Firelectric | upgrade f/a system, ab3.08, add low frequency sounders to all sleeping area w/add-on power supplyDetails
upgrade f/a system, ab3.08, add low frequency sounders to all sleeping area w/add-on power supply | $28,500 |
| Dec 15, 2022 | Completed final sign-off Mar 2023 | 3344 Fillmore St | Gladiator Construction | #304:remodel of new kitchen and bathroom. design like for likeDetails
#304:remodel of new kitchen and bathroom. design like for like | $35,000 |
| Apr 1, 2021 | Completed final sign-off Jun 2021 | 3344 Fillmore St | Gladiator Construction | remodel of kitchen and bath like for likeDetails
remodel of kitchen and bath like for like | $35,000 |
| Jul 9, 2019 | Completed final sign-off Sep 2019 | 3344 Fillmore St | Gladiator Construction | uint 204: kitchen bath remodel new shower valve, kitchen cabinets, upgrade sub panel, angle stops, bath size 5x9, kitchen 8x8Details
uint 204: kitchen bath remodel new shower valve, kitchen cabinets, upgrade sub panel, angle stops, bath size 5x9, kitchen 8x8 | $31,405 |
| Aug 1, 2016 | Completed final sign-off Oct 2016 | 3344 Fillmore St | Gladiator Construction | kitchen remodel. upgrade, bathroom upgrade , movepanel from closet, new shower valve in unit # 205Details
kitchen remodel. upgrade, bathroom upgrade , movepanel from closet, new shower valve in unit # 205 | $15,000 |
| Jan 28, 2014 | Completed final sign-off Jun 2014 | 3344 Fillmore St | Badger Construction | soft story mitigation at garage level. new frames, shear walls, anchor bolts, hold downs, shear clips. sfbc 34b. iebc a4Details
soft story mitigation at garage level. new frames, shear walls, anchor bolts, hold downs, shear clips. sfbc 34b. iebc a4 | $110,000 |
| Aug 14, 2013 | Completed final sign-off Feb 2014 | 3344 Fillmore St | New Pacific Roofing Company Inc | reroofingDetails
reroofing | $36,800 |
| Oct 19, 2011 | Never finaled issued Oct 2011, no final | 3344 Fillmore St | Westech Roofing Co | reroofingDetails
reroofing | $5,170 |
| Apr 11, 2011 | Completed final sign-off Apr 2011 | 3344 Fillmore St | East County Glass & Window | unit #201-retrofitting 3 aluminum windows with paintable vinyl windows, visible from the streetDetails
unit #201-retrofitting 3 aluminum windows with paintable vinyl windows, visible from the street | $2,000 |
| Sep 3, 2004 | Completed final sign-off Sep 2004 | 3344 Fillmore St | Zebra Awning Co Inc | fabricate and install 1 new box awning over entrance.Details
fabricate and install 1 new box awning over entrance. | $750 |
| May 27, 2003 | Completed final sign-off Jul 2003 | 3344 Fillmore St | On-Site Maintenance | remove (e), install kitchen cabinets , sink, p=trap & water supplies lines in kitchen, new dishwasheDetails
remove (e), install kitchen cabinets , sink, p=trap & water supplies lines in kitchen, new dishwashe | $5,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.